Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20214K954 + (06:40:41, 4 December 2024)
- ML20214K951 + (06:40:42, 4 December 2024)
- ML20214K949 + (06:40:43, 4 December 2024)
- ML20214K946 + (06:40:44, 4 December 2024)
- ML20214K944 + (06:40:45, 4 December 2024)
- NRC-87-0043, Forwards Proposed License Condition 2.C(10), Emergency Diesel Generator Lube Oil Surveillance Program, Per NRC 870407 SER & Util 870128 Application for Amend to License NPF-43 + (06:40:49, 4 December 2024)
- ML20214K943 + (06:40:49, 4 December 2024)
- ML20214K939 + (06:40:50, 4 December 2024)
- U-600937, Informs That Final Analysis of Equipment Re Survivability in Event of Hydrogen Generation & Combustion Following Degraded Core Accident Will Not Be Submitted Until 871030.Problems W/ Testing Program Due to Mechanical Problems Caused Delay + (06:40:51, 4 December 2024)
- U-600947, Notification of Unusual Event:On 870524,motor-driven Feed Pump Regulating Valve 1FW-F004 Malfunctioned,Increasing Reactor Water Level.Cause Under Investigation.Valve Shifted to Manual Control W/No Response.Event Terminated Same Day + (06:40:52, 4 December 2024)
- ML20214K933 + (06:40:52, 4 December 2024)
- PY-CEI-NRR-0650, Responds to Violations Noted in Insp Rept 50-440/87-04 on 870304-0413.Corrective Actions:Diesel Generator Control Air Solenoid Valves in Svc for Over 6 Months Replaced & Failed Valves Returned to Vendor + (06:40:53, 4 December 2024)
- NRC-87-0074, Forwards Addl Info Re Facility Conformance W/Provisions of TMI Action Plan Item II.K.3.28, Verify Qualification of Accumulators on Automatic Depressurization Sys Valves, Per NRC 861205 Request + (06:40:53, 4 December 2024)
- ML20214K926 + (06:40:54, 4 December 2024)
- 3F1186-15, Forwards Response to Violations Noted in Insp Rept 50-302/86-27.Corrective Actions:Independent two-party Verification Performed for Procedure SP-341.Procedure CP-115, In-Plant Switching & Tagging, Will Be Revised + (06:40:55, 4 December 2024)
- ML20214K925 + (06:40:55, 4 December 2024)
- ML20214K918 + (06:40:56, 4 December 2024)
- ML20214K920 + (06:40:56, 4 December 2024)
- ML20214K915 + (06:40:57, 4 December 2024)
- IR 05000331/1986017 + (06:41:01, 4 December 2024)
- IR 05000354/1986049 + (06:41:03, 4 December 2024)
- IR 05000348/1986023 + (06:41:04, 4 December 2024)
- ML20214K907 + (06:41:04, 4 December 2024)
- ML20214K900 + (06:41:08, 4 December 2024)
- ML20214K894 + (06:41:09, 4 December 2024)
- ML20214K891 + (06:41:09, 4 December 2024)
- IR 05000413/1987010 + (06:41:14, 4 December 2024)
- ML20214K887 + (06:41:14, 4 December 2024)
- ML20214K886 + (06:41:15, 4 December 2024)
- ML20214K881 + (06:41:16, 4 December 2024)
- ML20214K884 + (06:41:16, 4 December 2024)
- ML20214K879 + (06:41:17, 4 December 2024)
- ML20214K878 + (06:41:17, 4 December 2024)
- ML20214K877 + (06:41:18, 4 December 2024)
- ML20214K875 + (06:41:19, 4 December 2024)
- ML20214K876 + (06:41:19, 4 December 2024)
- ML20214K873 + (06:41:20, 4 December 2024)
- ML20214K872 + (06:41:21, 4 December 2024)
- ML20214K869 + (06:41:21, 4 December 2024)
- AECM-86-0355, Discusses Activities Conducted During Current Refueling Outage Re Application of Raychem Shrinkable Tubing on Electrical Splices.Field Walkdown Insp Conducted.Certain Splices Reworked Based on Conservative Acceptance Criteria + (06:41:22, 4 December 2024)
- ML20214K868 + (06:41:22, 4 December 2024)
- ML20214K865 + (06:41:23, 4 December 2024)
- PY-CEI-NRR-0523, Forwards Responses to 860418 Commission Order Re Four Specific earthquake-related Questions.Util Determined 860131 Earthquake Nondestructive to Plant.Comprehensive Field Studies Identified No Tectonic Structure Associated W/Event + (06:41:24, 4 December 2024)
- AECM-86-0248, Forwards Relief Request I-00013 Seeking NRC Approval for Use of Summer 1983 Addenda of ASME Section Xi,Based on Interpretation of 10CFR50.55(a)(g)(4)(iv), Re Inservice Insp Requirements for Reactor Pressure Vessel Nozzles + (06:41:25, 4 December 2024)
- ML20214K863 + (06:41:25, 4 December 2024)
- 3F0587-08, Forwards Response to Violations Noted in Insp Rept 50-302/87-02 & Payment for Proposed Imposition of Civil Penalty in Amount of $50,000.Response Withheld + (06:41:26, 4 December 2024)
- ML20214K861 + (06:41:26, 4 December 2024)
- ML20214K858 + (06:41:27, 4 December 2024)
- ML20214K857 + (06:41:28, 4 December 2024)
- ML20214K855 + (06:41:28, 4 December 2024)
- ML20214K854 + (06:41:29, 4 December 2024)
- 05000414/LER-1986-045-01, :on 861011,turbine-driven Auxiliary Feedwater Pump Found to Be Inoperable from Standby Shutdown Facility. Caused by Incorrectly Installed Solenoid Valve Due to Design Deficiency.Valve Retubed + (06:41:31, 4 December 2024)