ML19253B146
ML19253B146 | |
Person / Time | |
---|---|
Site: | Davis Besse, Perry |
Issue date: | 09/12/1979 |
From: | Goldberg R GOLDBERG, FIELDMAN & LETHAM, P.C. |
To: | Harold Denton Office of Nuclear Reactor Regulation |
References | |
NUDOCS 7909180328 | |
Download: ML19253B146 (2) | |
Similar Documents at Davis Besse, Perry | |
---|---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217P2061999-10-26026 October 1999
[Table view]Forwards for First Energy Nuclear Operating Co Insp Rept 50-346/99-17 on 990928-1001.Insp Was Exam of Activities Conducted Under License Re Implementation of Physical Security Program.No Violations Identified ML20217N3851999-10-20020 October 1999 Forwards RAI Re Licensee 990521 Request for License Amend to Allow Irradiated Fuel to Be Stored in Cask Pit at Davis-Besse,Unit 1.Response Requested within 60 Days from Receipt of Ltr ML20217N2321999-10-15015 October 1999 Requests NRC Approval to Use Alternative to Requirements of 10CFR50.55a(f)(4)(ii).Licensee Requests Extension to Specified Schedule for Implementing Updates to IST Program ML20217F3901999-10-14014 October 1999 Discusses Request That Proprietary Document NEDE-32907P,DRF A22-0084-53, Safety Analysis Rept for Perry NPP 5% Power Uprate, Class III Dtd Sept 1999 Be Withheld.Determined Document Proprietary & Will Be Withheld ML20217G9201999-10-14014 October 1999 Discusses Utils Request for Approval of Quality Assurance Program Changes PY-CEI-NRR-2438, Informs That DBNPS & Pnpp Staffs Have Modified or Withdrawn Several of Positions Proposed within Re Request for Approval of Qap.Revised Positions Encl1999-10-14014 October 1999 Informs That DBNPS & Pnpp Staffs Have Modified or Withdrawn Several of Positions Proposed within Re Request for Approval of Qap.Revised Positions Encl PY-CEI-NRR-2435, Responds to NRC Re Violations Noted in Insp Rept 50-440/99-13.Corrective Actions:Ts SRs with Incorrect Descriptions Were Annotated to Ensure That CR Operators Are Aware That ACs Are Effect1999-10-13013 October 1999 Responds to NRC Re Violations Noted in Insp Rept 50-440/99-13.Corrective Actions:Ts SRs with Incorrect Descriptions Were Annotated to Ensure That CR Operators Are Aware That ACs Are Effect ML20217F8371999-10-0808 October 1999 Forwards Insp Rept 50-346/99-10 on 990802-0913.One Violation Occurred Being Treated as NCV ML20212L0691999-09-30030 September 1999 Forwards,For Review & Comment,Copy of Preliminary ASP Analysis of Operational Condition Discovered at Unit 1 on 981014,as Reported in LER 346/98-011 ML20217E7111999-09-30030 September 1999 Documents Telcon Conducted on 990929 Between M Underwood of Oh EPA & D Tizzan of Pnpp,Re Request to Operate Pnpp Sws,As Is,Until Resolution Can Be Obtained ML20217A5641999-09-30030 September 1999 Informs of Completion of mid-cycle PPR of Davis-Besse on 990901.Informs That NRC Plans to Conduct Addl Insps to Address Questions Raised by Issues Re Operator Errors & Failure to Commit to JOG Topical Rept on MOV Verification ML20212J1451999-09-30030 September 1999 Forwards Order,In Response to 990505 Application PY-CEI/NRR- 2394L.Order Approves Conforming License Amend Which Will Be Issued & Made Effective When Transfer Completed ML20212K9271999-09-30030 September 1999 Refers to 990927 Meeting Conducted at Perry Nuclear Power Plant to Discuss Initiatives in Risk Area & to Establish Dialog Between SRAs & PSA Staff ML20216J6701999-09-24024 September 1999 Forwards Post Examination Documentation for Written Operator Initial License Examination Administered at Davis-Besse Nuclear Power Station on 990920.Without Encls ML20212G4161999-09-24024 September 1999 Informs of Completion of Licensing Action for Generic Ltr 98-01, Y2K Readiness of Computer Systems at Nuclear Power Plants, for Perry Nuclear Power Plant ML20212G5811999-09-23023 September 1999 Informs That Licenses for Ta Lentz,License SOP-31449,PJ Arthur,License SOP-30921-1 & Dp Mott,License SOP-31500 Are Considered to Have Expired,Iaw 10CFR50.74(a),10CFR55.5 & 10CFR55.55 ML20212D3501999-09-21021 September 1999 Forward Copy of Final Accident Sequence Precursor Analysis of Operational Event at Plant,Unit 1 on 980624,reported in LER 346/98-006 PY-CEI-NRR-2432, Forwards NRC Form 536, Operator Licensing Exam Data, in Response to Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams1999-09-21021 September 1999 Forwards NRC Form 536, Operator Licensing Exam Data, in Response to Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams PY-CEI-NRR-2428, Submits Resolution to Seventh Question Proposed within NRC 980615 RAI Relating to Cooling Water Sys That Serve Containment Air Coolers & Assessment,Post Accident,Of Potential Water Hammer & two-phase Flow Conditions1999-09-16016 September 