Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- LIC-97-0166, Provides Response to 970926 RAI Re OPPD Exemption Request from Requirements of 10CFR70.24 for Criticality Monitoring at FCS + (11:38:56, 4 December 2024)
- 05000528/LER-1986-061, :on 861119,automatic Actuation of Plant Protection Sys Initiated in Steam Generator 1.Caused by Personnel Error Complicated by Malfunction of Steam Generator 1 Level Channel + (11:38:57, 4 December 2024)
- ML20212D319 + (11:38:58, 4 December 2024)
- ML20212D317 + (11:38:59, 4 December 2024)
- ML20212D318 + (11:38:59, 4 December 2024)
- ML20212D314 + (11:39:00, 4 December 2024)
- ML20212D313 + (11:39:01, 4 December 2024)
- ML20212D312 + (11:39:01, 4 December 2024)
- ML20212D310 + (11:39:02, 4 December 2024)
- ML20212D306 + (11:39:03, 4 December 2024)
- ML20212D307 + (11:39:03, 4 December 2024)
- ML20212D304 + (11:39:04, 4 December 2024)
- ML20212D303 + (11:39:04, 4 December 2024)
- 05000529/LER-1986-002, :on 860220,during Cold Shutdown,Train a Main Steam Isolation Signal Occurred,Actuating Esf.Caused by Incorrect Amperage fuse.Eight-amp Fuse Installed in Affected Path + (11:39:07, 4 December 2024)
- ML20212D291 + (11:39:08, 4 December 2024)
- ML20212D292 + (11:39:08, 4 December 2024)
- ML20212D289 + (11:39:09, 4 December 2024)
- ML20212D287 + (11:39:10, 4 December 2024)
- ML20212D288 + (11:39:10, 4 December 2024)
- ML20212D283 + (11:39:11, 4 December 2024)
- ML20212D278 + (11:39:12, 4 December 2024)
- ML20212D279 + (11:39:12, 4 December 2024)
- 3F0886-06, Forwards Monthly Operating Rept for Jul 1986.Corrected Line 18 Values for All Monthly Submittals Since Sept 1985 & Corrected Monthly Operating Repts for Jul 1983,Aug 1983,Oct 1983 & June 1986 Also Encl + (11:39:13, 4 December 2024)
- NSD-NRC-97-5390, Accomodates NRC Request for Formal Documentation of Resolution of Two Human Factors Engineering Issues Re Specifying Number of Reactor Operator Workstations in ITAAC & SSAR Statement Explaining NRC Review Scope + (11:39:14, 4 December 2024)
- ML20212D275 + (11:39:14, 4 December 2024)
- ML20212D272 + (11:39:19, 4 December 2024)
- ML20212D271 + (11:39:20, 4 December 2024)
- PNO-IV-97-063, on 971029,incident Resulting in Potential Exposure in Excess of Regulatory Limit Occurred.Gauge Mfg Notified of Incident.State of CA Provided NRC Info Regarding Event + (11:39:20, 4 December 2024)
- ML20212D268 + (11:39:21, 4 December 2024)
- ML20212D266 + (11:39:22, 4 December 2024)
- ML20212D265 + (11:39:22, 4 December 2024)
- ML20212D264 + (11:39:23, 4 December 2024)
- ML20212D262 + (11:39:24, 4 December 2024)
- ML20212D261 + (11:39:25, 4 December 2024)
- 3F0999-20, Forwards Summary Re Justification to Defer USI A-46 Commitment,Per Work Needed to Resolve GL 87-03, Verification of Seismic Adequacy of Mechanical & Electrical Equipment in Operating Reactors,Usi A-46 + (11:39:26, 4 December 2024)
- ML20212D257 + (11:39:26, 4 December 2024)
- ML20212D255 + (11:39:27, 4 December 2024)
- ML20212D253 + (11:39:28, 4 December 2024)
- ML20212D252 + (11:39:29, 4 December 2024)
- ML20212D246 + (11:39:30, 4 December 2024)
- ML20212D244 + (11:39:31, 4 December 2024)
- TXX-6166, Interim Deficiency Rept CP-86-38 Re Failure of Project Procedures to Adequately Address Installation & Insp Criteria for Cable Runs Used as Device Pigtail Extensions. Initially Reported on 860527.Next Rept by 870204 + (11:39:31, 4 December 2024)
- 05000354/LER-1986-036, :on 860707,control Room Supply & Exhaust Ducts to Control Room Ventilation Unit a Isolated.Caused by Spurious Upscale Spike on Radiation Monitor.Design Mod Implemented to Change Power Supplies + (11:39:33, 4 December 2024)
- ML20212D240 + (11:39:33, 4 December 2024)
- TXX-6167, Interim Deficiency Rept CP-86-65 Re Unconsolidated Concrete in Exterior Wall of Unit 2 Containment Bldg.Initially Reported on 860915.Next Rept Will Be Submitted by 870123 + (11:39:34, 4 December 2024)
- ML20212D238 + (11:39:35, 4 December 2024)
- ML20212D237 + (11:39:35, 4 December 2024)
- ML20212D236 + (11:39:37, 4 December 2024)
- ST-HL-AE-1941, Forwards List of Matls Provided to Regions II & IV for Development of Operating Exams for Plant Reactor & Senior Reactor Operators,Per J Whittemore Request + (11:39:37, 4 December 2024)
- ML20212D229 + (11:39:38, 4 December 2024)
- TXX-6168, Interim Deficiency Rept CP-86-54 Re Design & Installation of Control Room Ceiling.Initially Reported on 861003.QC Verification of Const Activities Scheduled for Completion by 870130.Next Rept Will Be Submitted by 870220 + (11:39:39, 4 December 2024)
- ML20212D228 + (11:39:39, 4 December 2024)