Revision to Monthly Operating Rept for June 1980
ML19331C792
Person / Time
Site: Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png
Issue date: 08/05/1980
From:
CONNECTICUT YANKEE ATOMIC POWER CO.
To:
Shared Package
ML19331C786 List:
References
NUDOCS 8008190555
Download: ML19331C792 (2)


Text

m w

// JuD 000L011111

// XEQ B03 FX

.. _. _ _. *****tlRC OPERATitG_ STATUS _ REPORT _C0f1PLETED BY ltEACTOR Efflit1EERINS*****

9 IIullT illeIE....CD 4rl.' YN4KEE ATO:4f C PGJER Co.

~ ~'

~ ~ ~ ~ ~

~~~

~ ' - ~ ' DOCKET !!O.

50-213

~"

4 nEi"sRTitiG Etl00.... June 1980 UATE Aunust 5. 19S0 y :.,

f./;';H.ATL iMTI!M(6f)SS :'mE)... 60J.3 CD::PLETED BY..Rmtcr Eng.

3.

LICEt4CJ TillatAL PU. 04(.r.4T)...1325 TELCH!O' E-(203) N7-25%

3, delG: LLECTdICAL RATI:1G04 ET.4.E )... 5 30 REVISIO!: 1 O

y,,,,s ;,W I. u s JE ht.JA':LE CAPACI TY (di ES f4;E )... 57 7_

C 7.

II/J,l.b! REPE!JJACLE CAPACITf CJET 1JE)... 550 o.

IF cilAtuEb ucCUR lti CAPACITY RATitiGS(ITE:43 3 TilROUGI 7)SI!1C( LAST REPORT, GIVE REAS0 tis....N/A g

>=4 9.

PD..Lt LEVEL To tallCH RESTitlCTED.

I F NiY(N ET' !f.!E )..'..None

~

~~

~

~

g 10.

REA%:: l'ud nESTalCTl0!1 IF HlY....N/A g

_.... Tills ItEPORTit!G PEltl0D _

YR. TO DATE.

CU ULATIVE TO DATE 11.

10U4 !!! REPORTit:G PERIOD 720.0

,..t.3G7.0 10955').0

  • 14.

I: M.,ER OF IUU4 Tile REACTOR 1AS CRITICAL 0.0 2057.1' Sr.153. 3 15.

REACTOR RESE NE SliUTuutt: Il0 Ult 3

'"~

[

0.0

' ~

~ ~ ~ " '

11. f.

11G4.0

  • 14.

_ IOURS LEl.EetATait 0:4 LitlE

_ 0. 0.__..

2947.7 89*,S7.0

  • 15.

UtilT RE' DWE LiluTDual IUUlls 0.0 0.0 3E9.9 lo.

GicLS ThEd.ML El.ERGY GEliEltATED 04tH)

O.

5090070 155231219.

17.

C,c)3S ELECTRICAL EtERGY GEtlERATED. 04Al) 0.

1692421.,, _

510!.GSS7 14.

f.ET ELECTdICAL Er;E!(GY GE:ERATED (:ul)

-19G8.

1609319.

ta5G4032.

l').

Utili dLtVICE FACTUR

~ ~ - '

O.0

' ~ ~ ~ ~ ~ ~ ~ ' ' ~ "

52.0

  • G7.5 eJ.

UllT AVAlLABILITY FACTOR 0.0 G 7.5 d2.4

  • 21.-

U;lT CAPACITY FACTOR (USitG !!DC 'ilET) 0.0 07.0 42.0

  • 22.

G.lT CAPACITY FACTOR (US!!1G DER flET) 0.0 63.5 75.C

  • J3.

t.;f;iT F0rtCED OUTAGE RATE 0.0__.___._,___.

_ _ _ 0. 5 _. __. _.

7.1

  • 2:..

StuTuo.sts SolEDULED OVER fiEXT G tUlTitS(TYPE,DATE Atl3 DURAT!0tl UF'EACH)....Co itinuation of Core 10 Refueling, started >Liy 3.1980

. approximately 8 to 12 weeks.

25.

IF 0 A;.23 AT Era DF llEPORTifU PCR100, ESTI. STATE 9 UATE OF STARTtJP....Jul'y 14. 1980 Ju.-~ U;lTS lil TEST STATdS(P.tl0R TO CO:itERCI AL OPERATl0tl)....!10T N'PLICABLE' ~ ~ ~

~

+58tlCE UATE OF Cu;f1ERCI AL UPERATioti 1-1-GS Y

1 REFUE1.ING INFORMATION REQUEST t

1.

Name of facility Connecticut Yankee Atomic Power Company 2.

e:heduled date for next refueling shutdown.

September / October 1981 3.

Scheduled date for restart following refueling Approximately six to eight weeks.

4.

(a) Will refueling sr tesumption of opcration thercafter require a l

technical specification change or other license amendment?

No technical specification changes are anticipated at this time.

4 (b) If answer is yes, what, in general, w311 these be?

l N/A (c)

Tf answer is no, has the reload fuel design and core configuration been j

reviewed by your Plant Safcty Review Committee to determine whether any unreviewed safety questions are associated with the core reload (Ref. 10 CFR Section 50.59)?

When the above stated documents are received from the fuel vendor they will be reviewed in accordance with 10CFR50.59 to determine if any unreviewed safety questions are associated with the Core reload.

(d) If no such review has taken place, when is it schedcled?

1 N/A 5.

Scheduled date(s) for submitting proposed 11ccnsing action and supporting information.

There are no scheduled dates because of (4) above.

6.

Important licensing considerations associated with refueling, e.g., new 'r o

different fuel design or supplier, unreviewed design or performance. analysis methods, significant changes in fuel design, new operating procedures.

None 7.

The number of fuel assemblics (a) in the core and (b) in the spent fuel storage pool.

(a) 157 (b) 389 8.

The present licensed spent fuel pool storage capacity and the size of any increase in licensed storar,c capacity that has been requessed or is planned, in number of fuel assemblies.

1168 9.

The projected date of the last refueling that can be discharged to the spent fuel pool assuming the prest.it licensed capacity.