1999 Submits Resolution to Seventh Question Proposed within NRC 980615 RAI Relating to Cooling Water Sys That Serve Containment Air Coolers & Assessment,Post Accident,Of Potential Water Hammer & two-phase Flow Conditions ML20212D0151999-09-14014 September 1999 Requests Cancellation of NPDES Permit 3II00036.Permit Has Been Incorporated in Permit 3IB00016*ED.Discharge Point Sources & Associated Fees Currently Covered Under Permit 3IB00016*ED ML20212A8371999-09-13013 September 1999 Forwards Insp Rept 50-440/99-13 on 990712-30 & Notice of Violation.Insp Included Evaluation of Engineering Support, Design Change & Modification Activities,Internal Assessment Activities & Corrective Actions 05000346/LER-1998-001, Forwards Rev 1 for LER 1998-001,which Updates Corrective Actions & Revises Completion Date Re Implementation of Changes to Plant Emergency Operating Procedure.List of Commitments Attached1999-09-0909 September 1999 Forwards Rev 1 for LER 1998-001,which Updates Corrective Actions & Revises Completion Date Re Implementation of Changes to Plant Emergency Operating Procedure.List of Commitments Attached ML20217A8971999-09-0909 September 1999 Forwards Insp Rept 50-440/99-09 on 990709-0825.One Violation of NRC Requirements Occurred & Being Treated as NCV, Consistent with App C of Enforcement Policy PY-CEI-NRR-2431, Forwards Revised Emergency Plan for Perry NPP, IAW 10CFR50.54(q).Changes Constitute Revs,Temporary Changes or Reissued Pages1999-09-0909 September 1999 Forwards Revised Emergency Plan for Perry NPP, IAW 10CFR50.54(q).Changes Constitute Revs,Temporary Changes or Reissued Pages ML20211P3001999-09-0707 September 1999 Forwards FEMA Transmitting FEMA Evaluation Rept for 990504 Emergency Preparedness Exercise at Davis-Besse Nuclear Power Plant.No Deficiencies Identified.One Area Requiring C/A & Two Planning Issues Identified ML20216E5961999-09-0707 September 1999 Forwards Application for Amend to License NPF-3,revising Tech Specs 3/4.3.2.1,safety Features Actuation Sys Instrumentation & Associated Bases 3/4.3.1 & 3/4.3.2,reactor Protection Sys & Safety Sys Instrumentation ML20211Q6911999-09-0606 September 1999 Informs That NRC Tentatively Scheduled Initial Licensing Exam for Perry Operator License Applicants During Wks of 010108 & 15.Validation of Exam Will Occur at Station During Wk of 001218 IR 05000440/19990011999-08-31031 August 1999 Requests That Page Number 4, P2 Status of EP Facilities, Equipment & Resources, of Insp Rept 50-440/99-01 Be Replaced with Encl Rev ML20211K0951999-08-30030 August 1999 Forwards Request for Addl Info Re Fire & Seismic Analyses of IPEEE for Davis-Besse Nuclear Power Station,Unit 1. Response Requested within 60 Days ML20211K6681999-08-30030 August 1999 Forwards Copies of Certified Personal Qualification Statement - Licensee (NRC Form 398) for Operator Candidates Listed Below.Without Encls ML20211K6611999-08-30030 August 1999 Forwards Copies of Operator License Renewal Applications for Individuals Listed.Operators Have Successfully Completed Appropriate Operator Requalification Training Program at Dbnps.Without Encls PY-CEI-NRR-2425, Forwards Copy of Oh EPA Approval for Use of Nalco 7348 & Nalco 7468 at Pnpp,Iaw License NPF-58,App B,Epp,Section 3.21999-08-26026 August 1999 Forwards Copy of Oh EPA Approval for Use of Nalco 7348 & Nalco 7468 at Pnpp,Iaw License NPF-58,App B,Epp,Section 3.2 ML20211H0201999-08-25025 August 1999 Forwards semi-annual FFD Rept for 990101-0630 for DBNPS, Unit 1,IAW 10CFR26.71(d) ML20211D1171999-08-20020 August 1999 Forwards Insp Rept 50-346/99-09 on 990623-0802.Violations Identified & Being Treated as Noncited Violations ML20211G3911999-08-20020 August 1999 Forwards Update to Estimated Info for Licensing Action Requests Through 010930,re Administrative Ltr 99-02, Operating Reactor Licensing Action Estimates PY-CEI-NRR-2411, Informs That Firstenergy Nuclear Operating Co Has Developed Corporate QA Program Manual for Davis-Besse Nuclear Power Station & Perry Nuclear Power Plant,As Discussed on 990318 Between Util & Nrc.Revised USAR Pages,Encl1999-08-19019 August 1999 Informs That Firstenergy Nuclear Operating Co Has Developed Corporate QA Program Manual for Davis-Besse Nuclear Power Station & Perry Nuclear Power Plant,As Discussed on 990318 Between Util & Nrc.Revised USAR Pages,Encl ML20211B0161999-08-13013 August 1999 Forwards SE Accepting Evaluation of Second 10-year Interval Inservice Insp Program Request for Relief Numbers RR-A16, RR-A17 & RR-B9 for Plant,Unit 1 ML20211J9201999-08-13013 August 1999 Urges NRC to Find Funds for Stockpiling Radiation Pills for Residents Living Near Plant ML20210Q8421999-08-13013 August 1999 First Final Response to FOIA Request for Documents.Records