ML20213G873

From kanterella
Jump to navigation Jump to search
Amend 79 to License NPF-7,revising Condition 2.C.(15)(c) to Permit Second Insp of Recirculation Spray Pumps Inside Containment to Be Performed During Forth Coming NA-2 1987 Refueling Outage
ML20213G873
Person / Time
Site: North Anna Dominion icon.png
Issue date: 05/11/1987
From: Rubenstein L
Office of Nuclear Reactor Regulation
To:
Shared Package
ML20213G875 List:
References
NUDOCS 8705190002
Download: ML20213G873 (2)


Text

_

gf o

UNITED STATES g

NUCLEAR REGULATORY COMMISSION o

5 E

W ASHINGTON, D. C. 20555 a

%,,,,, /

VIRGINIA ELECTRIC AND POWER 20MPANY OLD DOMINION ELECTRIC COOPERATIVE DOCKET NO. 50-339 l

l NORTH ANNA POWER STATION, UNIT NO. 2 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 79 License No. NPF-7 1.

The Nuclear Regulatory Comission (the Comissioni has found that:

A.

The application for amendment by Virginia Electric and Power Company, et al., (the licenseel dated February 19, 1987,. complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Comission's rules and regulations set forth in 10 CFR Chapter I; I

B.

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Comission; C.

There is reasonable assurance (il that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Comission's regulations; D.

The issuance of this amendment will not be inimical to the comon defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Comission's regulations and all applicable requiremuts have been satisfied.

i 8705190002 870511

~

PDR ADOCK 05000339 P

PDR

f

.?.

?.

Accordingly, the license is amended by revising paragraph 2.C.(15)(c) to read as follows:

(c) VEPC0 shall remove and inspect the recirculation spray pumps inside containment and replace bearings if necessary. A similar inspection shall be performed at least once every five years thereafter (the second inspection shall be perforw.ed during the 1987 refueling outage).

3.

This license amendment is effective as of the date of its issuance.

FOR THE NUCLEAR REGULATORY COMMISSION Lester ubenstein, Director Proiect Directorate 11-2 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation Date of Issuance: May 11, 1987 1

0