ML20214P784

From kanterella
Jump to navigation Jump to search
Notice of Deposition of J Beck in Dallas,Tx Immediately Following Deposition by Wg Counsil.Related Correspondence
ML20214P784
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 09/18/1986
From: Garde B
Citizens Association for Sound Energy, TRIAL LAWYERS FOR PUBLIC JUSTICE, P.C.
To:
Shared Package
ML20214P697 List:
References
OL, NUDOCS 8609240057
Download: ML20214P784 (3)


Text

. . . .

y gegotD 00 4 w00METEc USNFC BEFvRS Trid UNITED STATES NUCLEAR RLGOLATORf COMMISSION 16 SEP 22 P1 :12 netore the Atomic Sarety ano Licensing Boarq vFFICE OF 5: ua agy DOCXETING A SEFVICI in cne Matter or )

^ CH l

TdAAS OTILITidS GENERATING COMPANY, J Dkt. Nos. 50-443-OL et al. ) 50-446-OL I

(Comancne Peak Steam diectric )

Station, Units 1 and 4) )

NOTICE OF DEPOSITION Intervenor CASE, pursuant to Rule J0(o) or the Federal Rules or Civ11 Proceoure ano 10 CPR 334.720 and 74ua, hereby provices notice tnat, immeolately rollowing the deposition of William G.

Couns11, intervenor will take tne oeposition upon oral examination or John deck. The oeposition will be neld in callas, Texas, at tne orfices ot Frederick Baron and Associates, Suite 140u, Dallas Feoeral Savings Builaing, 6333 Douglas Avenue, callas 732es.

Tne aeposition will continue f rom day to cay until completeo, suoject to such adjournment as may be agreed upon by Counsel.

Mr. Becs is also oirecteo to oring to the deposition, as inoicatea oy tne enclosea suopoena, all documents in his custody or possession ' tor unoer nis control) that refer or relate in any way to:

t11 tils responsioilities as cnairman or the Senior Review 1'e a m , inclucing out not limited to the interface oetween nimself 8609240057 860918 PDR ADOCK05000g5 G

9 i

anu TU8C orricials.

L4; Tne nistory anu cevelopinent ot tne CPRT throu9n its revisions to tne present.

(J) Tne process enrouyn wnicn TU8C 1mplements 10 CFa Part 50, Appena1x d, respons10111tles in regara to CPdf activities.

(4) Tne satety signiricance evaluation process.

(a) Tne collective evaluation program.

(o) Tne Senior Review Team aecision process anc the process Oy wnicn it controls tne CPRT.

(7) Tne removal or Monty wise as Electrical Review Team Leaoer.

(d) Tne selection ano evaluation process ot ERC as the tnira-party reviewer.

t9; Any otner matters witn respect to the CPRT program adequacy, incluaing the Region IV NRC ana TRT involvesnent in the oevelopment ano implementation of the prograin.

" Document" ana11 anean every instrument or device by which, tnrougn wnicn, or on wnica information has Deen recorded, incluaing enose rerlecting meetings, discussions, or conversations; notes; letters; orawings; tiles; graphs;; charts; anaps; pnotograpns; ceeds; stuales; data sneets; noteoooks; oooks; appointment calenaars; telepnone utils; telegnone messages; receipts; voucners; ininutes or meetings; pampniets; computations; calculations; accounting (s;; tinancial s ta temen ts; voice recoraings; coinputer printouts; ano any device or sneaium on wnicn or enrouyn wnica intormation or any type is transmitted, recoraeu, or preserved. The term "cocument" also means every

, 'o 1

copy or a cocument when sucn copy is not an identical duplicate of tne original.

Counsel ror intervenor will ask Mr. Beck to icentify each document proouced in response to tne enclosed suopoena and counsel may examine rir. Beck concerning tne contents of tne documents proouced.

Counsel for intervenor will examine Mr. Beck on all mattters relevant to tne adequacy of the CPRT and tne aoove mentioned matters and all explanations ylven by Applicants.

Respectru11y submitteo, r  ? Aff /,

BILL 18 P. GARD 8

'F(

Trial Lawyers for Puolic Justic&

3424 dortn Marcos Lane appleton, WI 54911 Counsel tor CASE Dated: Septemoer 16, 1900 l

l

!