MONTHYEARBVY-99-127, Monthly Operating Rept for Sept 1999 for Vermont Yankee Nuclear Power Station.With1999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Vermont Yankee Nuclear Power Station.With BVY-99-112, Monthly Operating Rept for Aug 1999 for Vermont Yankee.With1999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Vermont Yankee.With BVY-99-102, Monthly Operating Rept for July 1999 for Vermont Yankee. with1999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Vermont Yankee. with BVY-99-090, Monthly Operating Rept for June 1999 for Vermont Yankee Nuclear Power Station.With1999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Vermont Yankee Nuclear Power Station.With BVY-99-077, Monthly Operating Rept for May 1999 for Vermont Yankee Nuclear Power Station.With1999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Vermont Yankee Nuclear Power Station.With BVY-99-068, Monthly Operating Rept for Apr 1999 for Vynp.With1999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Vynp.With BVY-99-046, Monthly Operating Rept for Mar 1999 for Vermont Yankee Nuclear Power Station.With1999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Vermont Yankee Nuclear Power Station.With BVY-99-035, Monthly Operating Rept for Feb 1999 for Vermont Yankee Nuclear Station.With1999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Vermont Yankee Nuclear Station.With BVY-99-001, Monthly Operating Rept for Dec 1998 for Vermont Yankee Nuclear Power Station1998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Vermont Yankee Nuclear Power Station BVY-98-163, Monthly Operating Rept for Nov 1998 for Vermont Yankee Nuclear Power Station.With1998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Vermont Yankee Nuclear Power Station.With BVY-98-154, Monthly Operating Rept for Oct 1998 for Vermont Yankee Nuclear Power Station.With1998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Vermont Yankee Nuclear Power Station.With BVY-98-149, Monthly Operating Rept for Sept 1998 for Vermont Yankee Nuclear Power Station.With1998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Vermont Yankee Nuclear Power Station.With BVY-98-135, Monthly Operating Rept for Aug 1998 for Vermont Yankee Nuclear Power Station.With1998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Vermont Yankee Nuclear Power Station.With BVY-98-122, Monthly Operating Rept for July 1998 for Vermont Yankee Nuclear Power Station1998-07-31031 July 1998 Monthly Operating Rept for July 1998 for Vermont Yankee Nuclear Power Station BVY-98-098, Monthly Operating Rept for June 1998 for Vermont Yankee Nuclear Power Station1998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Vermont Yankee Nuclear Power Station BVY-98-081, Monthly Operating Rept for May 1998 for Vermont Yankee Nuclear Power Station1998-05-31031 May 1998 Monthly Operating Rept for May 1998 for Vermont Yankee Nuclear Power Station BVY-98-068, Monthly Operating Rept for Apr 1998 for Vermont Yankee Nuclear Power Station1998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for Vermont Yankee Nuclear Power Station BVY-98-053, Monthly Statistical Rept for Mar 1998 for Vynp1998-03-31031 March 1998 Monthly Statistical Rept for Mar 1998 for Vynp ML20248L1581998-02-28028 February 1998 Monthly Operating Rept for Feb 1998 for Vermont Yankee Nuclear Power Station ML20217M7801998-01-31031 January 1998 Monthly Operating Rept for Jan 1998 for Vynp Station ML20198L6111997-12-31031 December 1997 Monthly Operating Rept for Dec 1997 for Vynp Station BVY-97-161, Monthly Operating Rept for Nov 1997 for Vermont Yankee Nuclear Power