Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20212N354 + (09:56:02, 4 December 2024)
- IR 05000266/1987006 + (09:56:06, 4 December 2024)
- ML20212N345 + (09:56:08, 4 December 2024)
- ML20212N342 + (09:56:12, 4 December 2024)
- ML20212N340 + (09:56:14, 4 December 2024)
- ML20212N338 + (09:56:19, 4 December 2024)
- ML20212N335 + (09:56:20, 4 December 2024)
- ML20212N332 + (09:56:21, 4 December 2024)
- IR 05000029/1986010 + (09:56:23, 4 December 2024)
- ML20212N327 + (09:56:24, 4 December 2024)
- ML20212N326 + (09:56:26, 4 December 2024)
- ML20212N323 + (09:56:27, 4 December 2024)
- ML20212N322 + (09:56:29, 4 December 2024)
- ML20212N321 + (09:56:31, 4 December 2024)
- ML20212N317 + (09:56:33, 4 December 2024)
- ML20212N313 + (09:56:35, 4 December 2024)
- ML20212N312 + (09:56:37, 4 December 2024)
- ML20212N311 + (09:56:39, 4 December 2024)
- 05000272/LER-1982-007-01, /01X-2:on 820211,during Design Review,Discovered That Check Valves 1AF71 & 1AF72 & Associated Piping Not Seismically Analyzed & Protected.Protective Steel Structures Provided Off Seismic Wall + (09:56:42, 4 December 2024)
- PNO-I-86-067, on 860826,plant Supplied Nuclear Generated Electricity to Util Electrical Sys as Part of Ongoing Test Program.Turbine Generator Output Breakers Closed Onto Sys Grid for Approx 24 H + (09:56:44, 4 December 2024)
- ML20212N302 + (09:56:46, 4 December 2024)
- ML20212N300 + (09:56:48, 4 December 2024)
- ML20212N299 + (09:56:50, 4 December 2024)
- ML20212N295 + (09:56:52, 4 December 2024)
- ML20212N292 + (09:56:53, 4 December 2024)
- ML20212N290 + (09:56:57, 4 December 2024)
- ML20212N287 + (09:56:58, 4 December 2024)
- ST-HL-AE-1968, Forwards Rev 1 to Process Control Program OPGPO3-ZO-0017, Station Procedure Nonsafety-Related Radwaste Process Control Program + (09:56:59, 4 December 2024)
- ML20212N283 + (09:57:01, 4 December 2024)
- 05000312/LER-1987-016, :on 870206,discovered That Cable Pulls Made Into safety-related Breaker Cubicle Cabinets for Both Trains of Emergency Electrical Power Left for Several Wks Causing Invalid Seismic Analysis.Caused by Const Error + (09:57:04, 4 December 2024)
- ML20212N280 + (09:57:07, 4 December 2024)
- IR 05000373/1987005 + (09:57:09, 4 December 2024)
- DCL-86-248, Forwards Changes to Rev 14 to Physical Security Plan Re Reconfiguration of Vital Area Boundary,Addition of Exterior Plant Personnel Door & Updated Drawings.Changes Withheld (Ref 10CFR73.21) + (09:57:11, 4 December 2024)
- 05000362/LER-1986-010-01, :on 860726,loss of Feedwater Occurred When Both Feedwater Pump Turbines Tripped on High Vibration.Caused by Automatic Rejection of Condensate Contaminated by Condenser Seawater in-leakage.Event Reviewed + (09:57:18, 4 December 2024)
- ML20212N272 + (09:57:20, 4 December 2024)
- ML20212N269 + (09:57:22, 4 December 2024)
- ML20212N267 + (09:57:25, 4 December 2024)
- ML20212N263 + (09:58:19, 4 December 2024)
- JAFP-87-0218, Monthly Operating Rept for Feb 1987 + (09:58:22, 4 December 2024)
- ML20212N260 + (09:58:24, 4 December 2024)
- PNO-IV-87-007, on 870305,licensee Declared Unusual Event Due Tofire in Compressed Gas Storage Area.Caused by Hydrogen Storage Relief Valve Exploding & Catching Fire.Fire Extinguished.No Equipment Damage Noted + (09:58:26, 4 December 2024)
- ML20212N257 + (09:58:29, 4 December 2024)
- ML20212N254 + (09:58:31, 4 December 2024)
- ML20212N252 + (09:58:32, 4 December 2024)
- ML20212N250 + (09:58:34, 4 December 2024)
- ML20212N247 + (09:58:36, 4 December 2024)
- ML20212N246 + (09:58:37, 4 December 2024)
- ML20212N244 + (09:58:39, 4 December 2024)
- ML20212N242 + (09:58:40, 4 December 2024)
- ML20212N238 + (09:58:42, 4 December 2024)
- ML20212N237 + (09:58:46, 4 December 2024)