Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20212E961 + (11:23:12, 4 December 2024)
- BSEP-99-0147, Forwards Response to NRC Telcon RAI Re Relief Requests RR-5, 12,13,14,22,23,24 & 25,per Inservice Insp Program for Third 10-yr Interval + (11:23:13, 4 December 2024)
- ML20212E954 + (11:23:14, 4 December 2024)
- L-96-034, TER on Third 10-Yr Interval ISI Program Plan:Nppd Cns + (11:23:16, 4 December 2024)
- ML20212E952 + (11:23:16, 4 December 2024)
- ML20212E951 + (11:23:17, 4 December 2024)
- 05000499/LER-1999-005-01, :on 990824,ESFA Following Loss of Power to Standby Transformer 2 Was Noted.Internal Fault Caused C Phase Arrester Failure.Replaced All Surge Arresters for Standby Transformer 2 + (11:23:19, 4 December 2024)
- ML20212E945 + (11:23:19, 4 December 2024)
- ML20212E944 + (11:23:20, 4 December 2024)
- ML20212E939 + (11:23:22, 4 December 2024)
- 05000354/LER-1999-008-01, :on 990817,CR Was Notified That Control Equipment Mezzanine (CEM) Floor Drain Discovered in Open Position.Caused by Failure to Include CEM Floor Drain Valve in Tagging Control Sys.Valve Was Closed.With + (11:23:24, 4 December 2024)
- 05000354/LER-1997-025, :on 971004,engineering Personnel Confirmed That Potential Unmonitored Release Path Existed Since Plant Startup.Caused by Human Error in Original Design & in Subsequent Design Reviews.Design Change Will Be Implemented + (11:23:26, 4 December 2024)
- U-600849, Provides Rept on Completion of IE Bulletin 85-003, Motor- Operated Valve Common Mode Failures During Plant Transients Due to Imppropoer Switch Settings, Per Bulletin Item F. Correct Switch Settings Determined & Adjusted + (11:23:26, 4 December 2024)
- PNO-IV-86-013, on 860415,Colorado Dept of Health,Radiation Control Div Notified Region Iv,State & Governmental Affairs Staff,That Troxler Moisture & Density Gauge Containing 9mCi of Cs-137 & 44mCi of AM-241 Was Stolen from Truck on 860414 + (11:23:27, 4 December 2024)
- 05000361/LER-1999-005-01, :on 990831,loss of Physical Separation in Control Room,Occurred.Caused by Personnel Error.Creacus Train a Was Returned to Standby on 990831 + (11:23:29, 4 December 2024)
- ML20212E924 + (11:23:31, 4 December 2024)
- 05000361/LER-1999-005, Forwards 30-day follow-up LER 99-005-00,describing Loss of Physical Train Separation in Control Room.Any Actions Listed Intended to Ensure Continued Compliance with Existing Commitments + (11:23:32, 4 December 2024)
- PNO-III-86-149, on 861217,seal on motor-driven Feedwater Pump Failed While Pump Was Being Started,Causing Leak of About 200 Gallons Per Minute.Water Was Drained to Radwaste Water Treatment Sys + (11:23:32, 4 December 2024)
- 05000281/LER-1986-009-03, :on 860709,reactor Trip Breaker Opened Following Spurious RCS Low Flow Signal.Caused by Personnel Error During Replacement of Failed Reactor Protection Sys Train B Relay.Individual Counseled + (11:23:34, 4 December 2024)
- ML20212E919 + (11:23:34, 4 December 2024)
- HL-5505, Submits 30-day Response to GL 97-04 Re Issues Which May Have Generic Implications to ECCS & Chrs.Info Requested Will Be Provided by 980105 + (11:23:35, 4 December 2024)
- 05000499/LER-1999-005, Forwards LER 99-005-00,re Esfa Following Loss of Power to Standby Transformer 2 Due to Electrical Fault.Licensee Commitments Are Listed in Corrective Actions Section of LER + (11:23:36, 4 December 2024)
- ML20212E912 + (11:23:36, 4 December 2024)
- ML20212E910 + (11:23:37, 4 December 2024)
- U-600831, Advises of Completion of Deferred Testing for Initial Criticality & Heatup Project Milestones.Test Results Reviews Complete & Satisfactory + (11:23:37, 4 December 2024)
- ML20212E909 + (11:23:38, 4 December 2024)
- 05000317/LER-1987-004, :on 870302,unit Manually Tripped Due to High Pressurizer Pressure from Turbine Runback.Caused by Improper Procedural Guidance to Reducing Main Generator Hydrogen Pressure.Procedures Revised + (11:23:39, 4 December 2024)
- ML20212E905 + (11:23:40, 4 December 2024)
- ML20212E904 + (11:23:41, 4 December 2024)
- ML20212E903 + (11:23:42, 4 December 2024)
- ML20212E902 + (11:23:42, 4 December 2024)
- ML20212E900 + (11:23:43, 4 December 2024)
- 3F0999-01, Forwards FPC Crystal River Unit 3 Plant Reference Simulator Four-Year Simulator Certification Rept Sept 1995-Sept 1999, Per 10CFR55.45(b)(5)(ii) & 10CFR55.45(b)(5)(iv) + (11:23:44, 4 December 2024)
- ML20212E898 + (11:23:44, 4 December 2024)
- ML20212E895 + (11:23:45, 4 December 2024)
- ML20212E892 + (11:23:46, 4 December 2024)
- PNO-III-86-144A, on 861212,Sixth Circuit Court of Appeals in Cincinnati Denied State of Ohio Request to Stay Commission 861121 Decision Authorizing Restart of Davis-Besse.Licensee Expects Startup of Reactor During Wk of 971214 + (11:23:46, 4 December 2024)
- ML20212E890 + (11:23:47, 4 December 2024)
- ML20212E889 + (11:23:47, 4 December 2024)
- ML20212E888 + (11:23:48, 4 December 2024)
- 05000382/LER-1999-013, :on 990825,exceeding TS Limits for RCS Cooldown Rate Was Discovered.Caused by Inadequate Content & Inadequate Implementation of TS Requirements.Page 2 of 2 in Attachment 2 of Incoming Submittal Not Included + (11:23:50, 4 December 2024)
- ML20212E886 + (11:23:50, 4 December 2024)
- ML20212E885 + (11:23:51, 4 December 2024)
- PNO-III-86-062, on 860627,while Operating at 68% Power, Lightening Strike Caused Unit to Automatically Trip.Shutdown Was Due to Failure of Some Primary Sys Instruments,Causing Reactor Protection Sys to Trip Unit.State of Il Notified + (11:23:51, 4 December 2024)
- ML20212E881 + (11:23:52, 4 December 2024)
- IR 05000456/1986066 + (11:23:54, 4 December 2024)
- ST-HL-AE-5777, Informs That Plant Currently in Process of Transitioning to STP Nuclear Operating Co (STPNOC) as Documented in NRC Order and Util to Nrc.Delay of Submittal of Operations QA Plan Revs Associated W/Stpnoc Appropriate + (11:23:55, 4 December 2024)
- 05000327/LER-1987-008, :on 870126,determined Surveillance Instruction Re ERCW Valves Servicing safety-related Equipment Did Not Ensure Compliance W/Tech Spec Surveillance Requirement. Caused by Personnel Error.Instruction Revised + (11:23:56, 4 December 2024)
- ML20212E875 + (11:23:57, 4 December 2024)
- ML20212E873 + (11:23:58, 4 December 2024)
- ML20212E874 + (11:23:58, 4 December 2024)