ML19242B005

From kanterella
Jump to navigation Jump to search
Requests Cooperation in data-gathering Activities to Provide NRC Commissioners,Public & Media w/up-to-date Operating Status of Power Reactors.Info Requests Will Not Be Made While Plant Is in Shutdown Mode
ML19242B005
Person / Time
Site: Farley 
Issue date: 07/19/1979
From: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Clayton F
ALABAMA POWER CO.
References
NUDOCS 7908070300
Download: ML19242B005 (2)


Text

.I I e^

? ~,,?
4. NITED STATES g 3., 7 f' 'j NUCLt "F

.;8JL ATORY CO*.1 MISSION

, 4 l, c

HEGION 11 3 [e.

,[

101 M ARIE TT A si.. N.W.. sulTE 3100

'N

?

AT L ANT A. GE oRGI A 303o3 JUL 191979 In Reply Refer To:

RII:JP0 50-348 Alabama Power Company ATTN:

F. L. Clayton, Jr.

Senior Vice President P. O. Box 2641 Birmingham, AL 35291 Gentlemen:

Sinc, the Three Mile Island incident, the NRC Commissioners, the public and the media Lave expresseo an increased interest in the status cf operating nuclear power plants and fuel facilities. This interest has now reached a level where it is desirable to know, on a daily basts, the status of nuclear facilities with an operating license. We request your cooperation in obtaining this informatic 1.

We plan to contact each operating tacility on the dedicated phone during the last half of the 12:00 midnight to 8:00 a.m.

shift each day.

This call will also be used as the check of the dedicated telephone line. The amcunt of time required should not exceed one or two minutes for any facility since we will only be asking for the operating stutus of each plant. If a unit is not fully operational, we would like to have a very brief description of the reason for this. During prolonged outages, we will not make these status calls. Implemen-tation of this program will start Monday, July 23, 1979.

Flease notify your responsible plaat personnel of this program. If you have any ques.tions, please call the Regional Office.

Sincerely, mO

. mes P. O'Reilly D rector cc:

A. R. Barton Executive Vice President P. O. Box 2641 Birmingham, AL 35291 H. O. Thrash Manager-Nuclear Generation P. O. Box 2641 Birmingham, AL 35291 7 ~ ~!'

cc's Continued k b r)

JJ Op Page 2 7908070 % O

Alabama Power Company JUL 191979 cc:

C. Biddinger, Jr.

Manager-Corporate Quality Assurance P. O. Box 2641 Birmingham, AL 35291 W. G. Hairston, III Plant Manager Drawer 470 Ashford, AL 36312 R. E. Hollands, Jr.

QA Supervisor P. C Box U Ashford, AL 36312 J. T. Young Vice President-Production Post Office Box 2641 Birmingham,.\\labama 35291 469 330