Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20212D252 + (11:39:29, 4 December 2024)
- ML20212D246 + (11:39:30, 4 December 2024)
- ML20212D244 + (11:39:31, 4 December 2024)
- TXX-6166, Interim Deficiency Rept CP-86-38 Re Failure of Project Procedures to Adequately Address Installation & Insp Criteria for Cable Runs Used as Device Pigtail Extensions. Initially Reported on 860527.Next Rept by 870204 + (11:39:31, 4 December 2024)
- 05000354/LER-1986-036, :on 860707,control Room Supply & Exhaust Ducts to Control Room Ventilation Unit a Isolated.Caused by Spurious Upscale Spike on Radiation Monitor.Design Mod Implemented to Change Power Supplies + (11:39:33, 4 December 2024)
- ML20212D240 + (11:39:33, 4 December 2024)
- TXX-6167, Interim Deficiency Rept CP-86-65 Re Unconsolidated Concrete in Exterior Wall of Unit 2 Containment Bldg.Initially Reported on 860915.Next Rept Will Be Submitted by 870123 + (11:39:34, 4 December 2024)
- ML20212D238 + (11:39:35, 4 December 2024)
- ML20212D237 + (11:39:35, 4 December 2024)
- ML20212D236 + (11:39:37, 4 December 2024)
- ST-HL-AE-1941, Forwards List of Matls Provided to Regions II & IV for Development of Operating Exams for Plant Reactor & Senior Reactor Operators,Per J Whittemore Request + (11:39:37, 4 December 2024)
- ML20212D229 + (11:39:38, 4 December 2024)
- TXX-6168, Interim Deficiency Rept CP-86-54 Re Design & Installation of Control Room Ceiling.Initially Reported on 861003.QC Verification of Const Activities Scheduled for Completion by 870130.Next Rept Will Be Submitted by 870220 + (11:39:39, 4 December 2024)
- ML20212D228 + (11:39:39, 4 December 2024)
- ML20212D223 + (11:39:40, 4 December 2024)
- ML20212D224 + (11:39:40, 4 December 2024)
- ML20212D222 + (11:39:41, 4 December 2024)
- B12444, Forwards Schedule for Addressing Fireproof Coating Concerns Identified in Util .Program Initiated to Enhance Protection of Structural Steel in 12 Fire Area Boundaries. Mods Should Be Completed by End of Next Refueling Outage + (11:39:42, 4 December 2024)
- ML20212D218 + (11:39:42, 4 December 2024)
- ML20212D217 + (11:39:43, 4 December 2024)
- ML20212D214 + (11:39:43, 4 December 2024)
- IR 05000267/1986031 + (11:39:44, 4 December 2024)
- TXX-6165, Interim Deficiency Rept CP-85-39 Re Conduit Not Installed in Accordance W/Design Documents.Initially Reported on 860918. Field Verification Effort Complete & Engineering Evaluation in Progress.Next Rept Will Be Submitted by 870212 + (11:39:45, 4 December 2024)
- ML20212D209 + (11:39:46, 4 December 2024)
- PNO-II-97-058, on 971030,Troxler,Model 3430,moisture Density Gauge Stolen from Licensee pick-up Truck.Local Police Authorities Notified.State Will Require Licensee to Issue Press Release.Nrc Notified of Event by State of Nc + (11:39:46, 4 December 2024)
- B16726, Forwards Response to 970113 RAI Re Design of Millstone,Unit 3,station Blackout Sys.Response Supersedes Util . Commitments Made by Util,Encl + (11:39:47, 4 December 2024)
- ML20212D202 + (11:39:48, 4 December 2024)
- ML20212D201 + (11:39:48, 4 December 2024)
- ML20212D200 + (11:39:49, 4 December 2024)
- ML20212D199 + (11:39:50, 4 December 2024)
- ML20212D198 + (11:39:51, 4 December 2024)
- CY-97-107, Provides Comments on Listed Statement Re Preliminary Accident Sequence Precursor Analysis Provided in 970711 NRC Ltr + (11:39:55, 4 December 2024)
- ML20212D196 + (11:39:55, 4 December 2024)
- ML20212D188 + (11:39:57, 4 December 2024)
- ML20212D191 + (11:39:57, 4 December 2024)
- ML20212D187 + (11:39:58, 4 December 2024)
- ML20212D185 + (11:39:59, 4 December 2024)
- ML20212D184 + (11:39:59, 4 December 2024)
- PNO-IV-97-062, on 971029,representative of CA Radiologic Health Branch Provided Updated Info Re Reported Overexposure at Isotope Products Labs Facility.State Review of Exposure Ongoing.State of CA Provided NRC Info Regarding Event + (11:40:00, 4 December 2024)
- ML20212D182 + (11:40:01, 4 December 2024)
- ML20212D180 + (11:40:02, 4 December 2024)
- BECO-87-036, Requests Continued Review & Approval of 870119 Application to Change Tech Spec 4.7.B.2.a Re Reduction of Differential Pressure from 8 to 6 Inches in Control Room High Efficiency Air Filtration Sys,Per NRC .Related Info Encl + (11:40:17, 4 December 2024)
- ML20212D177 + (11:40:17, 4 December 2024)
- ML20212D175 + (11:40:18, 4 December 2024)
- ML20212D176 + (11:40:18, 4 December 2024)
- ML20212D172 + (11:40:19, 4 December 2024)
- ML20212D169 + (11:40:20, 4 December 2024)
- ML20212D167 + (11:40:21, 4 December 2024)
- ML20212D166 + (11:40:22, 4 December 2024)
- ML20212D165 + (11:40:22, 4 December 2024)
- ML20212D163 + (11:40:23, 4 December 2024)
- ML20212D162 + (11:40:24, 4 December 2024)