Provides Followup Rept of Tech Spec fire-rated Assemblies (Specifically Fire Doors) Found Inoperable During Nov 1986 Routine Surveillance.List of Inoperable Fire Doors Encl
ML20212D268
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 12/15/1986
From: Morgan H
SOUTHERN CALIFORNIA EDISON CO.
To: Martin J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
NUDOCS 8612310330
Download: ML20212D268 (3)


Text

- - - _ _ - _

y 4..

IVED

,f*C27 g

Southem Califomia Edison Company OEC l }

SAN ONOFitE NUCLEAR GENERATING ST ATION R G/

I[S

!h P. O. BOX 128 SAN CLEMENTE, CALIFORNIA 92672 TELEPHONE H E. MORGAN erare= =amaora

. December 15, 1986 m 2*m '

U. S. Nuclear Regulatory Commission Office of Inspection and Enforcement Region V I

1450 Maria Lane, Suite 210 Walnut Creek, California 94596-5368 j

=

Attention:

Mr. J. B. Martin, Regional Administrator m

[

Dear Sir:

=

Subject:

Docket Nos. 50-361 and 50-362 Follow-up Report, Inoperable Fire Doors - November 1986 San Onofre Nuclear Generating Station, Units 2 and 3

Reference:

Letter, H. E. Morgan (SCE) to J. B. Martin (NRC),

dated November 10, 198,6 In accordance with our referenced letter, this submittal provides the follow-up report of Technical Specification fire-rated assemblies (specifically fire doors) found inoperable during routine surveillances in November 1986.

Fire doors found inoperable during the November routine surveillances are identified in the Attachment and include: 14 latching mechanism failures, 2 closure mechanism failures, and 1 door blocked open typically for operation and maintenance activities. As each of these deficiencies was identified, compensatory fire watches, pursuant to Technical Specification 3.7.9, Action Statement 'a', were established.

Door mechanism failures are being corrected on an "as found" basis.

The responsible party was not identified for the 1 fire door found blocked open.

8612310330 861215 PDR ADOCK 05000361 A

S

PDR,

,f -c7/

- ____-_____________________________________________________ ______ __________ _________ _J

r>

4k 4'

Mr. J. B. Martin This monthly follow-up report and those sent previously provide updated information associated with an ongoing condition initially reported in 1983. The follow-up report covering inoperable fire doors identified in i

December 1986 will be submitted by January 15, 1987.

If you require any additional information, please so advise.

Sincerely, MbM Q'

~

Enclosure:

cc:

F. R. Huey (USNRC Senior Resident Inspector, Units 1, 2 and 3)

U. S. Nuclear Regulatory Commission Document Control Desk Institute of Nuclear Power Operations (INPO) 4 l

a3 ATTACHMENT SOUTHERN CALIFORNIA EDISON COMPANY IN0PERABLE FIRE DOORS FOR THE MONTH OF NOVEMBER 1986 SAN ONOFRE NUCLEAR GENERATING STATION UNITS 2 AND 3, DOCKET NOS. 50-361 and 50-362 I.

Latching Mechanism Failures:

Number of doors inoperable - 14, as follows:

Door Number' Inoperable Operable FH2-103 09/11/86 11/11/86 AC-349 10/14/86 11/05/86 AR-301 10/25/86 11/01/86 AC-239 10/29/86 11/03/86 AR-502 10/30/86 11/13/86 AR-306 10/31/86 11/03/86 DG3-206 11/02/86 11/08/86 AC-239 11/08/86 11/10/86 AR-509 11/16/86

{

FH2-103 11/16/86 AR-502 11/16/86 r

DG3-101 11/16/86 11/26/86 l

AC-239 11/18/86 11/21/86 AC-131 11/20/86 11/28/86 II. Closure Mechanism Failures:

Number of doors inoperable - 2, as follows:

Door Number Inoperable Operable AR-301 11/05/86 11/06/86 AR-239 11/16/86 11/18/86 III. Doors Blocked Open:

Number of doors blocked open - 1, as follows:

Door Number Date Found Blocked Open AR-106 11/04/86