Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 3F1097-37, Provides Info Re Insp of High Pressure Injection/Makeup Line Nozzles at Crystal River Unit 3 as Identified in Item 31 of Attachment B to + (11:32:04, 4 December 2024)
- IR 05000267/1986033 + (11:32:04, 4 December 2024)
- AECM-87-0040, Requests Authorization to Use ASME Code Case N-343, Alternate Scope of Exam of Attachment Welds for Exam Categories B-H,B-K-1 & C-C,Section Xi,Div 1. Fee Paid + (11:32:05, 4 December 2024)
- ML20212E047 + (11:32:05, 4 December 2024)
- ML20212E044 + (11:32:12, 4 December 2024)
- ML20212E043 + (11:32:13, 4 December 2024)
- 3F1097-11, Forwards Revised Request for Relief from Requirements of 10CFR50.55a(g)(4)(v),modifying Original Request to State That FPC Will Now Be Performing Containment Repair & Replacement Activities IAW ASME Section XI + (11:32:14, 4 December 2024)
- 05000458/LER-1986-066, :on 861124,discovered That Two Rated Fire Doors Omitted from Any Surveillance Test Procedure (STP) Door List.Caused by Procedural Deficiency.Temporary Change Notice Written to Include Two Doors in Daily STP + (11:32:15, 4 December 2024)
- ML20212E037 + (11:32:16, 4 December 2024)
- IR 05000020/1997201 + (11:32:17, 4 December 2024)
- ST-HL-AE-1852, Final Deficiency & Part 21 Rept Re Excessive Grease in Westinghouse Electrical Penetration Assemblies (Epas). Initially Reported on 861126.EPAs Disassembled,Cleaned & Reassembled.Westinghouse Also Evaluating Item Per Part 21 + (11:32:17, 4 December 2024)
- 05000414/LER-1986-050-01, :on 861118,containment Air Release & Addition Sys Release Terminated When Containment Activity Rose Above Setpoint.Caused by Too Conservative Tech Specs.Setpoint Increased + (11:32:19, 4 December 2024)
- ML20212E031 + (11:32:19, 4 December 2024)
- ML20212E030 + (11:32:21, 4 December 2024)
- 05000327/LER-1985-019-01, :on 850524,inadequate Seismic Piping Supports Discovered.Caused by Personnel Errors.Drawing Discrepancies Re Both Pipes Corrected & Sk Series of Prints Superseded by 47W Series of Prints + (11:32:22, 4 December 2024)
- 05000344/LER-1987-002, :on 870129,positive Pressure Could Not Be Maintained in Control Room W/Control Room Emergency Ventilation Sys.Caused by stuck-open Door to Control Room Viewing Gallery.Door Closed + (11:32:24, 4 December 2024)
- ML20212E026 + (11:32:24, 4 December 2024)
- ML20212E019 + (11:32:25, 4 December 2024)
- ML20212E023 + (11:32:25, 4 December 2024)
- ML20212E018 + (11:32:26, 4 December 2024)
- 3F1097-02, Supplemental Response to Responding to Violations Noted in Insp Rept 50-302/96-09,providing Results of Evaluation Completed on 970930 & Proposed Corrective Actions for Identified Discrepancies + (11:32:27, 4 December 2024)
- ML20212E017 + (11:32:27, 4 December 2024)
- ML20212E015 + (11:32:28, 4 December 2024)
- RBG-25131, Rev 1 to Special Rept:On 860605,valid Failure of Div II Diesel Generator Occurred While Performing Surveillance Testing.Caused by Incorrect Test Connection Due to Inadequate Procedure.Relays Reset & Tested Successfully + (11:32:29, 4 December 2024)
- ML20212E011 + (11:32:30, 4 December 2024)
- JPN-99-029, Comment Supporting Proposed Rules 10CFR50 & 72 Re Reporting Requirement for Nuclear Power Reactors + (11:32:31, 4 December 2024)
- 05000245/LER-1997-037-01, :on 970930,house Heating Boiler Ash Was Found to Be Slightly Contaminated.Caused by Unmonitored Release Path for Airborne Effluents IAW Requirements of TS 4.8.D.4. Restricted Boiler Use Until SE Was Performed + (11:32:33, 4 December 2024)
- ML20212E008 + (11:32:33, 4 December 2024)
- 05000220/LER-1986-033, :on 861121,reactor Bldg Closed Loop Cooling HX Failed Inservice Insp Hydrostatic Test Due to Crack in Weld. Caused by Improper Welding of silicon-bronze to Carbon Steel Weld.Hx Isolated & Under Repair + (11:32:35, 4 December 2024)
- ML20212E003 + (11:32:36, 4 December 2024)
- ML20212E002 + (11:32:37, 4 December 2024)
- RBG-25122, Special Rept:On 861120 & 24,valid Failures Occurred on Div I Diesel Generator While Performing Surveillance Testing. Caused by Oil in Tubing That Supplies Air to Air Start Valves.Oil Drained & Air Start Valves Reassembled & Tested + (11:32:37, 4 December 2024)
- ML20212D999 + (11:32:38, 4 December 2024)
- ML20212D996 + (11:32:39, 4 December 2024)
- ML20212D995 + (11:32:40, 4 December 2024)
- 05000245/LER-1997-037, Forwards LER 97-037-00,documenting Event Which Occurred on 970930 at Millstone Nuclear Power Station,Unit 1.Commitments Made within Ltr,Listed + (11:32:41, 4 December 2024)
- ML20212D993 + (11:32:41, 4 December 2024)
- ML20212D992 + (11:32:42, 4 December 2024)
- ML20212D990 + (11:32:43, 4 December 2024)
- ML20212D987 + (11:32:44, 4 December 2024)
- ML20212D988 + (11:32:44, 4 December 2024)
- 05000304/LER-1986-020-06, :on 861130,two Containment Isolation Valves Discovered Open During Audit of Chain Locked Valves,Per IE Info Notice 86-055.Caused by Inadequate Administrative Procedures.Procedures Revised + (11:32:46, 4 December 2024)
- ML20212D985 + (11:32:46, 4 December 2024)
- ML20212D983 + (11:32:47, 4 December 2024)
- ML20212D981 + (11:32:48, 4 December 2024)
- ML20212D979 + (11:32:49, 4 December 2024)
- ML20212D978 + (11:32:49, 4 December 2024)
- ML20212D977 + (11:32:50, 4 December 2024)
- ST-HL-AE-1875, Forwards marked-up Revs to FSAR Pages 9.2-33,9.2-34 & 9.2-57 Re Changes in Ref Dimineralized Water Fill Source.Revs Will Be Incorporated in FSAR Amend 54 + (11:32:50, 4 December 2024)
- ML20212D975 + (11:32:51, 4 December 2024)
- ML20212D974 + (11:32:51, 4 December 2024)
- ML20212D972 + (11:32:52, 4 December 2024)