ML19256A843

From kanterella
Jump to navigation Jump to search
Responds to NRC 790110 Request for Addl Info Re Seismic Qualification of diesel-engine-driven Emergency Generator Sets.Encl 780209 Morris-Knudsen Ltr Lists 4 Events Monitored During Seismic Testing
ML19256A843
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 01/12/1979
From: Gilleland J
TENNESSEE VALLEY AUTHORITY
To: Varga S
Office of Nuclear Reactor Regulation
References
NUDOCS 7901160226
Download: ML19256A843 (1)


Text

~

TENNESSEE VALLEY AUTHORITY CHATTANOOGA. TENNESSEE 374o1 500C Chestnut Street Tower II JAN 121979 Director of Nuclear Reactor Regulation Attention:

Mr. S. A. Varga, Chief Light Water Reactors Branch No. 4 Division of Project Management U.S. Nuclear Regulatory Commission Washington, DC 20555

Dear Mr. Varga:

In the Matter of the Application of

)

Docket Nos. 50-327 Tennessea Valley Authority

)

50-328 In response to a verbal request by Don Lasher of the NRC staff during the telephone conversation of January 10, 1979, enclosed is additional information related to the seismic qualifica*.1:.n of the diesel engine driven emergency generator sets at the Sequayah Nuclear Plant.

Very truly yours, Nt ( CM

'J.

E. Gilleland Assistant Manager of Power Enclosure 7901160g %

k\\

An Equal Opportunity Employer

'CREkTO IS OF'ELECTRICAt.

POV/Ei SUP.Y SYSTEMS h

=m p

h POW.:y,YSTEMS DIVISION ~

POvytit Sv5rgvs Q:vtSION OF MO% SON-KNUDS5.N COVPANY.INC, 108 CELO POAO / P O f>041924 /ftOCKY MOUNT. NOdTH CA7tOUNA 27801/ U.S A.

TWX. Otos ??)C725 PHONE pt97977-2720 February 9, 1978 Tennessee Valley Authority U10C126, 400 Commerce Avenue Knoxville, Tennessee 37902 ATTENTION:

Mr.

D.

R. Patterson, Chief Mechanical Engineering Branch

SUBJECT:

Sequoyah Nuclear Plant Diesel Engine Driven Emergency Generator Sets Your Contract No. 71C61-92652, N2M-52 P.S.D.

I.W.O. No. 950

REFERENCE:

Your Letter Dated December 9th, 1977 (Serial No. 950C-I-0032)

Centlemen:

Tbis is to confirm that Power Systems Division has been in contact with your Mr. Hodges and Mr. Coleman in regard to the above refer--

~Page 4 of 22 of Exide's Technical R e,.p_o r t N o. OCC-12_

enced letter.

indicates that four events were monitornd_during _the seismic _t;51slin_g; He have marked up and enclosecT Basler's Drawing No. 9'OT8T3 0 0-910, Sheets 1 and 2, to indicate the four relay contacts monitored and reasons for monitoring:

A.

"Kl" main contact, field shutdown circuit.

Closing of this contact will result in field collapsing and voltage shutdown.

B.

Remote indicati'on for "Kl" contacts, TD1 (25 and 26). b Monitors the state of K1 contactor.

jup/W 3 (57 and 58). h 6 C.

Remote indication of "K4" contacts, TD1 r

Under standby or running conditions of the unit, relay K4 is de-energized, its energizing will cause' g Mty Y K1 to pick up and cause voltage shutdown.

D.

Jumper TB1-1 and TB1-44. Monitored to simulate the closure of speed switch contacts for field flashing.

.