ML19242A973

From kanterella
Jump to navigation Jump to search
Requests Cooperation in data-gathering Activities to Provide NRC Commissioners,Public & Media w/up-to-date Operating Status of Power Reactors.Info Requests Will Not Be Made While Plant Is in Shutdown Mode
ML19242A973
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 07/18/1979
From: Grier B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Lundvall A
BALTIMORE GAS & ELECTRIC CO.
References
NUDOCS 7908070227
Download: ML19242A973 (1)


Text

Ih a

e rco UNITED STATES

[ j* "# cg(' h NUCLEAR REGULATORY COMMISSION 3 A' 6

s REGION I Y

631 PARK AVENUE

%.'.W.. [.,e S'

KING OF PRUSSIA, PENNSYLVANIA 19406 Docket Nos. 50-317 July 18,1979 50-318 Baltimore Gas and Electric Company ATTN:

Mr. A. E. Lundvall, Jr.

Vice Presidert, Supply P. 0. Box 1475 Baltimore, Maryland 21203 Gentlemen:

Since the Three Mile Island incident, the NRC Comissioners, the public and the media have expressed an increased interest in the status of operating nuclear power plants and fuel facilities. This interest has now reached a level where it is desirable to know, on a daily basis, the status of nuclear facilities with an operating license.

We request your cooperation in obtaining this information. We plan to contact each operating facility on the dedicated phone during the last half of the 12:00 midnight to 8:00 a.m.

shift each day. This call will also be used as the check of the dedicated telephone line. The amount of time required should not exceed one or two minutes for any facility since we will only be asking for the operating status of each plant.

If a unit is not fully operational, we would like to have a very brief description of the reason for this.

During prolonged outages, we will not make these. status calls.

Implementation of this program will start Monday, July 23, 1979.

Please notify your responsible plant personnel of this program.

If you have any questions please call the Regional Office.

Sincerely,

/k Boyce H. Grier

' " Director cc:

R. M. Douglass, Manager, Quality Assurance L. B. Russell, Chief Engirz e:

W. Gibson, General Supervisor, Operations QA R. C. L_ Olson, Senior Engineer K. H. Sebra, Principal Engineer R. Denton g

300 790B07