Summary of 860723 Meeting W/Utils & Bechtel Wester Power Corp Re Use of 25% of Design Live Load in Combination W/ Earthquake Loads for Design of Category I Structures
ML20212D237
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 08/05/1986
From: Jacqueline Thompson
Office of Nuclear Reactor Regulation
To:
Office of Nuclear Reactor Regulation
References
NUDOCS 8608120450
Download: ML20212D237 (5)


Text

n j 1

'$ b l

Docket Nos.: 50-424 and 50-425 g l

APPLICANT: Georgia Power Company FACILITY: Vogtle, Units 1 and 2 i

SUBJECT:

SUMMARY

OF MEETING ON V0GTLE DESIGN LIVE LOAD HELD JULY 23, 1986 The staff met with the applicant and its representatives on July 23, 1986, to discuss use of 25% of the design live load in combination with earthquake loads for design of Category I structures at Vogtle. Participants are listed in Enclosure 1.

The staff and applicant discussed resolution to staff's questions which were transmitted to the applicant in a letter dated July 10, 1986. Topics of discussion included a listing of all structures for which 25% of live load was used, definitions of maximum design live load and anticipated live load, with justification for adoption of such criteria.

The applicant indicated that the following actions would be taken and submitted for staff review: (1) clarification of the FSAR definition of " design live load," particularly including definitions of " pre-fuel load live load" and the

" post-fuel load live load," (2) clarification of the FSAR table to correlate the "L" value in the table with the written definition, and (3) responding to the staff's July 10, 1986, request for additional infonnation on this subject.

The staff and the applicant also had a brief discussion on July 29, 1986, to review several calculations regarding floor panel frequency sensitivity to variations in live load magnitude. This information is summarized for the six structures of concern in Enclosure 2.

\\6 John Thompson, Vogtle Readiness Review Project Manager PWR Project Directorate #4 Division of PWR Licensing-A

Enclosures:

As stated cc: See next page O

PWR#4 PW - .M/dbR-A PWR[4fDPR JTho, :mac 11er BJYoungblood 08/ /86 08/C /86 08/f/86 8608120450 860805 PDR ADOCK 05000424 i

A PDR

g '%

/ Mr. R. E. Conway Georgia Power Company Vogtle Electric Generating Plant cc:

Mr. L. T. Gucwa Resident Inspector Chief Nuclear Engineer Nuclear Regulatory Comission Georgia Power Company P. O. Box 572 P.O. Bcx 4545 Waynesboro, Georgia 30830 Atlanta, Georgia 30302 Mr. Ruble A. Thomas Deppish Kirkland, III, Counsel Vice President - Licensing Office of the Consumers' Utility Vogtle Project Council Georgia Power Company / Suite 225 Southern Company Services, Inc. 32 Peachtree Street, N.W.

P.O. Box 2625 Atlanta, Georgia 30303 Birmingham, Alabama 35202 James E. Joiner Mr. Donald 0. Foster Troutman, Sanders, Lockerman, Vice President & Project General Manager & Ashmore Georgia Power Company Candler Building Post Office Box 299A, Route 2 127 Peachtree Street, N.E.

Waynesboro, Georgia 30830 Atlanta, Georgia 30303 Douglas C. Teper Mr. J. A. Bailey Georgians Against Nuclear Energy Project Licensing Manager 1253 Lenox Circle Southern Company Services, Inc. Atlanta, Georgia 30306 P.O. Box 2625 Birmingham, Alabama 35202 Ernest L. Blake, Jr.

Bruce W. Churchill, Esq.

Shaw, Pittman, Potts and Trowbridge Tim Johnson 1800 M Street, N.W. Executive Director Washington, D. C. 20036 Educational Campaign for a Prosperous Georgia Mr. G. Bockhold, Jr. 1083 Austin Avenue, N.E.

Vogtle Plant Manager Atlanta, Georgia 30307 Georgia Power Company

[

Route 2, Box 299-A Billie Pirner Garde Waynesboro, Georgia 30830 Citizens Clinic Director Government Accountability Project Regional Administrator, Region II 303 10th Street U.S. Nuclear Regulatory Commission ' Augusta, Georgia 30901 101 Marietta Street, N.W., Suite 2900 Atlanta, Georgia 30323 ,

i

g, .

) Enclosure 1 Participants NRC Bechtel Wester Power Corp.

M. Miller S. Cereghino J. Thompson L. Hersh D. Jeng D. Houghton S. Chan R. Ballard C. Chen H. Wang Georgia Power Company W. Burns Southern Company Services

0. Batum J. Bailey W. Ramsey R. Thomas

. *-o . e . e a p._

.e e .e -

e-e .

Me 6ei

n. e e. 4 m f

b l-- O C 4 G; C 9 e{h*y YE H

~- - -

K ~ }--f yE.

- ~

7f-e.-O

. oc (J o O. h tA $ W*8 yn .a Z 1

- ~

.... ... .___. e. o ti

$$ co i, j" 33

. "a_.4.

-' .-... w4 _ .

D

_. 6 . .Y .A f.?_ . . - . .

. . . .. 2 ::E 2 g . . . . .

-w a . _ .

o .4 ,,

o .

m. a d ... f 2  % .I e.c$ I I .I,_q .g r e3 9 5 y

___ . g ... o ,

5

_, <.aaas- 4 ,, g .,

9 3 p. g .

-.--u) - -Z - W- -- --

~ ~ ~~ld 2 -

_ 1 EJZ Ow 5y al d ~- T:E_ ..~

o.-  ?{$

u_. g w 2

z a1 .< _. .

b r -- - -

I -

.$.S . E__ 2*

._ _ . . .W

_ _ j _ .,

O _ _ _ ..

w

.g . _ g .

3_.. ed

<g w.2_'d 3

g.3 6 ;g g.._ g 8 0 4.:J o)

._.._. q _' _ _ _

.g_. 8w .W_d 3_} W__ ~I ._ .. _.

m o._ yac 5 a. _g.S o . .- x.W a o Eso s, 3w o

.. g ..a _ _ _

g. 4k 3_g y'. .,

e # g_o f.g g

.g .>. _ .

o g.1 g3 g .3, ga g.y _g.0- g __

a g._ 3.g 3g

_u_ c . _ l,. 3 3

. .g . y _.. .

9 . eH = -

& . .w

  • G e e -e -. - e -

..e . -+ . --

_ mi-e

= w -__ g .

G.hhW M e.-*.e de. e .*.- h -_- @- . g,*. -.e,. e

-g. em -

e p.

O h e .-.-% . e -

e,,._ .,.i,. .

D' 6

._g

r 4 1 ,

MEETING

SUMMARY

DISTRIBUTION

_m.-en 0 5 AUG 1986 EgenhetM1 erin NRC Participants NRC PDR M. Miller L POR J. Thonipson NSIC S. Chan PRC System D. Jang PWR#4 Reading File R. Ballard Project Manager J. Thompson C. Chan M. Duncan H. Wang Attorney, OELD

J. Partlow P

E. Jordan B. Grimes ACRS (10) '

1 1

i OTHERS bec: Licensee & Service List i

i