Station1997-11-30030 November 1997 Monthly Operating Rept for Nov 1997 for Vermont Yankee Nuclear Power Station BVY-97-145, Monthly Operating Rept for Oct 1997 for Vermont Yankee Nuclear Power Station1997-10-31031 October 1997 Monthly Operating Rept for Oct 1997 for Vermont Yankee Nuclear Power Station BVY-97-126, Monthly Operating Rept for Sept 1997 for Vermont Yankee Nuclear Power Station1997-09-30030 September 1997 Monthly Operating Rept for Sept 1997 for Vermont Yankee Nuclear Power Station BVY-97-111, Monthly Operating Rept for Aug 1997 for Vermont Yankee Nuclear Power Station1997-08-31031 August 1997 Monthly Operating Rept for Aug 1997 for Vermont Yankee Nuclear Power Station BVY-97-098, Monthly Operating Rept for Jul 1997 for Vermont Yankee Nuclear Power Station1997-07-31031 July 1997 Monthly Operating Rept for Jul 1997 for Vermont Yankee Nuclear Power Station BVY-97-088, Monthly Operating Rept for June 1997 for Nynps1997-06-30030 June 1997 Monthly Operating Rept for June 1997 for Nynps BVY-97-074, Monthly Operating Rept for May 1997 for Vermont Yankee Nuclear Power Station1997-05-31031 May 1997 Monthly Operating Rept for May 1997 for Vermont Yankee Nuclear Power Station BVY-97-059, Monthly Operating Rept for Apr 1997 for Vermont Yankee Nuclear Station1997-04-30030 April 1997 Monthly Operating Rept for Apr 1997 for Vermont Yankee Nuclear Station BVY-97-042, Monthly Operating Rept for Mar 1997 for Vermont Yankee Nuclear Power Station1997-03-31031 March 1997 Monthly Operating Rept for Mar 1997 for Vermont Yankee Nuclear Power Station BVY-97-033, Monthly Operating Rept for Feb 1997 for Vermont Yankee Power Station1997-02-28028 February 1997 Monthly Operating Rept for Feb 1997 for Vermont Yankee Power Station BVY-97-021, Monthly Operating Rept for Jan 1997 for VYNPS1997-01-31031 January 1997 Monthly Operating Rept for Jan 1997 for VYNPS BVY-97-001, Monthly Operating Rept for Dec 1996 for Vermont Yankee Nuclear Power Station1996-12-31031 December 1996 Monthly Operating Rept for Dec 1996 for Vermont Yankee Nuclear Power Station BVY-96-154, Monthly Operating Rept for Nov 1996 for Vermont Yankee Nuclear Power Station1996-11-30030 November 1996 Monthly Operating Rept for Nov 1996 for Vermont Yankee Nuclear Power Station BVY-96-138, Monthly Operating Rept for Oct 1996 for Vermont Yankee Nuclear Power Station1996-10-31031 October 1996 Monthly Operating Rept for Oct 1996 for Vermont Yankee Nuclear Power Station BVY-96-114, Monthly Operating Rept for Sept 1996 for Vynp1996-09-30030 September 1996 Monthly Operating Rept for Sept 1996 for Vynp BVY-96-103, Monthly Operating Rept for Aug 1996 for Vermont Yankee Nuclear Power Station1996-08-31031 August 1996 Monthly Operating Rept for Aug 1996 for Vermont Yankee Nuclear Power Station BVY-96-095, Monthly Operating Rept for July 1996 for VT Yankee Nuclear Power Station1996-07-31031 July 1996 Monthly Operating Rept for July 1996 for VT Yankee Nuclear Power Station BVY-96-087, Monthly Operating Rept for June 1996 for Vermont Yankee Nuclear Power Station1996-06-30030 June 1996 Monthly Operating Rept for June 1996 for Vermont Yankee Nuclear Power Station BVY-96-072, Monthly Operating Rept for May 1996 for Vermont Yankee Nuclear Power Station1996-05-31031 May 1996 Monthly Operating Rept for May 1996 for Vermont Yankee Nuclear Power Station BVY-96-057, Monthly Operating Rept for Apr 1996 for VT Yankee Power Station1996-04-30030 April 1996 Monthly Operating Rept for Apr 1996 for VT Yankee Power Station BVY-96-041, Monthly Operating Rept for Mar 1996 for Vynp1996-03-31031 March 1996 Monthly Operating Rept