Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20214N667 + (06:20:43, 4 December 2024)
- ML20214N662 + (06:20:44, 4 December 2024)
- ML20214N659 + (06:20:45, 4 December 2024)
- ST-HL-AE-2203, Forwards Editorial Corrections for Amends 59 & 60 to FSAR, Revising Responses to Questions 220.31N & 220.32N, Respectively.Changes Will Be Incorporated in Amend 61 to FSAR + (06:20:46, 4 December 2024)
- ML20214N656 + (06:20:46, 4 December 2024)
- PNO-I-86-071, on 860911,bomb Threats Received by Telephone. Nonessential Personnel Released & Bldg Searched + (06:20:47, 4 December 2024)
- ML20214N650 + (06:20:49, 4 December 2024)
- ML20214N649 + (06:20:50, 4 December 2024)
- ML20214N648 + (06:20:53, 4 December 2024)
- ML20214N647 + (06:20:54, 4 December 2024)
- ML20214N643 + (06:20:55, 4 December 2024)
- ML20214N640 + (06:20:55, 4 December 2024)
- ML20214N632 + (06:20:58, 4 December 2024)
- ML20214N634 + (06:20:58, 4 December 2024)
- ML20214N629 + (06:20:59, 4 December 2024)
- ML20214N628 + (06:20:59, 4 December 2024)
- 05000301/LER-1986-007, :on 861009-22,eddy Current Insp of Steam Generator Tubes Conducted.Eight Tubes Degraded Equal to or Greater than 40% & Six W/Undefined Signal.All 58 Tubes Plugged + (06:21:01, 4 December 2024)
- ML20214N625 + (06:21:02, 4 December 2024)
- ML20214N623 + (06:21:02, 4 December 2024)
- ML20214N621 + (06:21:03, 4 December 2024)
- ML20214N620 + (06:21:04, 4 December 2024)
- TXX-4992, Responds to NRC Requesting Addl Info Re Violations Noted in Insp Repts 50-445/86-16 & 50-446/85-13. Corrective Actions:Addl Calculations Performed to Show Design Change Acceptable & Engineering Personnel Counseled + (06:21:04, 4 December 2024)
- TXX-5018, Forwards Rev 1 to Results Rept I.d.3, Craft Personnel Training + (06:21:05, 4 December 2024)
- ML20214N616 + (06:21:05, 4 December 2024)
- ML20214N612 + (06:21:06, 4 December 2024)
- ML20214N611 + (06:21:07, 4 December 2024)
- 05000354/LER-1986-082, :on 861028,HPCI Sys Declared Inoperable After Discovery That Flow Controller Proportional Gain Adjusted Earlier W/O Retest of HPCI Sys.Caused by Personnel Error. Hpic & RCIC Returned to Operable Status + (06:21:10, 4 December 2024)
- ML20214N600 + (06:21:10, 4 December 2024)
- ML20214N596 + (06:21:11, 4 December 2024)
- ML20214N595 + (06:21:12, 4 December 2024)
- ML20214N594 + (06:21:13, 4 December 2024)
- ML20214N590 + (06:21:15, 4 December 2024)
- ML20214N584 + (06:21:16, 4 December 2024)
- ML20214N585 + (06:21:16, 4 December 2024)
- ML20214N582 + (06:21:19, 4 December 2024)
- ML20214N579 + (06:21:20, 4 December 2024)
- 0CAN088615, Responds to Violations Noted in Insp Repts 50-313/86-17 & 50-368/86-18.Corrective Actions:Vendor Technical Manuals for Emergency Feedwater Pump Terry Turbines + (06:21:21, 4 December 2024)
- ML20214N567 + (06:21:22, 4 December 2024)
- ML20214N568 + (06:21:22, 4 December 2024)
- ML20214N566 + (06:21:23, 4 December 2024)
- ML20214N561 + (06:21:24, 4 December 2024)
- 05000413/LER-1986-042, :on 860808,reactor Tripped During Breaker Testing.Caused by Personnel Error.Supervisors & Technicians Will Be Cautioned Re Importance of Attention to Detail Concerning Testing + (06:21:26, 4 December 2024)
- IR 05000344/1986028 + (06:21:26, 4 December 2024)
- 05000281/LER-1986-015-02, :on 861031,pressurizer Safety Valves Had Lift Setpoints Outside Allowable Limits During Refueling Surveillance Testing.Safety Valve Setpoints Reset.Vendor Failure Analysis Underway + (06:21:29, 4 December 2024)
- TXX-4997, Interim Deficiency Rept CP-86-48 Re Adequacy of Nonconformance Dispositions.Evaluation of Issue Involving Rev of Disposition of Nonconformance Rept Scheduled for Completion by 861003.Next Rept Anticipated by 861024 + (06:21:29, 4 December 2024)
- ML20214N546 + (06:21:30, 4 December 2024)
- ML20214N543 + (06:21:31, 4 December 2024)
- 05000298/LER-1986-016, :on 860813,reactor Scram Occurred.Caused by Lack of Proper Preplanning for Relay Replacement & Specific Procedural Guidance.Need for Preplanning of Maint Activities Reemphasized + (06:21:33, 4 December 2024)
- ML20214N540 + (06:21:33, 4 December 2024)
- IR 05000498/1986029 + (06:21:41, 4 December 2024)
- ML20214N535 + (06:21:42, 4 December 2024)