Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20212E854 + (11:24:07, 4 December 2024)
- 05000458/LER-1997-007-02, :on 970926,discovered Cracked EDG Valve Adjusting Screw Assembly Swivel Pads (Vasasps).Caused by Mfg Defect.Replaced Vasasps in EDGs W/New Components & Returned Defective Vasasps to Vendor for Analysis + (11:24:09, 4 December 2024)
- 05000250/LER-1987-007, :on 870128,requirements of Tech Specs 3.7.1d for Fuel Oil Storage Tank for Emergency Diesel Generators Not Met.Caused by Fuel Storage Tank Exceeding Criteria for Water & Sediment + (11:24:11, 4 December 2024)
- LIC-99-0088, Forwards Documentation Associated with SRO License Renewal Application for Cd Darrow.Applicant Has Satisfactorily Completed Applicable FCS Requalification Program.Without Encls + (11:24:14, 4 December 2024)
- ML20212E847 + (11:24:15, 4 December 2024)
- ML20212E846 + (11:24:16, 4 December 2024)
- ML20212E843 + (11:24:17, 4 December 2024)
- ML20212E844 + (11:24:17, 4 December 2024)
- ML20212E840 + (11:24:18, 4 December 2024)
- PNO-II-86-005, on 860111,plant Swtichboard Operator Received off-site Call from Unidentified Male,Stating That There Was Bomb in Power Block Set to Go Off at Noon.Caller Stated He Had on Bomb.Search for Bomb Proved Negative + (11:24:19, 4 December 2024)
- ML20212E834 + (11:24:20, 4 December 2024)
- ML20212E836 + (11:24:20, 4 December 2024)
- ML20212E832 + (11:24:21, 4 December 2024)
- ST-HL-AE-1948, Forwards Annotated Revs to Responses to NRC Mechanical Engineering Branch Questions 210.55N & 210.60N,per SER Confirmatory Item 6,re Design Criteria for Component Supports.Revs Will Be Incorporated Into Future FSAR Amend + (11:24:21, 4 December 2024)
- 05000414/LER-1999-005-02, :on 990727,missed Emergency DG TS Surveillance Concerning Verification of Availability of Offsite Power Sources,Was Declared.Caused by Defective Procedure.Revised Affected Procedure + (11:24:23, 4 December 2024)
- IR 05000498/1987006 + (11:24:24, 4 December 2024)
- 05000213/LER-1986-035, :on 860715,NRC Notified of Plan to Shutdown & Plug 119 Tubes in 3 of 4 Steam Generators Based on Sample of 575 Tubes W/Undefined Eddy Current Signals.Caused by Mfg Defects.Monitoring & Repair Program Initiated + (11:24:26, 4 December 2024)
- ML20212E826 + (11:24:26, 4 December 2024)
- ML20212E825 + (11:24:27, 4 December 2024)
- 05000414/LER-1999-005, Forwards LER 99-005-00 Re Missed EDG TS Surveillance Concerning Verification of Availability of Offsite Power Sources Resulted from Defective Procedure.Planned Corrective Actions Stated in Rept Represent Regulatory Commitments + (11:24:28, 4 December 2024)
- ML20212E817 + (11:24:29, 4 December 2024)
- ML20212E815 + (11:24:30, 4 December 2024)
- ST-HL-AE-1939, Forwards marked-up FSAR Table 9.2-2.2 Re Fuel Handling Bldg Hvac.Airflow Data Revised to Reflect New Supply & Exhaust Air Flow Rates.Revs Will Be Incorporated Into FSAR Amend 59 + (11:24:30, 4 December 2024)
- ML20212E813 + (11:24:31, 4 December 2024)
- ML20212E811 + (11:24:32, 4 December 2024)
- PNO-II-86-052, on 860719,licensee Declared Unusual Event Due to Anonymous Telephoned Bomb Threat to Plant Security Shift Supervisor.No Evacuation Conducted & Unusual Event Terminated.Commonwealth of Virginia Informed + (11:24:32, 4 December 2024)