for Mar 1996 for Vynp BVY-96-018, Monthly Statistical Rept for Feb 1996 for VT Yankee Nuclear Power Station1996-02-29029 February 1996 Monthly Statistical Rept for Feb 1996 for VT Yankee Nuclear Power Station BVY-96-009, Monthly Operating Rept for Jan 1996 for Vermont Yankee Nuclear Power Station1996-01-31031 January 1996 Monthly Operating Rept for Jan 1996 for Vermont Yankee Nuclear Power Station BVY-96-001, Monthly Operating Rept for Dec 1995 for Vermont Yankee Nuclear Power Station1995-12-31031 December 1995 Monthly Operating Rept for Dec 1995 for Vermont Yankee Nuclear Power Station ML20095F6601995-11-30030 November 1995 Last Page of Monthly Operating Rept for Nov 1995 for Vermont Yankee BVY-95-131, Monthly Operating Rept for Nov 1995 for Vermont Yankee Nuclear Power Station1995-11-30030 November 1995 Monthly Operating Rept for Nov 1995 for Vermont Yankee Nuclear Power Station BVY-95-118, Monthly Operating Rept for Oct 1995 for Vynp1995-10-31031 October 1995 Monthly Operating Rept for Oct 1995 for Vynp BVY-95-106, Monthly Operating Rept for Sept 1995 for Vynp1995-09-30030 September 1995 Monthly Operating Rept for Sept 1995 for Vynp ML20092F5901995-08-31031 August 1995 Monthly Operating Rept for Aug 1995 for Vermont Yankee Nuclear Station 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217L8831999-10-21021 October 1999 Safety Evaluation Supporting Proposed Alternatives to Code Requirements Described in RR-V17 & RR-V18 ML20217G2041999-10-13013 October 1999 Safety Evaluation Supporting Amend 179 to License DPR-28 BVY-99-127, Monthly Operating Rept for Sept 1999 for Vermont Yankee Nuclear Power Station.With1999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Vermont Yankee Nuclear Power Station.With ML20212C2551999-09-17017 September 1999 Safety Evaluation Supporting Amend 175 to License DPR-28 BVY-99-112, Monthly Operating Rept for Aug 1999 for Vermont Yankee.With1999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Vermont Yankee.With BVY-99-109, Ro:On 990812,stack Ng Effluent Instrumentation for PAM Was Declared Oos.Caused by Instrument Drift Due to Electronic Components Based on Insps by Instrumentation & Controls Dept.Detector & Preamplifier Will Be Replaced on 9908311999-08-19019 August 1999 Ro:On 990812,stack Ng Effluent Instrumentation for PAM Was Declared Oos.Caused by Instrument Drift Due to Electronic Components Based on Insps by Instrumentation & Controls Dept.Detector & Preamplifier Will Be Replaced on 990831 BVY-99-102, Monthly Operating Rept for July 1999 for Vermont Yankee. with1999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Vermont Yankee. with ML20209J0081999-07-14014 July 1999 Special Rept:On 990615,diesel Driven Fire Pump Failed to Achieve Rated Flow of 2500 Gallons Per Minute.Pump Was Inoperable for Greater than 7 Days.Corrective Maint Was Performed to Reset Pump Lift Setting BVY-99-090, Monthly Operating Rept for June 1999 for Vermont Yankee Nuclear Power Station.With1999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Vermont Yankee Nuclear Power Station.With ML20196G5071999-06-23023 June 1999 Vynp Assessment of On-Site Disposal of Contaminated Soil by Land Spreading BVY-99-077, Monthly Operating Rept for May 1999 for Vermont Yankee Nuclear Power Station.With1999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Vermont Yankee Nuclear Power Station.With BVY-99-068, Monthly Operating Rept for Apr 1999 for Vynp.With1999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Vynp.With ML20206E8741999-04-29029 April 1999 SER Determined That Flaw Evaluation Meets Rules of ASME Code & Assumed