Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20214P508 + (06:11:09, 4 December 2024)
- TXX-5034, Forwards S&W, Comanche Peak Project Procedures (Cppp), Including Project Memo,Except CPPP-7 Which Was Transmitted on 860728 + (06:11:10, 4 December 2024)
- ML20214P507 + (06:11:10, 4 December 2024)
- ML20214P504 + (06:11:11, 4 December 2024)
- ST-HL-AE-2196, Forwards Revised FSAR Section 3.6.1.1(9), Design Bases..., Allowing for Use of Analytical Methods to Evaluate Capability of Impacted Piping to Withstand Whip Impact W/O Rupture + (06:11:11, 4 December 2024)
- ML20214P503 + (06:11:12, 4 December 2024)
- ML20214P502 + (06:11:13, 4 December 2024)
- ML20214P501 + (06:11:13, 4 December 2024)
- ST-HL-AE-2195, Forwards Annotated Pages to Plant Fhar Documenting & Justifying App R Section III.G.2.a Deviation for Separation of Fire Areas 2 & 17.Deviation Will Be Incorporated in Future Amend to Fhar + (06:11:14, 4 December 2024)
- ML20214P494 + (06:11:15, 4 December 2024)
- 05000285/LER-1987-011, :on 870428,ventilation Isolation Actuation Sys (Vias) Actuated During Clutch Power Supply Swap.Cause Under Investigation.Pressurizer Pressure Low Signal Relocked & Safety Injection Actuation Signal & Vias Reset + (06:11:16, 4 December 2024)
- ML20214P492 + (06:11:17, 4 December 2024)
- IR 05000456/1986050 + (06:13:01, 4 December 2024)
- ML20214P488 + (06:13:02, 4 December 2024)
- ML20214P489 + (06:13:02, 4 December 2024)
- ML20214P483 + (06:13:12, 4 December 2024)
- ML20214P484 + (06:13:12, 4 December 2024)
- ML20214P482 + (06:13:13, 4 December 2024)
- ML20214P477 + (06:13:14, 4 December 2024)
- ML20214P479 + (06:13:14, 4 December 2024)
- ML20214P476 + (06:13:15, 4 December 2024)
- ML20214P475 + (06:13:15, 4 December 2024)
- ML20214P474 + (06:13:16, 4 December 2024)
- ML20214P473 + (06:13:17, 4 December 2024)
- ML20214P472 + (06:13:17, 4 December 2024)
- ML20214P468 + (06:13:18, 4 December 2024)
- ML20214P465 + (06:13:19, 4 December 2024)
- ML20214P463 + (06:13:20, 4 December 2024)
- ML20214P464 + (06:13:20, 4 December 2024)
- ST-HL-AE-2209, Forwards Revised FSAR Sections 9.5.5 & 9.5.6 Indicating That Ac Motor Driven Jacket Water Standby Pump Automatically Starts on Low Water Pressure & Traps Provided in Air Receiver Drains If Needed,Respectively + (06:13:21, 4 December 2024)
- ML20214P459 + (06:13:21, 4 December 2024)
- ST-HL-AE-2166, Forwards Addl Info Re Mods Being Employed for Fire Barriers in Which Seismic Gap Filler Matl (Rotofoam) Installed,Per 870330-0403 App R Fire Protection Audit + (06:13:22, 4 December 2024)
- ML20214P457 + (06:13:23, 4 December 2024)
- ML20214P456 + (06:13:23, 4 December 2024)
- ML20214P453 + (06:13:24, 4 December 2024)
- ML20214P454 + (06:13:24, 4 December 2024)
- ML20214P451 + (06:13:25, 4 December 2024)
- ML20214P452 + (06:13:25, 4 December 2024)
- ML20214P449 + (06:13:26, 4 December 2024)
- ML20214P444 + (06:13:27, 4 December 2024)
- ML20214P442 + (06:13:28, 4 December 2024)
- ML20214P440 + (06:13:29, 4 December 2024)
- ML20214P441 + (06:13:29, 4 December 2024)
- ML20214P439 + (06:13:30, 4 December 2024)
- ST-HL-AE-2204, Forwards Annotated Rev to FSAR Section 3.9.1.2.2 Re Use of Computer Programs for Piping Analyses.Rev Incorporates Ref to Two Addl Computer Programs Being Used in Small Bore Pipe Support Analysis.Rev to Be Included in Next FSAR Amend + (06:13:31, 4 December 2024)
- ML20214P438 + (06:13:31, 4 December 2024)
- ML20214P435 + (06:13:32, 4 December 2024)
- ML20214P433 + (06:13:33, 4 December 2024)
- ML20214P434 + (06:13:33, 4 December 2024)
- ML20214P429 + (06:13:34, 4 December 2024)
- ML20214P431 + (06:13:34, 4 December 2024)