Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19331C797 + (08:54:54, 31 December 2024)
- ML19331C796 + (08:54:55, 31 December 2024)
- ML19331C795 + (08:54:56, 31 December 2024)
- 05000213/LER-1980-011, Forwards LER 80-011/03L-0 + (08:54:57, 31 December 2024)
- ML19331C792 + (08:54:58, 31 December 2024)
- 05000278/LER-1980-011-03, /03L-0:on 800516,during Power Operation,Instrument Surveillance Test Revealed Setpoint for Pressure Switch 3-2-128B at 33 Psi Above Tech Spec.Caused by Barksdale Model PIH-M8555-V Pressure Switch Setpoint Drift + (08:55:02, 31 December 2024)
- ML19331C788 + (08:55:05, 31 December 2024)
- ML19331C787 + (08:55:06, 31 December 2024)
- ML19331C784 + (08:55:07, 31 December 2024)
- ML19331C785 + (08:55:07, 31 December 2024)
- ML19331C783 + (08:55:08, 31 December 2024)
- ML19331C782 + (08:55:09, 31 December 2024)
- 05000278/LER-1980-012-03, /03L-0:on 800520,during Full Power Operation, Routine Testing Revealed Pressure Switch 5121B Setpoint at 700 Psi Above Tech Spec.Caused by Personnel Error.Setpoint Adjusted.Technician Instructed + (08:55:11, 31 December 2024)
- TAC:11259 + (08:55:12, 31 December 2024)
- ML19331C780 + (08:55:13, 31 December 2024)
- 05000336/LER-1980-026-01, /01T-0:on 800729,plugged Yard Storm Drain Caused Rainwater Backup & Leakage of 18 Inches in Lower Level of Auxiliary Bldg.Caused by Faulty Water Seals for Piping Penetrations Into Refueling Water Storage Tank Tunnel + (08:55:17, 31 December 2024)
- 05000327/LER-1980-131-03, /03L-0:on 800626,review of SI 137.1 Test Data Revealed Surveillance Requirement 4.4.6.2.b Not Performed within Prescribed Interval.Caused by Personnel Oversight. Addl Personnel Made Available as Necessary + (08:55:19, 31 December 2024)
- 05000289/LER-1980-015-04, /04T-0:on 800721,while Units Were in Cold Shutdown Condition,Actual River Water Temp Exceeded Tech Spec Limits for 6-h.Caused by Inaccurate Compensation for Resistance Temp Detector Lead Resistance During Calibr + (08:55:21, 31 December 2024)
- 05000327/LER-1980-123-03, /03L-0:on 800716,shield Bldg Vent Radiation monitor,1-RM-90-100R,declared Inoperable When Count Rate Found Out of Tolerance.Caused by Defective Photomultiplier Tube & Scintillator Detector Assembly.Parts Replaced + (08:55:24, 31 December 2024)
- 05000327/LER-1980-135-03, /03L-0:on 800711,ice Condenser Inlet Doors Opened Due to Differential Pressure Created by Both Lower Compartment Doors Being Open Simultaneously.Caused by Design/Mfg Problem.Design Change Request Submitted + (08:55:26, 31 December 2024)
- 05000336/LER-1980-026, Forwards LER 80-026/01T-0 + (08:55:28, 31 December 2024)
- 05000289/LER-1980-015, Forwards LER 80-015/04T-0 + (08:55:29, 31 December 2024)
- 05000327/LER-1980-123, Forwards LER 80-123/03L-0 + (08:55:32, 31 December 2024)
- 05000327/LER-1980-134-03, /03L-0:on 800705,while in Mode 3,lower Compartment Weighted Average Temp Found to Exceed Limit.Caused by Failure of One of Lower Compartment Door Latches to Hold Insp Door Closed.Latch Repaired + (08:55:33, 31 December 2024)
- 05000277/LER-1980-012-01, /01T-0:on 800721,during Operational Hydro,Scram Discharge Vol Vent & Drain Valves Failed to Operate. Investigation Indicated at Least One Vent & Drain Solenoid & Both Backup Scram Solenoids Failed + (08:55:35, 31 December 2024)
- ML19331C766 + (08:55:36, 31 December 2024)
- 05000327/LER-1980-127-03, /03L-0:on 800630,during Review of SI-137.1 Test Data,Surveillance Requirement 4.4.6.2.b Found Not Performed within Prescribed Interval.Caused by Personnel Error.Reactor Operator Assigned to SI Performance + (08:55:38, 31 December 2024)
- 05000325/LER-1980-060-03, /03L-0:on 800715,1B Core Spray Discharge Pressure Transmitter Determined Out of Calibr.Caused by Instrument Drift.Calibr Period Revised to six-month Frequency to re-establish Instrument Reliability + (08:55:39, 31 December 2024)
- ML19331C763 + (08:55:41, 31 December 2024)
- 05000327/LER-1980-127, Forwards LER 80-127/03L-0 + (08:55:42, 31 December 2024)
- 05000327/LER-1980-128-03, /03L-0:on 800701,during Preoperational Testing, Boron Injection Tank Concentration Found Out of Spec.Cause Under Investigation.Proper Concentration Restored + (08:55:43, 31 December 2024)
- 05000277/LER-1980-012, Forwards LER 80-012/01T-0 + (08:55:45, 31 December 2024)
- ML19331C756 + (08:55:46, 31 December 2024)
- ML19331C755 + (08:55:48, 31 December 2024)
- ML19331C754 + (08:55:48, 31 December 2024)
- 05000155/LER-1980-019-03, /03L-0:on 800713,visual Alarm Noted on Containment Pressure Indicator on Unit Pis 173 in Control Room.Cause Not Repetitive.Investigation Revealed Defective Electronic Components in Unit + (08:55:50, 31 December 2024)
- ML19331C748 + (08:55:51, 31 December 2024)
- ML19331C750 + (08:55:51, 31 December 2024)
- ML19331C745 + (08:55:52, 31 December 2024)
- ML19331C746 + (08:55:52, 31 December 2024)
- ML19331C744 + (08:55:53, 31 December 2024)
- ML19331C743 + (08:55:54, 31 December 2024)
- 05000289/LER-1980-014-03, /03L-0:on 800715,during Insp,Snubber NSE-151 Had Low Fluid Level & Failed Functional Test.Possibly Caused by Leakage Past Seal Damaged During Installation.Seals Replaced & Snubber Passed Functional Test + (08:55:55, 31 December 2024)
- ML19331C741 + (08:55:56, 31 December 2024)
- ML19331C740 + (08:55:57, 31 December 2024)
- ML19331C739 + (08:55:57, 31 December 2024)
- BSEP-80-1349, Ack Receipt of IE Insp Repts 50-324/80-18 & 50-325/80-21.No Proprietary Info.Corrective Actions:Seventeen Spare Leads Immediately Terminated Per Approved Maint Instructions & Drawings + (08:55:58, 31 December 2024)
- 05000289/LER-1980-014, Forwards LER 80-014/03L-0 + (08:56:00, 31 December 2024)
- ML19331C735 + (08:56:01, 31 December 2024)
- AECM-80-180, Forwards Affidavit of Svc on Distribution of Amend 41 to Application for Licenses in Matter of Fsar,Per NRC + (08:56:03, 31 December 2024)
- ML19331C734 + (08:56:03, 31 December 2024)