Crack Growth Rate Adequate for Application ML20206D9301999-04-27027 April 1999 1999 Emergency Preparedness Exercise 990427 Exercise Manual (Plume Portion) ML20205S4211999-04-16016 April 1999 Non-proprietary Version of Revised Page 4-3 of HI-981932 Technical Rept for Vermont Yankee Spent Fuel Pool Storage Expansion ML20205K7581999-04-0707 April 1999 Safety Evaluation Supporting Alternative Proposal for Reexamination of Circumferential Welds with Detected Flaw Indications in Plant RPV BVY-99-046, Monthly Operating Rept for Mar 1999 for Vermont Yankee Nuclear Power Station.With1999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Vermont Yankee Nuclear Power Station.With ML20205F6631999-03-0404 March 1999 Jet Pump Riser Weld Leakage Evaluation BVY-99-035, Monthly Operating Rept for Feb 1999 for Vermont Yankee Nuclear Station.With1999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Vermont Yankee Nuclear Station.With ML20205P8241999-02-28028 February 1999 Rev 2 to Vermont Yankee Cycle 20 Colr ML20203H9881999-02-18018 February 1999 SER Accepting Alternative to 10CFR50.55a(g)(6)(ii)(A) Augmented Reactor Vessel Exam at Vermont Yankee Nuclear Power Station.Technical Ltr Rept Encl ML20203A6951999-02-0404 February 1999 Revised Rev 2,App B to Vermont Yankee Operational QA Manual (Voqam) ML20199K7151999-01-21021 January 1999 Corrected Safety Evaluation Supporting Amend 163 Issued to FOL DPR-28.Pages 2 & 3 Required Correction & Clarification ML20199K6991999-01-20020 January 1999 Safety Evaluation Concluding That Request to Use YAEC-1339, Yankee Atomic Electric Co Application of FIBWR2 Core Hydraulics Code to BWR Reload Analysis, at Vermont Yankee Acceptable ML20199L5951999-01-14014 January 1999 Safety Evaluation Accepting Licensee Proposed Alternative to Code Requirement,Described in Rev 2 to Pump Relief Request RR-P10 Pursuant to 10CFR50.55a(a)(3)(i) BVY-99-071, Corp 1998 Annual Rept. with1998-12-31031 December 1998 Corp 1998 Annual Rept. with BVY-99-001, Monthly Operating Rept for Dec 1998 for Vermont Yankee Nuclear Power Station1998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Vermont Yankee Nuclear Power Station ML20198H5481998-12-23023 December 1998 Rev 2 to Vermont Operational QA Manual,Voqam ML20196H8641998-12-0101 December 1998 Cycle 19 Operating Rept BVY-98-163, Monthly Operating Rept for Nov 1998 for Vermont Yankee Nuclear Power Station.With1998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Vermont Yankee Nuclear Power Station.With ML20195C4161998-11-0909 November 1998 SER Accepting Request That NRC Approve ASME Code Case N-560, Alternative Exam Requirement for Class 1,Category B-J Piping Welds BVY-98-154, Monthly Operating Rept for Oct 1998 for Vermont Yankee Nuclear Power Station.With1998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Vermont Yankee Nuclear Power Station.With ML20155B6471998-10-26026 October 1998 Safety Evaluation Accepting Jet Pump Riser Insp Results & Flaw Evaluation,Conducted During 1998 Refueling Outage ML20154N0891998-10-16016 October 1998 Rev 1 to Vermont Operational QA Program Manual (Voqam) ML20154B6951998-10-0101 October 1998 SER Re Licensee Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves, for Vermont Yankee Nuclear Power Station BVY-98-149, Monthly Operating Rept for Sept 1998 for Vermont Yankee Nuclear Power Station.With1998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Vermont Yankee Nuclear Power Station.With ML20239A1361998-09-0202 September 1998 SER Re License Request for NRC Review & Concurrence W/Changes to NRC-approved Fire Protection Program BVY-98-135, Monthly