Listed in App a Being Released in Entirety & Records Listed in App B Being Withheld in Part (Ref FOIA Exempt 5) ML20210T1061999-08-12012 August 1999 Forwards Preliminary NRC Forms 398 & 396 for Listed Candidates,Per Operator License Exam Scheduled for Week of 990913.Encl Withheld ML20210R7861999-08-12012 August 1999 Forwards Insp Rept 50-440/99-12 on 990712-16.No Violations Noted.New Emergency Preparedness Program Staff & Mgt Personnel Were Professional & Proactive ML20210S6071999-08-11011 August 1999 Provides Final Response to NRC RAI Re GL 98-01, Y2K Readiness of Computer Systems at Npps ML20210S3961999-08-11011 August 1999 Requests That Ten Listed Individuals Be Registered to Take 991006 BWR Gfes of Written Operating Licensing Exam.Two Listed Personnel Will Have Access to Exams Before Exams Are Administered ML20210Q7981999-08-10010 August 1999 Informs That Intention to Utilize Sulfuric Acid in Pnpp Circulating Water Sys to Lower Ph Is Anticipated to Be Completed in Nov ML20210Q5831999-08-10010 August 1999 Requests Permission to Chemically Treat CWS for Algae Due to Cooling Water Basin Becoming Infected with Algae of Various Types PY-CEI-NRR-2423, Provides Final Response to NRC GL 98-01, Y2K Readiness of Computer Sys at Npps. Remediation of Meteorological Monitoring Sys Has Been Completed & Ppnp Facility Is Now Y2K Ready1999-08-10010 August 1999 Provides Final Response to NRC GL 98-01, Y2K Readiness of Computer Sys at Npps. Remediation of Meteorological Monitoring Sys Has Been Completed & Ppnp Facility Is Now Y2K Ready PY-CEI-NRR-2422, Forwards Addl Info Re ASME Section IX Relief Request (IR-023) for Inservice Examination Program at Pnpp,Submitted on 9808261999-08-10010 August 1999 Forwards Addl Info Re ASME Section IX Relief Request (IR-023) for Inservice Examination Program at Pnpp,Submitted on 980826 PY-CEI-NRR-2421, Forwards Semiannual fitness-for-duty Rept,Iaw 10CFR26.71(d) for Pnpp Covering Period of 990101-9906301999-08-10010 August 1999 Forwards Semiannual fitness-for-duty Rept,Iaw 10CFR26.71(d) for Pnpp Covering Period of 990101-990630 ML20210P8051999-08-0909 August 1999 Forwards Insp Rept 50-346/99-15 on 990712-16.No Violations Noted.However,Several Deficiencies Were Identified with Implementation of Remp,Which Collectively Indicated Need for Improved Oversight of Program IR 05000346/19980211999-08-0606 August 1999 Refers to NRC Insp Rept 50-346/98-21 Conducted on 980901- 990513 & Forwards Nov.Two Violations Identified Involving Failure to Maintain Design of Valve & Inadequate C/A for Degraded Condition Cited in Encl NOV 1999-09-09 Category:INCOMING CORRESPONDENCE MONTHYEARML20217N2321999-10-15015 October 1999
[Table view]Requests NRC Approval to Use Alternative to Requirements of 10CFR50.55a(f)(4)(ii).Licensee Requests Extension to Specified Schedule for Implementing Updates to IST Program PY-CEI-NRR-2438, Informs That DBNPS & Pnpp Staffs Have Modified or Withdrawn Several of Positions Proposed within Re Request for Approval of Qap.Revised Positions Encl1999-10-14014 October 1999 Informs That DBNPS & Pnpp Staffs Have Modified or Withdrawn Several of Positions Proposed within Re Request for Approval of Qap.Revised Positions Encl PY-CEI-NRR-2435, Responds to NRC Re Violations Noted in Insp Rept 50-440/99-13.Corrective Actions:Ts SRs with Incorrect Descriptions Were Annotated to Ensure That CR Operators Are Aware That ACs Are Effect1999-10-13013 October 1999 Responds to NRC Re Violations Noted in Insp Rept 50-440/99-13.Corrective Actions:Ts SRs with Incorrect Descriptions Were Annotated to Ensure That CR Operators Are Aware That ACs Are Effect ML20216J6701999-09-24024 September 1999 Forwards Post Examination Documentation for Written Operator Initial License Examination Administered at Davis-Besse Nuclear Power Station on 990920.Without Encls ML20212G5811999-09-23023 September 1999 Informs That Licenses for Ta Lentz,License SOP-31449,PJ Arthur,License SOP-30921-1 & Dp Mott,License SOP-31500 Are Considered to Have Expired,Iaw 10CFR50.74(a),10CFR55.5 & 10CFR55.55 PY-CEI-NRR-2432, Forwards NRC Form 536, Operator Licensing Exam Data, in Response to Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams1999-09-21021 September 1999 Forwards NRC Form 536, Operator Licensing Exam Data, in Response to Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams PY-CEI-NRR-2428, Submits Resolution to Seventh Question Proposed within NRC 980615 RAI Relating to Cooling Water Sys That Serve Containment Air Coolers & Assessment,Post Accident,Of Potential Water Hammer & two-phase Flow Conditions1999-09-16016 September 1999 Submits Resolution to Seventh Question Proposed within NRC 980615 RAI Relating to Cooling Water Sys That Serve Containment