Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20215J335 + (03:04:39, 4 December 2024)
- ML20215J332 + (03:04:40, 4 December 2024)
- ML20215J331 + (03:04:41, 4 December 2024)
- ML20215J330 + (03:04:41, 4 December 2024)
- 05000287/LER-1986-002-06, :on 860917,main Feedwater Pumps & Emergency Feedwater Sys Tripped & 3KI Essential Ac Power Lost During Reactor Trip Due to Pipe Rupture.Caused by Component Failure.Unit Brought to Hot Shutdown + (03:04:43, 4 December 2024)
- IR 05000445/1987001 + (03:04:44, 4 December 2024)
- ML20215J325 + (03:04:44, 4 December 2024)
- 05000529/LER-1986-046-01, :on 860922,safety Injection Actuation Signal Automatically Actuated.Caused by Malfunctioning of Channel B Manual Actuation Handswitch.Faulty Handswitch Replaced + (03:04:46, 4 December 2024)
- ML20215J322 + (03:04:47, 4 December 2024)
- L-86-373, Forwards Aug 1986 Progress Summary of Select Sys Assessment + (03:04:48, 4 December 2024)
- ML20215J321 + (03:04:48, 4 December 2024)
- ML20215J319 + (03:04:49, 4 December 2024)
- IR 05000186/1983001 + (03:04:51, 4 December 2024)
- ML20215J313 + (03:04:51, 4 December 2024)
- IR 05000029/1987008 + (03:04:53, 4 December 2024)
- ML20215J310 + (03:04:54, 4 December 2024)
- ML20215J305 + (03:04:55, 4 December 2024)
- ML20215J306 + (03:04:55, 4 December 2024)
- ML20215J304 + (03:04:56, 4 December 2024)
- ML20215J303 + (03:04:57, 4 December 2024)
- ML20215J302 + (03:04:58, 4 December 2024)
- IR 05000344/1987014 + (03:05:01, 4 December 2024)
- ML20215J298 + (03:05:03, 4 December 2024)
- 05000374/LER-1987-006-05, :on 870402,during Functional/Logic Testing in Modified Primary Containment Isolation Circuitry,Unexpected Group II Isolation (ESF) Occurred.Caused by Inattentive Test Engineers.Personnel Trained on Relay Testing + (03:05:05, 4 December 2024)
- ML20215J292 + (03:05:06, 4 December 2024)
- ML20215J291 + (03:05:07, 4 December 2024)
- ML20215J289 + (03:05:08, 4 December 2024)
- ML20215J290 + (03:05:08, 4 December 2024)
- ML20215J285 + (03:05:10, 4 December 2024)
- ML20215J283 + (03:05:10, 4 December 2024)
- ML20215J280 + (03:05:12, 4 December 2024)
- ML20215J279 + (03:05:12, 4 December 2024)
- ML20215J276 + (03:05:13, 4 December 2024)
- ML20215J277 + (03:05:13, 4 December 2024)
- ML20215J275 + (03:05:14, 4 December 2024)
- ML20215J273 + (03:05:15, 4 December 2024)
- ML20215J272 + (03:05:16, 4 December 2024)
- ML20215J270 + (03:05:18, 4 December 2024)
- 05000206/LER-1984-010, :on 840930,during Mode 5 Outage,Two of Three Boric Acid Flow Paths Inoperable.Caused by Accumulated Gas from Vol Control Tank Due to Leak in Valve CV406B.Valve Diaphragms Replaced.Procedures Revised + (03:05:20, 4 December 2024)
- ML20215J267 + (03:05:21, 4 December 2024)
- ML20215J265 + (03:05:22, 4 December 2024)
- ML20215J264 + (03:05:22, 4 December 2024)
- ML20215J262 + (03:05:23, 4 December 2024)
- ML20215J260 + (03:05:23, 4 December 2024)
- ML20215J259 + (03:05:24, 4 December 2024)
- ML20215J257 + (03:05:25, 4 December 2024)
- ML20215J256 + (03:05:25, 4 December 2024)
- ML20215J253 + (03:05:26, 4 December 2024)
- IR 05000186/1978004 + (03:05:27, 4 December 2024)
- ML20215J250 + (03:05:28, 4 December 2024)
- ML20215J249 + (03:05:29, 4 December 2024)
- ML20215J248 + (03:05:29, 4 December 2024)