Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19256A884 + (08:22:21, 4 January 2025)
- ML19256A882 + (08:22:25, 4 January 2025)
- 05000318/LER-1978-047-03, /03L-0 on 781213:refueling Water Tank Narrow Range Level Indicator (Lia 4142) Was Out of Calibr & Tank Level Was Too Low.Caused by Malfunctioning Power Supply Model TA4552 + (08:23:09, 4 January 2025)
- 05000266/LER-1978-018-01, /01T-0 on 781219:during Normal Power Operation, Power Range Channel 44 Failed,Causing 20% Turbine Runback. Failure of Power Designs,Inc,Model UPMP-X54W Power Supply Caused Instrument to Fail + (08:23:50, 4 January 2025)
- 05000266/LER-1978-018, Forwards LER 78-018/01T-0 + (08:24:19, 4 January 2025)
- 05000318/LER-1978-047, Forwards LER 78-047/03L-0 + (08:24:52, 4 January 2025)
- ML19256A874 + (08:24:54, 4 January 2025)
- ML19256A871 + (08:24:56, 4 January 2025)
- ML19256A870 + (08:24:58, 4 January 2025)
- ML19256A868 + (08:24:59, 4 January 2025)
- 05000302/LER-1978-070-03, /03L-0 on 781215:low Flow Condition Noted on Auxiliary Bldg Exhaust.Investigation Showed That AHF-14D Had Ejected All Blades.Caused by Possible Damage That Occurred During Event 78-064/03L-0 + (08:25:28, 4 January 2025)
- 05000302/LER-1978-070, Forwards LER 78-070/03L-0 + (08:26:04, 4 January 2025)
- 05000346/LER-1978-124-03, /03L-0 on 781216:during Surveillance testing,13 of 18 Main Steam Safety Valves Failed to Be within +/-17 of Design Setpoint,Apparently Caused by Change in Ambient Conditions + (08:26:38, 4 January 2025)
- 05000346/LER-1978-124, Forwards LER 78-124/03L-0 + (08:27:18, 4 January 2025)
- ML19256A861 + (08:27:21, 4 January 2025)
- ML19256A860 + (08:27:24, 4 January 2025)
- ML19256A858 + (08:27:26, 4 January 2025)
- ML19256A857 + (08:27:27, 4 January 2025)
- ML19256A856 + (08:27:28, 4 January 2025)
- ML19256A854 + (08:27:29, 4 January 2025)
- ML19256A852 + (08:27:30, 4 January 2025)
- ML19256A851 + (08:27:32, 4 January 2025)
- ML19256A850 + (08:27:34, 4 January 2025)
- 05000302/LER-1978-069-03, /03L-0 on 781213:while Performing Surveillance procedure,RB3-GP-2,light Did Not Illuminate When Circuit Was Tested.Relay L in Engineered Safeguards Cabinet C-4 Was de-energized,but Stuck Plunger Was in Energized Position + (08:28:06, 4 January 2025)
- ML19256A848 + (08:28:09, 4 January 2025)
- 05000302/LER-1978-069, Forwards LER 78-069/03L-0 + (08:28:38, 4 January 2025)
- ML19256A844 + (08:28:41, 4 January 2025)
- ML19256A845 + (08:28:41, 4 January 2025)
- ML19256A843 + (08:28:43, 4 January 2025)
- ML19256A841 + (08:28:44, 4 January 2025)
- ML19256A840 + (08:28:45, 4 January 2025)
- ML19256A839 + (08:28:46, 4 January 2025)
- ML19256A838 + (08:28:47, 4 January 2025)
- ML19256A837 + (08:28:48, 4 January 2025)
- ML19256A836 + (08:28:55, 4 January 2025)
- 05000266/LER-1978-019-01, /01T-0 on 7901228:both Heat Tracing Circuits of Circuit 47 of the Boric Acid Sys Were Inoperable Due to Defective Potentiometers in the Thermon Model SCR Controller for Each Circuit + (08:28:58, 4 January 2025)
- 05000295/LER-1978-132-03, /03L-0 on 781205:during Inadvertent Safety Injection,The 1B Diesel Generator Failed to Start.Caused by Control Air Fitting Leak + (08:29:01, 4 January 2025)
- ML19256A832 + (08:29:03, 4 January 2025)
- 05000266/LER-1978-019, Forwards LER 78-019/01T-0 + (08:29:33, 4 January 2025)
- 05000348/LER-1978-091-03, /03L-0 on 781212:train a River Water Pumps Noted to Be in Tripped State,Could Not Be Started from Control Room.Cause Not Yet Determined + (08:30:14, 4 January 2025)
- ML19256A828 + (08:30:16, 4 January 2025)
- 05000295/LER-1978-132, Forwards LER 78-132/03L-0 + (08:30:20, 4 January 2025)
- 05000348/LER-1978-091, Forwards LER 78-091/03L-0 + (08:30:50, 4 January 2025)
- 05000219/LER-1978-034-03, /03L-0 781213:both Diesel Generator & Station Batteries Were Not Tested & Monitored within Specified Time Interval.Caused by Failure to Adhere to Surveillance Schedule + (08:31:17, 4 January 2025)
- 05000219/LER-1978-034, Forwards LER 78-034/03L-0 + (08:31:38, 4 January 2025)
- ML19256A819 + (08:31:40, 4 January 2025)
- 05000334/LER-1978-067-01, /01T-0 on 781220:during Containment Type a Leak Test,Excessive Leakage Was Found at Containment Air Ejector Penetration Isolation Valves,Caused by Warped Rubber Valve Seats + (08:31:43, 4 January 2025)
- ML19256A817 + (08:31:52, 4 January 2025)
- 05000219/LER-1978-036-03, /03L-0 on 781212:during Routine Tests,Standby Gas Treatment Sys II Discharge Valve V-28-30 Failed to Close. Caused by Buildup of Dirt & Corrosion in Piston Cylinder of Valve Operator + (08:32:25, 4 January 2025)
- 05000334/LER-1978-067, Forwards LER 78-067/01T-0 + (08:33:10, 4 January 2025)
- ML19256A812 + (08:33:15, 4 January 2025)