Air Coolers & Assessment,Post Accident,Of Potential Water Hammer & two-phase Flow Conditions ML20212D0151999-09-14014 September 1999 Requests Cancellation of NPDES Permit 3II00036.Permit Has Been Incorporated in Permit 3IB00016*ED.Discharge Point Sources & Associated Fees Currently Covered Under Permit 3IB00016*ED 05000346/LER-1998-001, Forwards Rev 1 for LER 1998-001,which Updates Corrective Actions & Revises Completion Date Re Implementation of Changes to Plant Emergency Operating Procedure.List of Commitments Attached1999-09-0909 September 1999 Forwards Rev 1 for LER 1998-001,which Updates Corrective Actions & Revises Completion Date Re Implementation of Changes to Plant Emergency Operating Procedure.List of Commitments Attached PY-CEI-NRR-2431, Forwards Revised Emergency Plan for Perry NPP, IAW 10CFR50.54(q).Changes Constitute Revs,Temporary Changes or Reissued Pages1999-09-0909 September 1999 Forwards Revised Emergency Plan for Perry NPP, IAW 10CFR50.54(q).Changes Constitute Revs,Temporary Changes or Reissued Pages ML20216E5961999-09-0707 September 1999 Forwards Application for Amend to License NPF-3,revising Tech Specs 3/4.3.2.1,safety Features Actuation Sys Instrumentation & Associated Bases 3/4.3.1 & 3/4.3.2,reactor Protection Sys & Safety Sys Instrumentation ML20211K6611999-08-30030 August 1999 Forwards Copies of Operator License Renewal Applications for Individuals Listed.Operators Have Successfully Completed Appropriate Operator Requalification Training Program at Dbnps.Without Encls ML20211K6681999-08-30030 August 1999 Forwards Copies of Certified Personal Qualification Statement - Licensee (NRC Form 398) for Operator Candidates Listed Below.Without Encls PY-CEI-NRR-2425, Forwards Copy of Oh EPA Approval for Use of Nalco 7348 & Nalco 7468 at Pnpp,Iaw License NPF-58,App B,Epp,Section 3.21999-08-26026 August 1999 Forwards Copy of Oh EPA Approval for Use of Nalco 7348 & Nalco 7468 at Pnpp,Iaw License NPF-58,App B,Epp,Section 3.2 ML20211H0201999-08-25025 August 1999 Forwards semi-annual FFD Rept for 990101-0630 for DBNPS, Unit 1,IAW 10CFR26.71(d) ML20211G3911999-08-20020 August 1999 Forwards Update to Estimated Info for Licensing Action Requests Through 010930,re Administrative Ltr 99-02, Operating Reactor Licensing Action Estimates PY-CEI-NRR-2411, Informs That Firstenergy Nuclear Operating Co Has Developed Corporate QA Program Manual for Davis-Besse Nuclear Power Station & Perry Nuclear Power Plant,As Discussed on 990318 Between Util & Nrc.Revised USAR Pages,Encl1999-08-19019 August 1999 Informs That Firstenergy Nuclear Operating Co Has Developed Corporate QA Program Manual for Davis-Besse Nuclear Power Station & Perry Nuclear Power Plant,As Discussed on 990318 Between Util & Nrc.Revised USAR Pages,Encl ML20211J9201999-08-13013 August 1999 Urges NRC to Find Funds for Stockpiling Radiation Pills for Residents Living Near Plant ML20210T1061999-08-12012 August 1999 Forwards Preliminary NRC Forms 398 & 396 for Listed Candidates,Per Operator License Exam Scheduled for Week of 990913.Encl Withheld ML20210S6071999-08-11011 August 1999 Provides Final Response to NRC RAI Re GL 98-01, Y2K Readiness of Computer Systems at Npps ML20210S3961999-08-11011 August 1999 Requests That Ten Listed Individuals Be Registered to Take 991006 BWR Gfes of Written Operating Licensing Exam.Two Listed Personnel Will Have Access to Exams Before Exams Are Administered PY-CEI-NRR-2423, Provides Final Response to NRC GL 98-01, Y2K Readiness of Computer Sys at Npps. Remediation of Meteorological Monitoring Sys Has Been Completed & Ppnp Facility Is Now Y2K Ready1999-08-10010 August 1999 Provides Final Response to NRC GL 98-01, Y2K Readiness of Computer Sys at Npps. Remediation of Meteorological Monitoring Sys Has Been Completed & Ppnp Facility Is Now Y2K Ready PY-CEI-NRR-2422, Forwards Addl Info Re ASME Section IX Relief Request (IR-023) for Inservice Examination Program at Pnpp,Submitted on 9808261999-08-10010 August 1999 Forwards Addl Info Re ASME Section IX Relief Request (IR-023) for Inservice Examination Program at Pnpp,Submitted on 980826 PY-CEI-NRR-2421, Forwards Semiannual fitness-for-duty Rept,Iaw 10CFR26.71(d) for Pnpp Covering Period of 990101-9906301999-08-10010 August 1999 Forwards Semiannual fitness-for-duty Rept,Iaw 10CFR26.71(d) for Pnpp Covering Period of 990101-990630 05000346/LER-1998-009, Forwards LER 98-009-01,IAW 10CFR50.73(a)(2)(ii)(B). Commitments Made by Util Are Encl1999-08-0606 August 1999 Forwards LER 98-009-01,IAW 10CFR50.73(a)(2)(ii)(B). Commitments Made by Util Are Encl PY-CEI-NRR-2417, Forwards NP0059-007, Pnpp - Unit 1 ISI Summary Rept Results for Outage 7 (1999) First Period,Second Interval, IAW ASME Boiler & Pressure Vessel