Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000416/LER-1986-041, :on 861030,Divs 1 & 2 Auxiliary Bldg Isolation Valve Bypass Switches Found in Bypass Position Following Establishment of Secondary Containment Integrity.Caused by Inadequate Procedure.Procedure to Be Revised + (06:07:17, 4 December 2024)
- ML20214P821 + (06:07:17, 4 December 2024)
- ML20214P818 + (06:07:18, 4 December 2024)
- ML20214P816 + (06:07:19, 4 December 2024)
- 05000295/LER-1987-009-06, :on 870430,safety Injection Occurred Due to Steam Line Delta Pressure.Caused by Deenergization of MSIVs Due to Electrical Equipment Operator Misinterpreting Shift Engineer.Changes Made Re Communications + (06:07:21, 4 December 2024)
- ML20214P814 + (06:07:21, 4 December 2024)
- TXX-5015, Interim Deficiency Rept CP-86-17 Re Min Concrete Coverage for Reinforcing Steel in Floors & Walls to Maintain 3 H Fire Rating.Initially Reported on 860321.Structural Capacity of Concrete Elements Being Evaluated.Next Rept by 861124 + (06:07:22, 4 December 2024)
- NUREG-1222, Requests Listed Marked Documents Re Rev 1 to NUREG-1147, Seismic Safety Research Program Plan, Be Placed in PDR + (06:07:22, 4 December 2024)
- ML20214P811 + (06:07:23, 4 December 2024)
- ML20214P809 + (06:07:24, 4 December 2024)
- RBG-25997, Special Rept:On 870423,invalid Failure Experienced on Div II Diesel Generator While Performing Surveillance Testing.No Action Required to Maintain Diesel Generator Operable.Failed Relay Replaced.Testing Sucessfully Completed + (06:07:26, 4 December 2024)
- ML20214P803 + (06:07:27, 4 December 2024)
- ML20214P804 + (06:07:27, 4 December 2024)
- ML20214P801 + (06:07:28, 4 December 2024)
- ML20214P800 + (06:07:29, 4 December 2024)
- ML20214P799 + (06:07:30, 4 December 2024)
- ML20214P796 + (06:07:31, 4 December 2024)
- ST-HL-AE-2199, Part 21 & Final Deficiency Rept Re Electrical Auxiliary Bldg HVAC Fan Motor Failures.Initially Reported on 870428. American Air Filter Committed to Revise & Resubmit air-over Curves for Affected Fans + (06:07:32, 4 December 2024)
- ML20214P795 + (06:07:32, 4 December 2024)
- ML20214P788 + (06:07:34, 4 December 2024)
- ML20214P787 + (06:07:35, 4 December 2024)
- ML20214P786 + (06:07:35, 4 December 2024)
- ML20214P785 + (06:07:36, 4 December 2024)
- ML20214P784 + (06:07:36, 4 December 2024)
- TXX-6482, Interim Deficiency Rept CP-84-12 Re Environ Qualification of Equipment Outside Containment for High Energy Line Breaks. Initially Reported in 840604.Analysis of Issue Continuing. Next Rept Will Be Submitted on 870728 + (06:07:40, 4 December 2024)
- ML20214P781 + (06:07:42, 4 December 2024)
- AECM-87-0106, Responds to NRC Re Violations Noted in Insp Rept 50-416/87-10.Corrective Actions:Training Session Conducted by QA Dept for All QA Insp & Audit Personnel & Procedure 01-S-06-3 Re Temporary Alterations Will Be Revised + (06:07:43, 4 December 2024)
- ML20214P780 + (06:07:43, 4 December 2024)
- ML20214P778 + (06:07:44, 4 December 2024)
- ML20214P777 + (06:07:45, 4 December 2024)
- ML20214P775 + (06:07:49, 4 December 2024)
- 05000327/LER-1986-049, :on 861102,standby Diesel Generators Started on Loss of Voltage to Shutdown Board 1B-B 6.9 Kv.Caused by Personnel Error.Signs Will Be Added to End of Each 6.9 Kv Unit Board to Designate Board Ends + (06:07:50, 4 December 2024)
- ML20214P773 + (06:07:51, 4 December 2024)
- ML20214P772 + (06:07:52, 4 December 2024)
- ML20214P771 + (06:07:52, 4 December 2024)
- 05000529/LER-1986-030-01, :on 860826,Train B Containment Purge Actuation Signal Generated by Esfas.Caused by Malfunction of Output Relay in Power Access Purge Area Monitor.Output Relay Replaced & Monitor Retested + (06:07:54, 4 December 2024)
- ML20214P765 + (06:07:55, 4 December 2024)
- ML20214P763 + (06:07:56, 4 December 2024)
- ML20214P764 + (06:07:56, 4 December 2024)
- ML20214P760 + (06:07:57, 4 December 2024)
- TXX-6464, Final Deficiency Rept CP-86-69 Re Failure to Incorporate Specific Restraining/Support Requirements Into Project Specs & Procedures.Initially Reported on 861002.Design Change Authorization Issued to Revise Spec 2323-ES-100 + (06:07:57, 4 December 2024)
- ST-HL-AE-2177, Final Deficiency Rept Re Small Break LOCA Mitigation During Plant Shutdown.Initially Reported on 860929.For Small Breaks in Modes 3 & 4,issue Not Reportable Under 10CFR50.55(e) + (06:07:58, 4 December 2024)
- ML20214P756 + (06:07:59, 4 December 2024)
- ML20214P754 + (06:08:00, 4 December 2024)
- TXX-6477, Advises That Completion of Environ Qualification Verification Program Corrective Actions Described in App B, Item I.B.5 of Enforcement Action 86-09 Revised to 871001 for Unit 1 & 881101 for Unit 2 + (06:08:01, 4 December 2024)
- ML20214P752 + (06:08:01, 4 December 2024)
- ST-HL-AE-2200, Third Interim Deficiency Rept Re Electrical Splices Using Raychem Heat Shrink Insulation Matl Installed Incorrectly. Initially Reported on 870219.Insp in Progress to Determine Number of Incorrectly Installed Splices.Next Rept by 870610 + (06:08:02, 4 December 2024)
- ML20214P750 + (06:08:02, 4 December 2024)
- 05000483/LER-1987-007, :on 870504,control Room Ventilation Isolation Occurred When Test Probes of Digital Voltmeter Placed Across Incorrect Terminals in Solid State Protection Sys Cabinet. Caused by Personnel Error + (06:08:04, 4 December 2024)
- ML20214P748 + (06:08:05, 4 December 2024)
- TXX-6475, Interim Deficiency Rept CP-86-40 Re Procurement & Use of Nonqualified Agastat Relays in Class 1E Applications. Initially Reported on 861010.Future 7000 Series Relays Will Be Purchased with E Prefix.Next Rept Expected by 871009 + (06:08:05, 4 December 2024)
- ML20214P746 + (06:08:06, 4 December 2024)