ML20212D187

From kanterella
Jump to navigation Jump to search
Forwards Unit 1 Interval 1/Period 3/Outage 2 Inservice Insp Rept (Vols 1 & 2) Describing Activities Performed During 7th Refueling Outage,Completed on 861130,per 10CFR50.55a(g). Listed Rept Info Available Onsite for Review
ML20212D187
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 02/25/1987
From: Mcdonald R
ALABAMA POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20212D190 List:
References
NUDOCS 8703040079
Download: ML20212D187 (1)


Text

Alabima Power Comp ny 600 P! orth 1Cth Street Post Office Box 2641 Birmingham, Alabama 35291-0400 Telephone 205 250-1835 L

kn" Ole"# ieent Abmhe the Southem electrC System Docket No. 50-348 10CFR50.55a(g)

February 25, 1987 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D. C.

20555 Gentlemen:

Joseph M. Farley Nuclear Plant - Unit 1 Interval 1/ Period 3/0utage 2 Inservice Inspection Report Pursuant to the requirements of 10CFR50.55a(g) Alabama Power Company herewith submits the Joseph M. Farley Nuclear Plant Unit 1 Interval 1/ Period 3/ Outage 2 Inservice Inspection Report. This report describes and summarizes the inservice inspection activities performed during the Unit 1 seventh refueling outage. These activities were completed on November 30, 1986.

Other pertinent report information, including as applicable, examination plans and schedules, examination results and reports, examination methods and procedures, evaluation of results, and corrective actions and repairs, is available at Farley Nuclear Plant for your review.

Respectfully submitted, ALABAMA POWER COM ANY

)G R. P. Mcdonald RPM / CDP:csl-D397 Enclosure cc: Mr. L. B. Long Dr. J. N. Grace, w/1 enclosure Mr. E. A. Reeves Mr. W. H. Bradford 8703040079 870225 PDR ADOCK 05000348 G

PDR e

e-