Code,Section XI,1989 Edition,Article IWA-60001999-08-0202 August 1999 Forwards NP0059-007, Pnpp - Unit 1 ISI Summary Rept Results for Outage 7 (1999) First Period,Second Interval, IAW ASME Boiler & Pressure Vessel Code,Section XI,1989 Edition,Article IWA-6000 ML20210G5521999-07-28028 July 1999 Provides Addl Response to 980923 OL Licensing Exam Rept 50-346/98-301 Re OL Exam Administered in Aug 1998.Results of Root Cause Investigation & Corrective Actions,Discussed ML20210H0491999-07-28028 July 1999 Forwards Application for Amend to License NPF-3,revising TS 3/4.7.5.1, Ultimate Heat Sink, to Allow Plant Operation in Modes 1-4 with Water Temp Less than or Equal to 90 F ML20210G3831999-07-27027 July 1999 Forwards Application for Amend to NPF-3,changing TSs 6.4, Training, 6.5.2.8, Audits, 6.10, Record Retention, 6.14, Process Control Program & 6.15, Odcm ML20210G5151999-07-26026 July 1999 Forwards Application for Amend to License NPF-3,revising Tech Specs for Implementation of 10CFR50,App J,Option B for Type B & C Containment Leakage Rate Testing ML20210G7151999-07-26026 July 1999 Forwards Application for Amend to License NPF-3,revising TSs 3/4.3.3.1, Radiation Monitoring Instrumentation, 3/4.3.3.2, Instrument - Incore Detectors & 3/4.3.3.9, Instrumentation - Waste Gas Sys Oxygen Monitor ML20210G4391999-07-26026 July 1999 Forwards Application for Amend to License NPF-3,revising Tech Specs 3/4.3.2.1, Safety Features Actuation Sys Instrumentation, & Associated Bases 3/4.3.1 & 3/4.3.2, Reactor Protection Sys & Safety Sys Instrumentation ML20210G3211999-07-26026 July 1999 Forwards Written OL Exam & Supporting Matl for Exam to Be Administered at DBNPS During Week of 990913.Listed Encls Withheld from Public Disclosure Until After Exam Complete ML20211P3071999-07-26026 July 1999 Forwards Final Rept for 990504 Biennial Radiological Emergency Preparedness Exercise for David-Besse Power Station.No Deficiencies Identified for Any Jurisdiction During Exercise PY-CEI-NRR-2419, Forwards Four Copies of Rev 27 to Pnpp Security Plan,Per 10CFR50.54(p)(2).Changes Have Been Determined Not to Decrease Effectiveness of Security Plan.Rev Withheld1999-07-21021 July 1999 Forwards Four Copies of Rev 27 to Pnpp Security Plan,Per 10CFR50.54(p)(2).Changes Have Been Determined Not to Decrease Effectiveness of Security Plan.Rev Withheld PY-CEI-NRR-2415, Submits Estimate of Number of Licensing Submittal for FY00 & 01,for Pnpp,Per Administrative Ltr 99-02, Operating Reactor Licensing Action Estimates1999-07-19019 July 1999 Submits Estimate of Number of Licensing Submittal for FY00 & 01,for Pnpp,Per Administrative Ltr 99-02, Operating Reactor Licensing Action Estimates ML20210A6441999-07-15015 July 1999 Advises That Listed Operator Licenses for Company Personnel Have Expired,As of 990715,per 10CFR50.74(a) & 10CFR55.5. Individuals Listed Have Assumed Responsibilities at Pnpp That Do Not Require Operator Licenses 05000346/LER-1998-012, Forwards LER 98-012-01,which Is Being Submitted to Provide Addl Info Re 981018 Occurrence.Commitment List Attached1999-07-0707 July 1999 Forwards LER 98-012-01,which Is Being Submitted to Provide Addl Info Re 981018 Occurrence.Commitment List Attached ML20209C3981999-07-0101 July 1999 Responds to NRC Re Violations Noted in Insp Rept 50-346/98-21.Corrective Actions:Developed Rev to Boric Acid Control Program & Work Process Guideline on Plant Leakage ML20211A3881999-06-30030 June 1999 Supplements Re NRC Incomprehensible Enforcement Inactions.Understands That NRC Claiming Hands Tied in Matter Re Discrimination Violation at Perry Npp.Requests That NRC Take Listed Two Actions PY-CEI-NRR-2403, Submits Response to RAI Re GL 96-05 Program at Plant1999-06-29029 June 1999 Submits Response to RAI Re GL 96-05 Program at Plant PY-CEI-NRR-2413, Advises That Jk Wood Will Replace Lw Myers as Pnpp,Vice President - Nuclear,Effective 9907061999-06-29029 June 1999 Advises That Jk Wood Will Replace Lw Myers as Pnpp,Vice President - Nuclear,Effective 990706 PY-CEI-NRR-2410, Submits Response to NRC Request for Info Re GL 98-01, Y2K Readiness of Computer Sys at Npps. Attachment 1 Provides Y2K Readiness Disclosure for Plant1999-06-29029 June 1999 Submits Response to NRC Request for Info Re GL 98-01, Y2K Readiness of Computer Sys at Npps. Attachment 1 Provides Y2K Readiness Disclosure for Plant ML20211A3991999-06-28028 June 1999 Submits Concerns Re Proposed Changes to Enforcement Policy. Believes That NRC Existing Regulations & Policies Provide Adequate Controls & That NRC Not Administering Consistent Enforcement Policies in Response to Discriminatory Actions PY-CEI-NRR-2412, Forwards Perry Nuclear Plant Simulator Four Yr Test Rept & NRC Form 474, Simulation Facility