Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20216C029 + (01:58:12, 4 December 2024)
- ML20216C027 + (01:58:13, 4 December 2024)
- ML20216C028 + (01:58:13, 4 December 2024)
- 05000334/LER-1998-012, :on 980204,discovered That Capacitors Could Not Be Gauranteed to Withstand Consequences.Caused by Inadequate Implementation of Vendor Instructions.Filled Voids Between Capacitors & Circuit Boards W/Silicon Rubber + (01:58:15, 4 December 2024)
- U-602927, Updates on Status of Plans for Refurbishment & Maintenance of ABB 480-volt K-Line Circuit Breakers,Ge 4160-volt Magne- Blast Circuit Breakers & W 4160-volt & 6900-volt Dhp Circuit Breakers + (01:58:16, 4 December 2024)
- ML20216C022 + (01:58:19, 4 December 2024)
- ML20216C020 + (01:58:20, 4 December 2024)
- ML20216C019 + (01:58:20, 4 December 2024)
- B16672, Provides Response to Second Request for Addl Info Re Third 10-year Interval ISI Program Plan as Requested by 970611 NRC Ltr.Listed Commitments Contained in Ltr + (01:58:21, 4 December 2024)
- ML20216C013 + (01:58:22, 4 December 2024)
- RC-98-0075, Forwards Summary of Present Levels of Property Insurance & Cash Flow Statement for Virgil C Summer Nuclear Station,Per 10CFR50.54(w) & 10CFR140.21(e) Rept + (01:58:22, 4 December 2024)
- ML20216C011 + (01:58:23, 4 December 2024)
- ML20216C012 + (01:58:23, 4 December 2024)
- ML20216C010 + (01:58:24, 4 December 2024)
- PNO-II-97-051, on 970906,McGuire Units 1 & 2 Automatically Tripped.Porvs Utilized Until Steam Dumps Could Be Made Available.Steam Relieved Through Main Steam PORVs Until Power to Bus Kxa Restored & MSIVs Reopened + (01:58:25, 4 December 2024)
- ML20216C007 + (01:58:25, 4 December 2024)
- ML20216C005 + (01:58:26, 4 December 2024)
- ML20216C004 + (01:58:27, 4 December 2024)
- 05000361/LER-1998-005, :on 980305,inadequate Voltage to 120 Vac Circuits Due to Calculation Error Occurred.Caused by Personnel Error.Sys Mods Made to Affected Sys to Correct Deficiencies + (01:58:29, 4 December 2024)
- ML20216C001 + (01:58:29, 4 December 2024)
- ML20216C000 + (01:58:30, 4 December 2024)
- ML20216B999 + (01:58:30, 4 December 2024)
- ML20216B998 + (01:58:31, 4 December 2024)
- ML20216B996 + (01:58:33, 4 December 2024)
- ML20216B995 + (01:58:33, 4 December 2024)
- ML20216B992 + (01:58:34, 4 December 2024)
- 05000361/LER-1998-008, :on 980306,4160 Vac Supply Cable Exceeded Ampacity Rating.Caused by Error in Feeder Cable Sizing Calculation Completed by Plant Architect/Engineer. Administrative Restrictions Imposed + (01:58:36, 4 December 2024)
- ML20216B990 + (01:58:36, 4 December 2024)
- 0CAN049801, Responds to Violations Noted in Insp Repts 50-313/98-02 & 50-368/98-02.Corrective Actions:Removed Jumpers,Reviewed Calibr Performed by Night Shift Technicians,Revoked RPS Qualifications for Night Shift Technicians & Reviewed Event + (01:58:37, 4 December 2024)
- ML20216B986 + (01:58:38, 4 December 2024)
- ML20216B985 + (01:58:38, 4 December 2024)
- ML20216B984 + (01:58:39, 4 December 2024)
- ML20216B983 + (01:58:41, 4 December 2024)
- ML20216B982 + (01:58:41, 4 December 2024)
- ML20216B975 + (01:58:42, 4 December 2024)
- ML20216B976 + (01:58:42, 4 December 2024)
- ML20216B973 + (01:58:43, 4 December 2024)
- ML20216B972 + (01:58:44, 4 December 2024)
- ML20216B969 + (01:58:44, 4 December 2024)
- ML20216B968 + (01:58:45, 4 December 2024)
- ML20216B967 + (01:58:46, 4 December 2024)
- ML20216B953 + (01:58:52, 4 December 2024)
- ML20216B957 + (01:58:52, 4 December 2024)
- ML20216B950 + (01:58:53, 4 December 2024)
- IR 05000409/1998001 + (01:58:55, 4 December 2024)
- ML20216B946 + (01:58:55, 4 December 2024)
- ML20216B944 + (01:58:56, 4 December 2024)
- ML20216B941 + (01:58:58, 4 December 2024)
- ML20216B940 + (01:59:02, 4 December 2024)
- ML20216B938 + (01:59:03, 4 December 2024)
- ML20216B934 + (01:59:04, 4 December 2024)
- ML20216B931 + (01:59:05, 4 December 2024)