Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20213G906 + (07:56:44, 4 December 2024)
- ML20213G903 + (07:56:45, 4 December 2024)
- ML20213G904 + (07:56:45, 4 December 2024)
- IR 05000352/1986022 + (07:56:47, 4 December 2024)
- ML20213G899 + (07:56:48, 4 December 2024)
- ML20213G900 + (07:56:48, 4 December 2024)
- ML20213G898 + (07:56:49, 4 December 2024)
- ML20213G896 + (07:56:50, 4 December 2024)
- 05000220/LER-1986-032, :on 861016,reactor Bldg Emergency Ventilation Sys (Evs) Actuated.Caused by Inadvertent Unseating of Relay from Socket in Circuit.Reactor Bldg Evs Manually Reset.W/ + (07:56:51, 4 December 2024)
- GO2-86-101, Forwards 60-day Rept Per IE Bulletin 86-002 Re Static O-Ring (Sor) Differential Pressure Switches.Tests of Four Sor Switches Indicate That Instruments Exhibit well-defined Repeatable Shifts & No Further Special Testing Necessary + (07:56:52, 4 December 2024)
- IR 05000454/1987016 + (07:56:53, 4 December 2024)
- ML20213G890 + (07:56:55, 4 December 2024)
- ML20213G888 + (07:56:57, 4 December 2024)
- 05000247/LER-1986-034, :on 861016,F Function Signal to Overpower & Overtemp delta-T Trips Did Not Meet Test Acceptance Criteria.Caused by Three Defective Controllers.Two Controllers Repaired.Third Controller Replaced + (07:56:59, 4 December 2024)
- RBG-25903, Forwards Status of Util & Hydrogen Control Owners Group Efforts on Outstanding Concerns Re Hydrogen Control Rule. Completion of Efforts Should Be Sufficient to Demonstrate Compliance W/Hydrogen Control Rule or Identify Mods + (07:56:59, 4 December 2024)
- 05000346/LER-1986-041, :on 861013,mgt-initiated Review of Compliance W/Tech Specs Identified Deficiency in Tech Spec 4.7.9.2a Re Cycling of Testable Fire Protection Spray Flow Path Valves. Procedure Revised to Require Annual Testing + (07:57:01, 4 December 2024)
- ML20213G882 + (07:57:01, 4 December 2024)
- ML20213G881 + (07:57:02, 4 December 2024)
- ML20213G879 + (07:57:02, 4 December 2024)
- ML20213G877 + (07:57:05, 4 December 2024)
- ML20213G873 + (07:57:10, 4 December 2024)
- ML20213G872 + (07:57:10, 4 December 2024)
- ST-HL-AE-2151, Forwards Annotated Revs to FSAR Section 17.2, Qa. Revs Initiated in Response to NRC Questions.Revs Will Be Incorporated Into Future FSAR Amend + (07:57:11, 4 December 2024)
- ML20213G871 + (07:57:11, 4 December 2024)
- ML20213G868 + (07:57:12, 4 December 2024)
- IR 05000346/1987011 + (07:57:13, 4 December 2024)
- ML20213G866 + (07:57:15, 4 December 2024)
- ML20213G863 + (07:57:16, 4 December 2024)
- ML20213G865 + (07:57:16, 4 December 2024)
- ML20213G859 + (07:57:17, 4 December 2024)
- ML20213G855 + (07:57:18, 4 December 2024)
- ML20213G853 + (07:57:18, 4 December 2024)
- 05000482/LER-1986-058, :on 861015,hourly Fire Watch of Area Containing Inoperable Fire Barrier Penetration Missed.Caused by Personnel Error.Event Discussed in Training Sessions for Fire Watch Personnel + (07:57:21, 4 December 2024)
- ML20213G850 + (07:57:21, 4 December 2024)
- ML20213G849 + (07:57:22, 4 December 2024)
- IR 05000333/1986017 + (07:57:23, 4 December 2024)
- ML20213G846 + (07:57:24, 4 December 2024)
- ML20213G847 + (07:57:24, 4 December 2024)
- ML20213G843 + (07:57:25, 4 December 2024)
- 05000440/LER-1986-070, :on 861023,drywell Vacuum Relief (DVR) Valve Opened Automatically Due to Increase in Differential Pressure.Caused by Conservative DVR Valve Setpoints.Work Order Initiated to Raise DVR Setpoints + (07:57:28, 4 December 2024)
- ML20213G841 + (07:57:29, 4 December 2024)
- 05000440/LER-1986-069, :on 861015,determined That Tech Spec Actions for Operation W/Inoperable Control Rod Not Performed as Required During Plant Operations on 861011-14.Caused by Personnel Error.Rod Control Sys Test Instruction Changed + (07:57:32, 4 December 2024)
- ML20213G836 + (07:57:35, 4 December 2024)
- ML20213G839 + (07:57:35, 4 December 2024)
- ML20213G835 + (07:57:36, 4 December 2024)
- PNO-III-87-066, on 870509,during Process of Heating Up Unit Following Refueling Outage,Water Hammer Damaged Main Steam Line 1B Outside Containment.Cause Unknown.Msivs & Bypass Valves Taken Out of Svc & Repairs Started + (07:57:36, 4 December 2024)
- ML20213G832 + (07:57:37, 4 December 2024)
- ML20213G829 + (07:57:41, 4 December 2024)
- ML20213G828 + (07:57:42, 4 December 2024)
- ML20213G821 + (07:57:43, 4 December 2024)
- ML20213G823 + (07:57:43, 4 December 2024)