Dockst No. 50-293
~
iMF V. N2rsss
~
DISTRIBUTMON Local PDR.
ACRS(10)
NRCPDR _
W. Paton-
^
PDI-3 Rdg.
. T. Murley Boston Edison Company N/C Nuclear OGC H. Rushbrook
- ATTN: Mr. Ralph G. Bird.
R. Wessman M. McBride, RI Senior Vice President - Nuclear S. Varga _
J. Craig 800 Boylston. Street B. Boger W. Kane, RI Boston, Massachusetts 02199 c-
Dear Mr. Bird:
i
SUBJECT:
PROPOSED ENHANCEMENTS TO THE MARK. I CONTAINMENT - PILGRIM' STATION i.
As you are aware, the NRC and the Nuclear Utilities Management and Resources Committee-(NUMARC) have been considering various initiatives that may improve the perfonnance of BWR Containments. Several-utilities have voluntarily stated their intent to take certain actions aimed at improving containment. performance i-
.and reducing the consequences of a severe accident, should one occur.
l On' July 25, 1986, Boston Edison announced their intention to make certain modifiutions to the Pilgrim containment'during the current outage. During 1
subsequent meetings with the NRC, Boston Edison has sumarized their ' plans for-implementing these modifications as part of their Safety Enhancement Project.
It:is our understanding that this project includes actions specifically affecting the containment such as~ modifications to the containment spray, installation of a torus vent path from the wet-well to the main _ stack, selected revisions to plant emergency procedures, and modifications to the nitrogen system.
As discussed between Mr.. R. N. Swanson of your _ staff and Mr. R.= Wessman (the Pilgrim Project Manager) on April 24, 1987, the NRC-needs to fully understand the modifications Boston Edison has voluntarily elected to implement and to assess the safety significance of these modifications. Accordingly, you are requested to submit for staff review a detailed description of your containment:
i modifications program including implementation schedule, hardware changes, procedural changes and operator training. This program should be_ submitted within 60 days to allow sufficient time for staff. review before the restart of-Pilgrin facility.
Please contact the Pilgrim Project Manager (R. H. Wessman, 592-4937) should you have questions regarding this request.
Sincerely, h
Steven A. -Varga, Director j
Division.of Reactor Projects, I/II
.i cc: See next page DISTRIBUTION:
1RStarostecki PDR WPaton, OGC i
LPDR MMcBride, RI JJKudrick WKane, RI TMurley-MThadani 1 -
s i
'PO PDI-I t II D:
f['
l,
.M4 rook RWess n e ;es jBB r.
S 4)p/87 4g/87 4
87 4/f0/87.
4
_ 87 0705070350 870430 PDR ADOCK 05000293 i~
P PDR
,. ~ _, _ - -, _,. -
a e s Mr. Ralph G. Bird Boston Edison Company Pilgrim Nuclear Power Station cc:
Mr. K. P. Roberts, Station Manager Boston Edison Company M/C Nuclear Boston Edison Company ATTN: Ralph G. Bird RFD #1, Rocky Hill Road Senior Vice President - Nuclear Plymouth, Massachusetts 02360 800 Boylston Street Boston, Massachusetts 02199 Resident Inspector's Office U. S. Nuclear Regulatory Commission Post Office Box 867 Plymouth, Massachusetts 02360 Chairman, Board of Selectmen 11 Lincoln Street Plymouth, Massachusetts 02360 Office of the Commissioner Massachusetts Department of 1
Environmental Ouality Engineering One Winter Street Boston, Massachusetts 02108 Office of the Attorney General 1 Ashburton Place 19th Floor Boston, Massachusetts 02108 Mr. Robert M. Hallisey, Director Radiation Control Program Massachusetts Department of Public Health 150 Tremont Street, 2nd Floor Boston, Massachusetts 02111 Regional Administrator, Region I U. S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, Pennsylvania 19406 Mr. James D. Keyes Boston Edison Company 25 Braintree Hill Office Park Braintree, Massachusetts 02184 l