ML19253B033
| ML19253B033 | |
| Person / Time | |
|---|---|
| Site: | Farley |
| Issue date: | 09/10/1979 |
| From: | Clayton F ALABAMA POWER CO. |
| To: | NRC OFFICE OF MANAGEMENT AND PROGRAM ANALYSIS (MPA) |
| Shared Package | |
| ML19253B034 | List: |
| References | |
| NUDOCS 7909140400 | |
| Download: ML19253B033 (1) | |
Text
' Alabama Power Company 600 North 18th btreet Post Office Box 2641 brmingham. Alabama 3531 Telephone 205 323-5341 m
F. L CLAYTON, JR.
AlabamaPower Senior Vice President Ihe southem enttrc sg.*em September 10, 1979 Director, Office of Managemet;t Information & Program Contrcl U. S. Nuclear Regulatory Comsission Washington, D. C.
20555 Re: Joseph M. Farley Nuclear Plant Unit No. 1 Docket No. 50-348 Monthly Operating Data Report
Dear Sir:
Attached are two (2) copies of the August, 1979 monthly operating report for Joseph M. Farley Nue; ear Plant, Unit 1. as required by Section 6.9.1.6 of the Appendix A Technical Specirications. As requested by letter from Mr. John F. Stolz to Mr. Alan R. Barton, dated October 21, 1977, a " Narrative Summary of Operating Experience" is included in the attached report.
If you have any questions, please advise, fours very truly, F. L. Clayton, Jr.
FLCjr/TNE/cmb Attachments cc: Director, IE (10 copies)
Director, RII ( l copy )
Mr. Ted Cintula( l copy )
0>
1
\\ \\
343317 7 9001409'0c*