Certification, Which Describes Tests Conducted from June 1995-19991999-06-28028 June 1999 Forwards Perry Nuclear Plant Simulator Four Yr Test Rept & NRC Form 474, Simulation Facility Certification, Which Describes Tests Conducted from June 1995-1999 ML20209B5821999-06-24024 June 1999 Provides Justification for Rev to Completion Date for One of Insp follow-up Items Cited in Insp Rept 50-346/98-03, Designated as Inspector follow-up Item 50-346/97-201-10 ML20196G1251999-06-23023 June 1999 Responds to NRC RAI Re GL 98-01, Y2K Readiness of Computer Sys at Nuclear Power Plants ML20196E5321999-06-17017 June 1999 Forwards Addl Info Re Relief Request RR-A16 to Support NRC Approval of Relief Request ML20196A6601999-06-16016 June 1999 Forwards Master Decommissioning Trust Agreements Revised After 1990 for Ohio Edison Co,Cleveland Electric Illuminating Co,Toledo Edison Co & Pennsylvania Power Co Re Bvnps,Units 1 & 2,DBNPS,Unit 1 & Perry Unit 1 PY-CEI-NRR-2405, Informs NRC That Pnpp Staff Has Implemented Formal Industry Position on Severe Accident Mgt1999-06-14014 June 1999 Informs NRC That Pnpp Staff Has Implemented Formal Industry Position on Severe Accident Mgt 1999-09-09 Category:LEGAL/LAW FIRM TO NRC MONTHYEARML20059D6451990-08-31031 August 1990
[Table view]Requests Dismissal of Ohio Edison Co Application to Suspend Antitrust License Conditions in OL & Follow Recommendation of Doj.Alleged Increase in Nuclear Power Costs Heightens Importance of Continued Imposition of Antitrust Conditions ML20059C9951990-08-27027 August 1990 Responds to Util Re Suspension of Antitrust License Conditions ML20059G1001990-07-24024 July 1990 Requests NRC Expeditious Disposition of Matter Re Ohio Edison 870918 Application to Suspend Antitrust License Conditions.Doj Position in Inconsistent W/Prior Analyses & W/Pertinent NRC Case Law.Jd Pace Affidavit Encl ML17309A4441990-05-29029 May 1990 Forwards Endorsements 142-151 to Nelia Policy NF-170, Endorsements 125-134 to Maelu Policy MF-47,Endorsements 13-14 to Certificates N-14/M-14,Endorsements 74-81 to Nelia Policy NF-236 & Endorsements 61-68 to Maelu Policy MF-92 ML20245D3421989-03-20020 March 1989 Forwards Listed Endorsements,Including Endorsements 14,163, 144,94,75,39 & 31 to Nelia Policies NF-295,NF-100,MAELU Policy MF-29,NELIA Policy NF-182,MAELU Policy MF-61,NELIA Policy NF-281 & Maelu Policy MF-112,respectively ML20206H5581988-10-0404 October 1988 FOIA Request for Documents Re V Gilinsky Concerns About 831005 Plant Site Visit ML20151D8121988-07-15015 July 1988 Forwards Opposition of City of Clyde,Oh to Util Application to Suspend Antitrust Conditions at Facilities,Per 880616 53FR22589 & 53FR22590 ML20150D3541988-07-0505 July 1988 Forwards Response of Ohio Edison Co to Comments on Antitrust License Amend Application.Util Requests Commission Hold Present Proceeding on Application in Abeyance Pending Resolution of Court Action Filed on 880622 ML20197G9591988-06-0808 June 1988 Forwards Technical Rept, Analyses of Northeastern Ohio Seismicity & Tectonics, Which Responds to Ohio Citizens for Responsible Energy 880122 Petition for Immediate Action to Relieve Undue Risk Posed by Inadequate Seismic Design ML20155F2091988-05-27027 May 1988 Requests 30-day Extension Until 880703 to File Response to Cities of Clyde & Cleveland Re Util Antitrust License Amend Application,Due to Length of Comments.Nrc Antitrust Counsel Does Not Object to Granting Extension Based on Discussion ML20155F3831988-05-23023 May 1988 Forwards Tables of Contents & Appendices Inadvertently Omitted from City of Cleveland,Oh 880219 Answer to Util 870918 Application ML20148K1111988-03-22022 March 1988 Forwards Listed Endorsements to Listed Policies,Including Endorsement 102 to Maelu Policy MF-26,Endorsement 123 to Nelia Policy NF-76,Endorsement 71 to Maelu Policy MF-56 & Endorsement 89 to Nelia Policy NF-189 ML20147E8141988-02-29029 February 1988 Forwards American Municipal Power-Ohio,Inc Request for 30 Day Extension for Filing Comments ML20236A0041987-10-13013 October 1987 Forwards Usc Comment on Proposed Rule 10CFR50 Re Proposed Rev of Backfitting Process for Power Reactors ML20235A5361987-09-18018 September 1987 Forwards Application for Amend to License NPF-58,suspending Antitrust Conditions Insofar as Conditions Apply to Ohio Edison Co.Fee Paid ML20215F5731987-06-11011 June 1987 Forwards Endorsements 61 & 48 to Nelia & Maelu Policies NF-236 & MF-92,respectively ML20206D5351987-03-31031 March 1987 Forwards Endorsement 60 to Nelia Policy NF-236 & Endorsement 47 to Maelu Policy MF-92 ML20212N1301987-03-11011 March 1987 Forwards Final Draft Plant Operating Agreement Mentioned in Application for License Amend & Approval Re Sale & Leaseback Transactions.Agreement Currently