Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19330B515 + (10:07:39, 31 December 2024)
- ML19330B511 + (10:07:41, 31 December 2024)
- ML19330B510 + (10:07:42, 31 December 2024)
- ML19330B509 + (10:07:43, 31 December 2024)
- ML19330B508 + (10:07:44, 31 December 2024)
- ML19330B505 + (10:07:45, 31 December 2024)
- ML19330B506 + (10:07:45, 31 December 2024)
- 05000321/LER-1980-079-03, /03L-0:on 800702,during Review of Smoke Detection Surveillance Procedures,Discovered That Smoke Detectors for Seven Plant Areas Had Not Been Included in Procedure Data Sheet.Caused by Oversight.Procedure Revised + (10:07:47, 31 December 2024)
- ML19330B503 + (10:07:48, 31 December 2024)
- 05000321/LER-1980-079, Forwards LER 80-079/03L-0 + (10:07:52, 31 December 2024)
- ML19330B500 + (10:07:54, 31 December 2024)
- ML19330B498 + (10:07:55, 31 December 2024)
- ML19330B499 + (10:07:55, 31 December 2024)
- ML19330B497 + (10:07:56, 31 December 2024)
- ML19330B496 + (10:07:57, 31 December 2024)
- ML19330B495 + (10:07:58, 31 December 2024)
- ML19330B494 + (10:07:59, 31 December 2024)
- ML19330B493 + (10:08:00, 31 December 2024)
- ML19330B492 + (10:08:01, 31 December 2024)
- ML19330B491 + (10:08:02, 31 December 2024)
- ML19330B490 + (10:08:03, 31 December 2024)
- ML19330B489 + (10:08:04, 31 December 2024)
- ML19330B488 + (10:08:05, 31 December 2024)
- ML19330B487 + (10:08:06, 31 December 2024)
- ML19330B486 + (10:08:06, 31 December 2024)
- ML19330B485 + (10:08:07, 31 December 2024)
- ML19330B484 + (10:08:08, 31 December 2024)
- ML19330B483 + (10:08:10, 31 December 2024)
- ML19330B482 + (10:08:13, 31 December 2024)
- ML19330B481 + (10:08:14, 31 December 2024)
- ML19330B480 + (10:08:16, 31 December 2024)
- ML19330B479 + (10:08:17, 31 December 2024)
- ML19330B477 + (10:08:18, 31 December 2024)
- 05000293/LER-1980-029-01, /01T-0:on 800716,reactor Pressure Boundary Leak Detector Monitor C-19 Found Inoperable.Caused by Inadvertent Isolation Due to Failure Position Indication.Requirements for Containment Atmospheric Sampling Will Be Reviewed + (10:08:20, 31 December 2024)
- ML19330B475 + (10:08:21, 31 December 2024)
- 05000293/LER-1980-029, Forwards LER 80-029/0IT-0 + (10:08:22, 31 December 2024)
- 05000293/LER-1980-030-03, /03L-0:on 800725,relief Valve 203-3D Did Not Respond When Control Switch Was Placed to Open Position at Reactor Pressure of 970 Psig.Caused by Locktite Dripping Along Face of Plunger,Binding Plunger & Bonnet Together + (10:08:27, 31 December 2024)
- ML19330B471 + (10:08:28, 31 December 2024)
- 05000293/LER-1980-030, Forwards LER 80-030/03L-0 + (10:08:29, 31 December 2024)
- ML19330B468 + (10:08:30, 31 December 2024)
- 05000306/LER-1980-020-01, /01T-0:on 800715,during Severe Electrical Storm Several Breakers Operated.Main Generator Was Separated from Grid & Reactor & Reactor Coolant Pumps Tripped.Caused by Electrical Storm.Next Day Conditions Returned to Normal + (10:08:32, 31 December 2024)
- ML19330B464 + (10:08:33, 31 December 2024)
- ML19330B465 + (10:08:33, 31 December 2024)
- ML19330B463 + (10:08:34, 31 December 2024)
- 05000306/LER-1980-020, Forwards LER 80-020/01T-0 + (10:08:35, 31 December 2024)
- AECM-80-156, Forwards Amend 41 to Application for OL Consisting of Amend 41 to FSAR + (10:08:36, 31 December 2024)
- ML19330B458 + (10:08:38, 31 December 2024)
- ML19330B457 + (10:08:40, 31 December 2024)
- ML19330B456 + (10:08:41, 31 December 2024)
- ML19330B455 + (10:08:41, 31 December 2024)
- ML19330B454 + (10:08:42, 31 December 2024)