Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20215F020 + (03:36:26, 4 December 2024)
- ML20215F016 + (03:36:27, 4 December 2024)
- ML20215F017 + (03:36:27, 4 December 2024)
- ML20215F015 + (03:36:28, 4 December 2024)
- ML20215F014 + (03:36:29, 4 December 2024)
- ML20215F013 + (03:36:29, 4 December 2024)
- ML20215F011 + (03:36:30, 4 December 2024)
- ML20215F009 + (03:36:33, 4 December 2024)
- ML20215F007 + (03:36:35, 4 December 2024)
- ML20215F006 + (03:36:36, 4 December 2024)
- ML20215F005 + (03:36:36, 4 December 2024)
- ML20215F003 + (03:36:37, 4 December 2024)
- ML20215F004 + (03:36:37, 4 December 2024)
- ML20215F002 + (03:36:38, 4 December 2024)
- ML20215E999 + (03:36:39, 4 December 2024)
- ML20215E998 + (03:36:39, 4 December 2024)
- 05000352/LER-1986-042, :on 860814,Surveillance Test ST-6-095-450-1 Contained Two Errors,Indicating Availability of Power Throughout Period.Caused by Personnel Error.Test Revised & Administrative Controls Reviewed + (03:36:41, 4 December 2024)
- ML20215E994 + (03:36:42, 4 December 2024)
- ML20215E993 + (03:36:43, 4 December 2024)
- IR 05000424/1986109 + (03:36:45, 4 December 2024)
- ML20215E991 + (03:36:46, 4 December 2024)
- ML20215E988 + (03:36:47, 4 December 2024)
- ML20215E989 + (03:36:47, 4 December 2024)
- ML20215E986 + (03:36:48, 4 December 2024)
- ML20215E984 + (03:36:48, 4 December 2024)
- TXX-6007, Interim Deficiency Rept CP-86-54 Re Design & Installation of Control Room Ceiling.Initially Reported on 860917.Const of New Ceiling Scheduled for Completion by 861101.Next Rept Anticipated by 861114 + (03:36:49, 4 December 2024)
- PNO-V-86-070, on 861004,discovered Two Snubbers on Charging Sys Mistakenly Removed.Charging Sys Required by Tech Specs for Refueling Boration Flow Path.Snubbers Reinstalled within Hour of Discovery + (03:36:50, 4 December 2024)
- ML20215E978 + (03:36:51, 4 December 2024)
- ML20215E977 + (03:36:52, 4 December 2024)
- ML20215E976 + (03:36:53, 4 December 2024)
- ML20215E974 + (03:36:54, 4 December 2024)
- ML20215E973 + (03:36:54, 4 December 2024)
- ML20215E972 + (03:36:55, 4 December 2024)
- ML20215E970 + (03:37:01, 4 December 2024)
- ML20215E968 + (03:37:02, 4 December 2024)
- ML20215E969 + (03:37:02, 4 December 2024)
- ML20215E965 + (03:37:03, 4 December 2024)
- ML20215E966 + (03:37:03, 4 December 2024)
- PNO-V-86-071, on 861006,reactor Tripped from 20% Power on Low Dnbr.Caused by Feedwater Perturbations.Safety Injection Activated.All Safety Sys Responded as Designed + (03:37:04, 4 December 2024)
- ML20215E961 + (03:37:05, 4 December 2024)
- ML20215E963 + (03:37:05, 4 December 2024)
- ML20215E959 + (03:37:06, 4 December 2024)
- ML20215E960 + (03:37:06, 4 December 2024)
- TAC:62846 + (03:37:07, 4 December 2024)
- ML20215E957 + (03:37:09, 4 December 2024)
- ML20215E951 + (03:37:13, 4 December 2024)
- ML20215E954 + (03:37:13, 4 December 2024)
- ML20215E950 + (03:37:14, 4 December 2024)
- 05000440/LER-1986-061, :on 860910 & 1002,RWCU Sys Automatically Isolated When Main Steam Line Differential Temp Module Switch Taken to Read. Caused by Fault in Switch Module 1E31-N605A.Temp Switch Modules Scheduled for Replacement + (03:37:16, 4 December 2024)
- ML20215E947 + (03:37:16, 4 December 2024)
- ML20215E946 + (03:37:18, 4 December 2024)