Operating Rept for Aug 1998 for Vermont Yankee Nuclear Power Station.With1998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Vermont Yankee Nuclear Power Station.With ML20151U0361998-08-28028 August 1998 Non-proprietary Rev 1 to Holtec Rept HI-981932, Vermont Yankee Nuclear Power Station Spent Storage Expansion Project ML20237E9221998-08-20020 August 1998 Vynp 1998 Form NIS-1 Owners Summary Rept for ISI, 961103-980603 BVY-98-122, Monthly Operating Rept for July 1998 for Vermont Yankee Nuclear Power Station1998-07-31031 July 1998 Monthly Operating Rept for July 1998 for Vermont Yankee Nuclear Power Station ML20205F6491998-07-31031 July 1998 Rev 1 to GE-NE-B13-01935-02, Jet Pump Assembly Welds Flaw Evaluation Handbook for Vermont Yankee ML20236G0011998-06-30030 June 1998 Individual Plant Exam External Events BVY-98-098, Monthly Operating Rept for June 1998 for Vermont Yankee Nuclear Power Station1998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Vermont Yankee Nuclear Power Station ML20248C5081998-05-31031 May 1998 Rev 2 to 24A5416, Supplemental Reload Licensing Rept for Vermont Yankee Nuclear Power Station Reload 19 Cycle 20 ML20248C4951998-05-31031 May 1998 Rev 1 to Vermont Yankee Nuclear Power Station Cycle 20 Colr BVY-98-081, Monthly Operating Rept for May 1998 for Vermont Yankee Nuclear Power Station1998-05-31031 May 1998 Monthly Operating Rept for May 1998 for Vermont Yankee Nuclear Power Station ML20247J8341998-05-31031 May 1998 Peak Suppression Pool Temp Analyses for Large Break LOCA Scenarios, for May 1998 ML20247G4001998-05-12012 May 1998 Interview Rept of Ej Massey ML20247E6351998-04-30030 April 1998 Rev 1 to GE-NE-B13-01935-LTR, Jet Pump Riser Welds Allowable Flaw Sizes Ltr Rept for Vermont Yankee 1999-09-30
[Table view] |
Text
. .
O VEF3.ONT YANKEE NUCLEAR P0b?.R STATION MONTHLY STATISTICAL REPORT S0-07 FOR THE MONTH OF JULY,1980 I
1 I
l l
l t
8 008190 Q(Ll
J OPERA!!NG DATA Fl? ORT DOCKET NO. 50-271 DATE c0-05-06 COMPLETE 0 3Y F.C. Seers TILIPHONI617-366-9011 X2215 0?ERATING STATUS Notes i 1. Unit Name: Vermonc Yankee
- 2. Reporting ?eriod: July 1980 1593 1 3. Licensed Thermal ?cwer(MWt):
4 Namepla:e Ra:ing(Gross MWe): 540
- 5. Design Electriesl Rating (Ne: MWe): 514(open)504(closed)
- 6. Maxi =um Dependable Capacity (Gross MWe): 535 a
- 7. Max 1=us Dependable Capacity (Net MWe): 504 i
i 8. If Changes occur in Capacity Ratings (Items Number 3 Through 7)Since Last Report, Give Reasons:
- 9. Power Level to Which Restricted,If Any(Net MWe): $$as!"ESOE.limitedduetoendofcycle
- 10. Reasons For Restrictions, If Any: ,
4 i
i This Month Yr-to-Date Cunulative
- 11. Hours In Reporting Period 744 5,111 --
- 12. Number Of Hours Reactor Was Cri:1 cal 724.75 4,898.46 56.056.85 nn 0,0
- 13. Reactor Reserve Shutdown Hours 0.0
- 14. Hours Genera:or On-Line 714.00 4,832.60 54.160.38
- 15. Unit Reserve Shutdown Hours 0.0 nn 0.0
- 16. Gross Ther=al Energy Geners:ed(MWH) 1.070.586.00 7 37o 77s.nn 76,604,388.00
- 17. Gross Elec:rical Energy Genera:ed(MWH) 348, 966.00 2.490.768.00 25.460.438.00
- -n I 18. Net Elec:rical Energy Generated (MWH) 326.943.00 2.370.044.00 24 'to ano no
! 19. Uni: Service Factor 95.97 94.55 78.60
- 20. Uni: Availability Factor 95.97 o4.95 7a an l
- 21. Uni: Capacity Factor (Using MDC Net) 87.19 92.01 69.51 f
- 22. Unit Capacity Facter(Using DER Nec) 85.49 90.22 68.15
- 23. Uni: Forced Cutage Ratt 4.03 9 14 6.16 l
- 24. Shu:dewns Scheduled Over Nex: 6 Months (Type, Da:e, and Duration of Each):
Refuelin: Outaee scheduled to bee <- c- c# a-w.- 94 s o o n 2n d ._-411 v,e. -
c er aooreximatelv eicht weeks.