Being Executed ML20207T2701987-03-0909 March 1987 Forwards Endorsement 59 to Nelia Policy NF-236 ML20212F4651987-03-0303 March 1987 Identifies Potential Equity Investors Wishing to Participate Directly or Through Subsidiary in Sale & Leaseback Transactions,Per Util 870123 Application for Amend to License NPF-58.Annual Repts & Supporting Documentation Encl ML20207Q5861987-01-23023 January 1987 Forwards Application for Amend to License NPF-58 Re Sale & Leaseback Transactions W/Ohio Edison Co.Fee Paid ML20210F5891987-01-19019 January 1987 Forwards Endorsement 58 to Nelia Policy NF-236,Endorsement 46 to Maelu Policy MF-92 & Endorsement 7 to Nelia & Maelu Certificates N-61 & M-61 ML20214R1811986-09-19019 September 1986 Forwards Preliminary Project Plan Conceptual Design Disposal of Very Low Level Radwaste at Davis-Besse Site, Per Request.Plan Cannot Be Finalized Until State of Oh EPA Issues Permit to Install.W/Svc List.Related Correspondence ML20206S2701986-09-17017 September 1986 Notifies of Address Change Effective on 860927.Requests Address on Encl List of Dockets Be Changed ML20214L4731986-09-0808 September 1986 Informs That Licensee Filing Motion for Transcript Corrections,Including Incorporating Resumes of Witness Into Record.W/O Encl Resumes.W/Svc List.Related Correspondence ML20214M7281986-09-0808 September 1986 Forwards Ibm Formatted Floppy Disk Re Licensee Proposed Findings of Fact & Conclusions of Law in Form of 860908 Initial Decision.W/O Encl.Svc List Encl.Related Correspondence ML20214L6681986-09-0404 September 1986 Requests Encl Signature Page Be Substituted for Original Signature Page to MR Edelman 860902 Affidavit Attached to Licensee 860902 Response to Ocre Motion for Continuance.Svc List Encl ML20209B0071986-09-0202 September 1986 Advises That Sunflower Alliance Will Not Suppl or Amplify Notice of Reconsideration Filed on 860808.W Clements Directed to Destroy Notice of Appeal ML20212P0071986-08-28028 August 1986 Requests Scheduled 860905 Meeting Re Discussions/Possible Vote on Full Power OL for Unit 1 Be Stayed Pending Decision from Us Court of Appeals for Sixth Circuit in Ocre Vs NRC ML20214J9641986-08-12012 August 1986 Advises That Licensee Will Await Aslab Decision Before Responding to Ohio Citizens for Responsible Energy 860808 Petition to Reconsider Portions of Aslab 860725 Decision ALAB-841.Svc List Encl.Related Correspondence ML20207F6041986-07-19019 July 1986 Forwards Licensee Testimony on Burial of Very Low Level Waste at Davis-Besse.W/Certificate of Svc.Related Correspondence ML20211D7101986-06-11011 June 1986 Requests That Current Schedule for Submission of Testimony & Evidentiary Hearings Be Suspended Until Intl Brotherhood of Electrical Workers Strike Resolution.Util Will Not Conduct Onsite Waste Burial Prior to Decision.W/Svc List ML20211B9111986-06-0404 June 1986 Forwards Endorsement 44 to Maelu Policy MF-92 ML20211C7501986-05-19019 May 1986 Forwards Endorsements 56 & 57 to Nelia Policy NF-236 & Endorsement 45 to Maelu Policy MF-92 ML20203P9011986-05-0505 May 1986 Informs of Author Employment from June 1982 to Oct 1983 as Law Clerk W/Aslb,Per 10CFR0.735-27.Employment Unrelated to Facility Waste Disposal.Author Participation in Proceeding Complies W/Listed Codes.W/Svc List.Related Correspondence ML20203Q2991986-05-0505 May 1986 Advises That Per Encl Sec 860429 Order,Cleveland Electric Illuminating Co & Toledo Edison Co Now Subsidiaries of Centerior Energy Corp.Utils Will Continue as Electric Companies & as NRC Licensees & CP Holders ML20203N1721986-04-30030 April 1986 Responds to Ohio Radioactive Matl Users Group (Ormug) Request for Participation in Low Level Waste Disposal Proceeding.Licensee Has No Objection to Ormug Making Limited Appearance Statement ML20210N4601986-04-29029 April 1986 Advises That Municipalities Ltrs to NRC Forwarding Resolutions Re Burial of Low Level Radwaste at Facility Should Be Treated as Limited Appearance Statements,Not Requests to Intervene ML20210N7201986-04-29029 April 1986 Notifies That Util Has No Objections to Treating Hl Waldorf as Limited Appearance Statement Only.Ltr Does Not Meet Requirements for Participation as Party to Proceeding ML20210N7751986-04-29029 April 1986 Informs of Receipt of League of Women Voters of Rocky River 860410 Statement.No Objection Raised to Treatment.Submittal as Limited Appearance Statement.Opposes Treatment as Petition to Intervene ML20203N1201986-04-29029 April 1986 Advises That Undated Resolution from Greater Cleveland Boating Assoc Re Burial of Low Level Radwaste at Facility Should Be Treated as Limited Appearance Statement,Not Leave to Intervene ML20210L3931986-04-25025 April 1986 Confirms That Baseline Testing Referred to in Affidavit