TXX-5018, Forwards Rev 1 to Results Rept I.d.3, Craft Personnel Training

From kanterella
Jump to navigation Jump to search
Forwards Rev 1 to Results Rept I.d.3, Craft Personnel Training
ML20214N615
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 09/12/1986
From: Counsil W
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To: Noonan V
NRC - COMANCHE PEAK PROJECT (TECHNICAL REVIEW TEAM)
Shared Package
ML20214N617 List:
References
CPRT-649, TXX-5018, NUDOCS 8609160386
Download: ML20214N615 (2)


Text

I t

CPRT-649 Log # TXX-5018 4

File # 10068 TEXAS UTILITIES GENERATING COMPANY NKYWAY TOWF A. 400 NORTH OtJVE NTREET.1.35. N 1. DA1.LAN. TEXAM 78201 59-44S September 12, 1986 g

'"ht1* c? "1%

a..

Director of Nuclear Reactor Regulation Attn:

Vince S. Noonan, Director Comanche Peak Project Division of Licensing U. S. Nuclear Regulatory Commission Washington, D. C.

20555

SUBJECT:

COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)

DOCKET NOS.

50-445 AND 50-446 CPRT RESULTS REPORT

Dear Mr. Noonan:

We transmit herewith the SRT approved Results Report I.d.3, Craft Personnel Training, Revision 1.

The files which contain supporting documentation for the Results Report have been reproduced in their entirety and are available for public inspection in our Dallas office. Anyone wishing to inspect these files should contact Ms. Susan Palmer (214/979-8242).

We shall issue further Results Reports ~on a periodic basis as they are approved by the CPRT Senior Review Team.

Very truly yours,

/f f(j W. G. Counsil WGC/amb Enclosure 1

8609160386 860912

/Lp)

PDR ADOCK 05000445 A

PDR Q

l t

A DIVISION OF TEXAN ttTEE2 TIES EEEtTRIC COStPANY

f CPRT-0645 LOG NO. TUS-4912 p

FILE NO. 10068 TEXAS UTILITIES GENERATING COMPANY SEYWAY TOWER

  • 400 NORTM OEJVE STREET, L.B. 81
  • DALLAS. TEXAS 78901 Jff,%?,,"l,c,"

September 8, 1986 MEMORANDUM TO:

MR.

W.

G.

COUNSIL

SUBJECT:

CPRT RESULTS REPORT We transmit herewith the SRT approved Results Report listed below.

The files which.contain supporting documentation for the Results Report have been reproduced and are available in the Dallas file room for public inspection.

I.d.3 Craft Personnel Training Revision 1 M

John W.

Beck

Chairman, CPRT Senior Review Team JWB:tj Enclosure ca 4

Ec:

CPRT File fo e>

')..

v,

,40 lE 4

A DEVISION OF TEXAS LITTLITIES ELECTRIC COMPANY

,,.- --