Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19242B005 + (18:45:48, 4 January 2025)
- ML19242B003 + (18:45:49, 4 January 2025)
- ML19242A997 + (18:45:51, 4 January 2025)
- ML19242A995 + (18:45:54, 4 January 2025)
- ML19242A992 + (18:46:01, 4 January 2025)
- ML19242A991 + (18:46:03, 4 January 2025)
- ML19242A990 + (18:46:05, 4 January 2025)
- ML19242A988 + (18:46:07, 4 January 2025)
- ML19242A987 + (18:46:08, 4 January 2025)
- ML19242A982 + (18:46:11, 4 January 2025)
- ML19242A981 + (18:46:12, 4 January 2025)
- ML19242A979 + (18:46:13, 4 January 2025)
- ML19242A977 + (18:46:15, 4 January 2025)
- ML19242A976 + (18:46:17, 4 January 2025)
- ML19242A973 + (18:46:18, 4 January 2025)
- ML19242A972 + (18:46:23, 4 January 2025)
- ML19242A971 + (18:46:24, 4 January 2025)
- ML19242A969 + (18:46:25, 4 January 2025)
- ML19242A968 + (18:46:27, 4 January 2025)
- ML19242A967 + (18:46:28, 4 January 2025)
- ML19242A958 + (18:46:31, 4 January 2025)
- ML19242A956 + (18:46:33, 4 January 2025)
- ML19242A907 + (18:46:36, 4 January 2025)
- 05000325/LER-1979-042-03, /03L-0 on 790706:support Beams for Snubber B RHR Heat Exchanger Steam Condensing Line Were Unable to Carry Loads Under Worst Case Seismic Conditions.Cause Unstated. Beams Reinforced Per Redesign & Plant Mod + (18:46:38, 4 January 2025)
- 05000325/LER-1979-048-03, /03L-0 on 790713:during High Streamline Functional Test,Monitor B Was Found Out of Calibr.Caused by Instrument Drift.Instrument Recalibr & Returned to Svc + (18:46:40, 4 January 2025)
- 05000325/LER-1979-048, Forwards LER 79-048/03L-0 + (18:46:45, 4 January 2025)
- 05000263/LER-1979-012, Forwards LER 79-012/03L-0 + (18:46:47, 4 January 2025)
- 05000333/LER-1979-041-03, /03L-0 on 790711:procedure for Drywell Equipment Drain Pump Functional Test & Calibr Was in Error.Caused by Implementation of Plant Mod During 1978 Refueling Outage in Which Equipment Pump Level Control Logic Was Revised + (18:46:49, 4 January 2025)
- 05000325/LER-1979-042, Forwards LER 79-042/03L-0 + (18:46:51, 4 January 2025)
- 05000333/LER-1979-041, Forwards LER 79-041/03L-0 + (18:46:53, 4 January 2025)
- ML19242A869 + (18:46:54, 4 January 2025)
- ML19242A867 + (18:46:56, 4 January 2025)
- ML19242A866 + (18:46:57, 4 January 2025)
- ML19242A865 + (18:46:58, 4 January 2025)
- 05000325/LER-1979-044-03, /03L-0 on 790706:while Performing Reactor Low Water Level 1 Channel Calibr,Switch 1 Found Out of Tolerance Low.Caused by Instrument Drift.Instrument Recalibr & Returned to Svc + (18:46:59, 4 January 2025)
- 05000333/LER-1979-042-03, /03L-0 on 790713:RHR Svc Water Pump 10-P-1A & 10-P-1C Could Deliver Only 7800 Gallons Per Minute.Caused by Installation of Improper Orifice in RHR Svc Water Discharge Line.Orifice Removed & Willbe Modified + (18:47:01, 4 January 2025)
- ML19242A862 + (18:47:03, 4 January 2025)
- 05000333/LER-1979-042, Forwards LER 79-042/03L-0 + (18:47:05, 4 January 2025)
- ML19242A857 + (18:47:06, 4 January 2025)
- 05000333/LER-1979-043-03, /03L-0 on 790718:discharge Check Valve Associated W/Electric Motor Driven Fire Pump Failed to Properly Reseat Following Pump Shutdown.Caused by Small Pebble Between Valve Clapper & Valve Body.Returned to Svc + (18:47:08, 4 January 2025)
- ML19242A855 + (18:47:09, 4 January 2025)
- 05000325/LER-1979-044, Forwards LER 79-044/03L-0 + (18:47:10, 4 January 2025)
- ML19242A852 + (18:47:12, 4 January 2025)
- 05000333/LER-1979-043, Forwards LER 79-043/03L-0 + (18:47:14, 4 January 2025)
- 05000346/LER-1979-073-03, /03L-0 on 790708:during Checkout of Valve Relay, Main Steam Inlet to Auxiliary Feed Pipe Turbine 1-1 Isolation Valve Torqued While Opening.Caused by Normal Valve Wear.Valve Was Readjusted & Returned to Svc + (18:47:17, 4 January 2025)
- 05000346/LER-1979-073, Forwards LER 79-073/03L-0 + (18:47:19, 4 January 2025)
- ML19242A843 + (18:47:20, 4 January 2025)
- 05000366/LER-1979-067-03, /03L-0 on 790707:while Performing Sequence of HPCI Quick Start Test,Breaker for 2E41-F001 Valve Tripped. Caused by Motor Failure on Valve.Motor Was reworked,bench-tested, Reinstalled & Operated Satisfactorily + (18:47:24, 4 January 2025)
- 05000346/LER-1979-072-03, /03L-0 on 790708:position Indication on Rod Two of Group Eight Was Inoperable.Caused by Component Failure of Reed Switch within Position Indicator Tube.Part Was Replaced & Returned to Svc + (18:47:26, 4 January 2025)
- 05000333/LER-1979-044-03, /03L-0 on 790720:mainstream Line Tunnel Radiation Monitor D Drifted So That Indicator & Trip Point Were Approx 5.5% Low.Caused by Instrument Drift.Instrument Calibr & Tested + (18:47:29, 4 January 2025)
- 05000346/LER-1979-072, Forwards LER 79-072/03L-0 + (18:47:31, 4 January 2025)