of Dr Green Completed Prior to Fuel Loading of Unit 1.Svc List Encl.Related Correspondence ML20210K7421986-04-25025 April 1986 Requests That Councilman Kay 860210 Intervening Statement Be Treated as Limited Appearance Statement.Requirements to Become Intervening Party Not Met.Mayfield Heights,Oh,Too Far to Confer Standing.Related Correspondence ML20210L3651986-04-25025 April 1986 Requests That Congressman Feighan 860414 Petition to Participate in Proceeding Be Treated as Limited Appearance Statement & Not as Petition to Intervene Per 10CFR2.714(d). Related Correspondence ML20210L3791986-04-25025 April 1986 Requests That Councilwoman J Klein Intervening Statement Re Resolution 86-10 Be Treated as Limited Appearance Statement. J Klein Has Not Met Requirements to Become Intervening Party.Resolution Deficient in Citations & Supporting Data ML20141J3521986-04-23023 April 1986 Advises That Encl TC Brown W/Resolution Passed by City of Lakewood,Oh on 860106 Should Be Treated as Limited Appearance Statement & Not as Official Notice of TC Brown Intent to Become Party to Hearing.W/O Encl ML20141J2931986-04-23023 April 1986 Requests That Lj Lucas Re Burial of Very Low Level Radwaste Be Treated as Limited Appearance Statement ML20141J2961986-04-23023 April 1986 Requests That League of Ohio Sportsmen Forwarding Resolution Addressing Burial of Very Low Level Radwaste Be Treated as Limited Appearance Statement ML20203D7401986-04-18018 April 1986 Raises No Objection to Treating RM Bimber Presenting Views on Burial of Very Low Level Radwaste,As Limited Appearance Statement.Bimber Fails Requirements to Be Party to Proceeding ML20203D7231986-04-16016 April 1986 Informs That Both Seismic Instrumentation & Hydrogen Control Equipment Will Be Accessible at Time of Aslab Visit,Per 860403 Telcon Re Hearing on Ocre Motion to Reopen Proceeding.Personal Info Requested by 860509.Svc List Encl 1990-08-31 |
Text
. _ .
e Law ormcae GOLD B ERG, FIELDMAN & LETH AM, P. C.
170 0 PEN N SY LVANI A AV EN U E. N. W.
Eusc= ooLosEno waswiNoro N, e. c. aooos
&RNC LD FIELC M AN 02) 393-2 m GLENN W LETH AM OFCOwNSEb e4 W L M '* *
- e W 3 *0 N DaviO C. MJ ELM FELT c-i ~ - ~ o o .T =o T- E =. s a* September 12, 1979 roa7 coLu== co'ca^oo
. . . .. a .u, Mr. Harold Denton, Director Office of Nuclear Reactor Regulation Nuclear Regulatory Commission 1717 H Street, N.W.
Washington, D.C. 20555
Dear Mr. Denton:
By letter dated August 10, 1979, received by this office on August 31, 1979, the Department of Justice re-quested the Nuclear Regulatory Commission to institute pro-ceedings to impose a civil penalty on The Cleveland Electric Illuminating Company ("CEI") for violating Antitrust License Condition No. 3, relating to wheeling services, attached to the operating license for Davis-Besse Nuclear Power Station Unit 1 and the construction permits issued for Perry Plant Units 1 and 2 (NRC Dockets No. 50-346A, 50-500A, 50-501A and NRC Dockets No. 50-440A and 50-441A).
The City of Cleveland, Ohio, supports the request of the Department of Justice.
The City of Cleveland agrees with the Department that CEI has willfully refused to comply with Antitrust License Condition No. 3. As was observed in the Order of June 25, 1979, of the Nuclear Regulatory Commission relating to CEI's violations of the wheeling license condition--
"CEI has approached its responsibility to file a wheeling schedule for the City as if it had not been required as a condition of its operating license and two construction permits to comply with Antitrust License Condition No. 3."
CEI's conduct in this regard was not inadvertent.
It was knowing and deliberate, designed to thwart the license condition while hoping that its appeal of the Licensing Board's decision would rescue CEI from compliance. with the license condition which the Licensing and Appeal Board had refused to f stay pendents lite. A witness for the Staff of the Federal (g, g
Energy Regulatory Commission, in that commission's hearing v(
,A \
- 1151 i39 I909180 32s o
,t T A
W OFmCES GOLDBERG, FIELDMAN & LETH AM, P. C.
Mr. Harold Denton September 12, 1979 Page Two on the transmission tariff filed by CEI in purported com-pliance with the license condition, put it succinctly (FERC Docket No. ER78-194, Transcript 431):
"My reading of the tariff is that it is a short-term stop-gap filing by CEI that makes no provieron for the future except to abruptly ter-minate service if any legal means of doing so should materi.alize."
Respectfull/ submitted, Y t'htt/
A f Reuben Goldberg, y Attorns'] for The City of Cleveland, Ohio RG/jat cc: Service list excluding members of the NRC Safety and Licensing Appeal Board.
1151 140
. - . - - - - . . . . - - . . . . . - - - - . . . - - - - .-