Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20215L804 + (02:38:08, 4 December 2024)
- ML20215L800 + (02:38:09, 4 December 2024)
- ML20215L799 + (02:38:10, 4 December 2024)
- ML20215L793 + (02:38:13, 4 December 2024)
- ML20215L795 + (02:38:13, 4 December 2024)
- ML20215L792 + (02:38:14, 4 December 2024)
- ML20215L790 + (02:38:15, 4 December 2024)
- ST-HL-AE-2145, Provides Updated Schedule for Resolving Deficiency Items Listed in Emergency Preparedness Appraisal Insp Rept. Comprehensive Training Program of Emergency Response Personnel Will Be Complete Before Full Power OL + (02:38:16, 4 December 2024)
- ML20215L788 + (02:38:16, 4 December 2024)
- ML20215L783 + (02:38:17, 4 December 2024)
- ML20215L786 + (02:38:17, 4 December 2024)
- ML20215L782 + (02:38:18, 4 December 2024)
- ML20215L781 + (02:38:19, 4 December 2024)
- ML20215L780 + (02:38:19, 4 December 2024)
- ML20215L779 + (02:38:20, 4 December 2024)
- TXX-6430, Part 21 & Interim Deficiency Rept CP-87-05 Re Failure of High Range Radiation Monitor Coaxial Cables to Meet Min Environ Qualification for Dielectric Insulation Requirement. Initially Reported on 870406.Next Rept Expected by 870721 + (02:38:21, 4 December 2024)
- ST-HL-AE-2131, Forwards Annotated Rev to FSAR Section 11.2 Re Hydrostatic Testing of Liquid Waste Mgt Sys & Compliance W/Nrc Branch Technical Position Etsb 11-1.Changes Revise FSAR to Be Consistent W/Project Requirements for Sys + (02:38:21, 4 December 2024)
- ML20215L775 + (02:38:22, 4 December 2024)
- ML20215L774 + (02:38:22, 4 December 2024)
- ML20215L772 + (02:38:23, 4 December 2024)
- ML20215L766 + (02:38:25, 4 December 2024)
- ML20215L767 + (02:38:25, 4 December 2024)
- ML20215L765 + (02:38:26, 4 December 2024)
- TXX-6402, Revised Response to Violation Item B Noted in Insp Repts 50-445/85-18 & 50-446/85-15.Corrective Steps Taken & Action to Prevent Recurrence Sections Updated to Show Results Achieved.Dates of Full Compliance Moved to 870831 & 880331 + (02:38:27, 4 December 2024)
- ML20215L762 + (02:38:27, 4 December 2024)
- 05000277/LER-1987-004-02, :on 870407,primary Containment Isolations Occurred.Caused by Partial Loss of Offsite Power Due to Buildup of Snow on Power Lines & Contact W/Trees.Trees Near 220-kV Lines Trimmed + (02:38:29, 4 December 2024)
- ML20215L759 + (02:38:30, 4 December 2024)
- ML20215L757 + (02:38:31, 4 December 2024)
- ML20215L758 + (02:38:31, 4 December 2024)
- ML20215L756 + (02:38:32, 4 December 2024)
- ML20215L751 + (02:38:33, 4 December 2024)
- ML20215L748 + (02:38:34, 4 December 2024)
- ML20215L749 + (02:38:34, 4 December 2024)
- ST-HL-AE-2268, Responds to NRC Re Open Items Noted in Insp Repts 50-498/87-08 & 50-499/87-08.Operation Procedure 0PGP03-Z0-0003 Revised to Cause Reviewers to Ensure That Previous License Compliance Evaluation Performed + (02:38:35, 4 December 2024)
- ST-HL-AE-2032, Provides Addl Info Re Insp of Pressurizer Safety Relief Valves,Per NRC Request.Safety Relief Valves Will Be Inspected After Each Lift Involving Loop Seal or Water Discharge,Under Procedure OPMP04-RC-0024 + (02:38:35, 4 December 2024)
- ML20215L744 + (02:38:36, 4 December 2024)
- ML20215L740 + (02:38:37, 4 December 2024)
- ML20215L741 + (02:38:37, 4 December 2024)
- ML20215L739 + (02:38:38, 4 December 2024)
- ML20215L735 + (02:38:39, 4 December 2024)
- ML20215L737 + (02:38:39, 4 December 2024)
- TXX-6437, Interim Deficiency Rept CP-86-37 Re Firing Board Assemblies & Amplifier Boards in Battery Chargers That Do Not Conform to Vendor Assembly Drawings.Initially Reported on 870514.Review Continuing.Next Rept Expected by 870626 + (02:38:40, 4 December 2024)
- ML20215L732 + (02:38:41, 4 December 2024)
- ML20215L731 + (02:38:41, 4 December 2024)
- ML20215L728 + (02:38:42, 4 December 2024)
- ML20215L726 + (02:38:43, 4 December 2024)
- ML20215L723 + (02:38:44, 4 December 2024)
- ML20215L724 + (02:38:44, 4 December 2024)
- ML20215L722 + (02:38:45, 4 December 2024)
- ML20215L719 + (02:38:46, 4 December 2024)
- ST-HL-AE-2157, Advises That Category I Structures Completed.Const Dewatering of Plant Areas Terminated in Jan 1987.Monitoring of Groundwater Levels Will Continue Using Permanent Piezometer Sys + (02:38:46, 4 December 2024)