- ML20212E808 + (11:24:33, 4 December 2024)
- PNO-II-86-053, on 860721,GE Evacuated Commercial Fuel in Wilmington,Nc & Assembled Emergency Team When Plant Evacuation Alarm Sys Was Activated.Incident Occurred While Routine Maint Was Performed on Alarm.State of Nc Informed + (11:24:33, 4 December 2024)
- 05000341/LER-1986-019, :on 860707,reactor Bldg Ventilation & Exhaust Radiation Monitor Tripped,Causing Actuation of ESF Sys.Cause Undetermined.Time Delay Will Be Added + (11:24:35, 4 December 2024)
- ST-HL-AE-1876, Forwards marked-up FSAR Pages 11.2-35 & 11.2-36,reflecting Revs Resulting from Rev to Calculation Re Radionuclide Inventory of Liquid Waste Processing Sys Tanks.Revs Will Be Incorporated in FSAR Amend + (11:24:36, 4 December 2024)
- 05000336/LER-1999-011, :on 990823,thermal Reactor Power Limit Was Exceeded.Caused by Lack of Conservatism in Procedures & Alarm Setpoints Used to Limit Reactor Power.Revised Operating Procedures + (11:24:37, 4 December 2024)
- PNO-II-86-054, on 860722,unscheduled Shutdown Longer than 48 H Occurred Due to Inoperable Recirculation Containment Spray Heat Exchanger.Unit Placed in Cold Shutdown for Component Repairs.Commonwealth of VA Informed + (11:24:38, 4 December 2024)
- ML20212E794 + (11:24:41, 4 December 2024)
- 05000482/LER-1987-007, :on 870122,while NSSS Computer Maint Being Performed,Axial Flux Difference Annunciator Began Alarming Spuriously.Caused by Cognitive Personnel Error.Rept Added to Required Reading as Reminder to Personnel + (11:24:43, 4 December 2024)
- ML20212E789 + (11:24:43, 4 December 2024)
- ML20212E788 + (11:24:44, 4 December 2024)
- ML20212E784 + (11:24:45, 4 December 2024)
- ML20212E785 + (11:24:45, 4 December 2024)
- ML20212E783 + (11:24:46, 4 December 2024)
- ML20212E781 + (11:24:47, 4 December 2024)
- ST-HL-AE-1940, Forwards marked-up FSAR Pages Re Cumulative Usage Factor for Accumulator Safety Injection Lines & Pressurizer Surge Lines.Changes Support Preparation of SER & Will Be Incorporated Into FSAR Amend 59 + (11:24:47, 4 December 2024)
- BVY-99-114, Provides Notification That Licensee Completed Y2K Remediation Efforts Described in Util 990608 Response to NRC GL 98-01,Suppl 1 + (11:24:48, 4 December 2024)
- ML20212E778 + (11:24:48, 4 December 2024)
- ML20212E776 + (11:24:49, 4 December 2024)
- ML20212E773 + (11:24:49, 4 December 2024)
- ML20212E771 + (11:24:50, 4 December 2024)
- ML20212E768 + (11:24:51, 4 December 2024)
- ML20212E769 + (11:24:51, 4 December 2024)
- ML20212E767 + (11:24:52, 4 December 2024)
- B16829, Informs That Date for Beginning Second 10-yr Interval, Corresponding W/Implementation of Revised IST Program Plan, Will Be Specified within IST Program Plan Submitted Prior to Startup Due to Extended Shutdown.Revised Commitments,Encl + (11:24:53, 4 December 2024)
- PNO-V-86-094, on 861224,facility Tripped from 100% Power. Cause Believed to Be Electrical Malfunction on Vital Bus B. Definitive Cause of Malfuncion Under Investigation.Unit Will Be Maintained in Mode 3 Until Cause Identified + (11:24:53, 4 December 2024)
- IR 05000232/1951001 + (11:24:54, 4 December 2024)