Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000280/LER-1979-025-03, /03L-0:on 790906,during Review of 1978 Reactor Coolant Activity Records,Discovered Excessive Reactor Coolant Activity Occurred & Not Reported.Iodine Spike Caused by Reactor Trip.Specific Sampling Program Initiated + (13:39:04, 4 January 2025)
- ML19253B257 + (13:39:05, 4 January 2025)
- 05000280/LER-1979-025, Forwards LER 79-025/03L-0 + (13:39:07, 4 January 2025)
- ML19253B254 + (13:39:07, 4 January 2025)
- ML19253B253 + (13:39:09, 4 January 2025)
- ML19253B251 + (13:39:10, 4 January 2025)
- IR 05000344/1979014 + (13:39:11, 4 January 2025)
- ML19253B249 + (13:39:13, 4 January 2025)
- ML19253B247 + (13:39:14, 4 January 2025)
- ML19253B246 + (13:39:15, 4 January 2025)
- IR 05000312/1979013 + (13:39:16, 4 January 2025)
- ML19253B243 + (13:39:17, 4 January 2025)
- ML19253B241 + (13:39:24, 4 January 2025)
- ML19253B240 + (13:39:25, 4 January 2025)
- ML19253B239 + (13:39:26, 4 January 2025)
- ML19253B235 + (13:39:27, 4 January 2025)
- ML19253B234 + (13:39:27, 4 January 2025)
- ML19253B233 + (13:39:29, 4 January 2025)
- ML19253B231 + (13:39:29, 4 January 2025)
- ML19253B230 + (13:39:30, 4 January 2025)
- ML19253B171 + (13:39:31, 4 January 2025)
- ML19253B167 + (13:39:32, 4 January 2025)
- ML19253B165 + (13:39:33, 4 January 2025)
- ML19253B146 + (13:39:39, 4 January 2025)
- ML19253B130 + (13:39:40, 4 January 2025)
- ML19253B078 + (13:39:41, 4 January 2025)
- ML19253B066 + (13:39:42, 4 January 2025)
- ML19253B064 + (13:39:45, 4 January 2025)
- 05000317/LER-1979-032-03, /03L-0:on 790806,12 Charging Pumps Placed Out of Svc Due to Low Suction Pressure.Caused by Faulty Pressure Indicating Switch 1-PC-224Y.Internal Parts of Switch Replaced & Pump Returned to Svc + (13:39:47, 4 January 2025)
- 05000317/LER-1979-032, Forwards LER 79-032/03L-0 + (13:39:48, 4 January 2025)
- ML19253B060 + (13:39:49, 4 January 2025)
- ML19253B058 + (13:39:51, 4 January 2025)
- 05000318/LER-1979-030-03, /03L-0:on 790805,control Element Assemblies 6,7, 49,51 & 53 Failed to Initiate Motion Inhibit Function. Caused by Drifting of Motion Inhibit Setpoint Voltage Levels.Setpoints Will Be Reduced + (13:39:52, 4 January 2025)
- 05000318/LER-1979-030, Forwards LER 79-030/03L-0 + (13:39:55, 4 January 2025)
- 05000333/LER-1979-006-03, /03X-1:on 790124,during Normal Operations,Ground Fault on 125 Station Battery a Noted.Caused by Bellows Failure on Pressure Switch Circuit safety-relief Valve 02-RV-71J.Ground Cleared.Valve Restored to Operation + (13:39:57, 4 January 2025)
- 05000333/LER-1979-006, Forwards LER 79-006/03X-1 + (13:39:59, 4 January 2025)
- 05000366/LER-1979-094-03, /03L-0:on 790822,during Spray/Sprinkler Valve Checks,Only One Fire Pump Was Operable.Caused by Inadequate Procedures.Procedures Revised + (13:40:02, 4 January 2025)
- ML19253B048 + (13:40:04, 4 January 2025)
- 05000333/LER-1979-015-03, /03X-1:on 790315,during Load Reduction & Shutdown, Rod Sequence Control Sys Failed to Pass Operations Surveillance Test F-ST-23A.Cause Unstated.Mode Switch Moved from Shutdown Position.Sys Repaired + (13:40:06, 4 January 2025)
- ML19253B046 + (13:40:07, 4 January 2025)
- 05000366/LER-1979-094, Forwards LER 79-094/03L-0 + (13:40:08, 4 January 2025)
- 05000333/LER-1979-015, Forwards LER 79-015/03X-1 + (13:40:13, 4 January 2025)
- ML19253B040 + (13:40:14, 4 January 2025)
- ML19253B037 + (13:40:15, 4 January 2025)
- ML19253B038 + (13:40:15, 4 January 2025)
- ML19253B036 + (13:40:16, 4 January 2025)
- ML19253B035 + (13:40:16, 4 January 2025)
- ML19253B033 + (13:40:17, 4 January 2025)
- 05000259/LER-1979-018-01, /01T-0:on 790823,during Insp,Restraints on Certain Core Support Structure Sys Found Inoperable.Caused by Pipe Vibration &/Or Improper Installation During Const.Restraints in Units 1,2 & 3 Being Inspected.Rept Will Be Issued + (13:40:18, 4 January 2025)
- 05000259/LER-1979-018, Forwards LER 79-018/01T-0 + (13:40:20, 4 January 2025)
- 05000293/LER-1979-033-01, /01T-0:on 790828,reactor Scram Occurred as Result of Loss of All Offsite Power When Station Switchyard Was Struck by Lightning.Emergency Diesel Generators Functioned & Assumed Emergency Loads as Reactor Maneuvered to Shutdow + (13:40:23, 4 January 2025)