- 25. If Shu: D0wn At End Of Reper: ?eriod, Isti=ated Date of Startup:
- 26. Uni:s In Tes: Status (Frior :o Co==ercial Operation): Forecas: Achieved ,
IN!!IAL CRITICALI"Y IN!!!AL ELECTRICITY COMMERCIAL OPERATION
-. m - - - - - - - , -m.,,-.r.-, . , , .- , , , - . - - , - . . . - - ,-4 -,--,-..-r. . .mr..- ,,-,,e -,,,,,,,-,,..,4-.,7- ,---.,-c-.,2w...,._,4,. , . 3---
AVE.UGE DAILY ;,3'!! 20*4ER :.I'/EL DOCKET No. 50-271 CiI! Ver=on: Yankee DATE 80-08-06 CC)C'LITED 3Y F.J. Burzer e.. :?HCh.g 802-257-7711 X137
..u-MONTH July DAY AVE.U GE DAILY FO'4ER LEVIL DAY AVERAGE DAILY FCb7.R LEVEL (Yde-Ne:) (X'Je-Ne:)
- 1. 487 17. 468
- 2. 482 18. 46; 19, 424
- 3. 480 4
3'9 20, 481
- 21. 477
- 3. 434 489 22. 478 6.
'91 23. 475 7.
489 24 477 3.
- 9. -o7 25. 474 456 26. ;n 10.
- 11. 484 27. :m 188 28. n 12.
- 29. 470
! 13, 21 30, 454 14 334 l
- 31. 469
- 15. 458 l
- 16. 473 i
I .N A s-u.
.,,. v.-,... ,N w S:
l 1' On this format, list :he average dail/ uni: power level in K4e-Net Icr each day in
- he reporting =cn:h. Cc=pu:e :o the nearest whole megawa::.
(
l
e e d h e e t y sase e i b nt ul c f f ois c od oaci r 7 t t sI n e iD cF u
. 3 na pgr t i o 1 yep 1 mni cf L) S e X e e rd y1 . uiu uo R r e e t i b e P t q t nof r E.
l.
k 1 v c t n wg se m n r i n n eee a . er sof( a a e 1
7 t e e gght et ni S
. 2 Y g 7 c r m l ar cu r s I t st) 6 r - e r t l k ai o i d a at r1 -
f t 0 lu 7 r u s eahh cn - r eo6 r c C a e p1 o 1 7
n o 8
- I 5 2 o e j u
w c. isc, wt yI x R ea me ph e0 I
1 2 m 0 . - C R d r e et t eSR t a en i r C i r - 2 d "t vsy
- hP yt E e 0 e 0 J. 0 & t n .d r t r nR b
i g 5 V 8 F 8 e e n r epue "i l as . hrt ei l h
a s v r ogml h v 7 xonvN x l'
u e e f auit o e1 Ef EE( E a kP a t sv -
C r
P tt na f g si0 5 oEEY a p
oe . n r a i 8 il egi i pd NMT1 E 1 t r nr a y n .
- AA N d c eiiu pbdi
. TNDDOI E E I R
o ut ckd d aec e
r er ot e
KT TP egR ad g l CI ON E. E, l ri pe mrl l m)
DU l
P E I
o t r r a ou a n MT r r s "1 ei 1 oh rl i ri ee va mca O
C t
n o
wv" ons ae l p f ct r snC eioR aSl p
C Pi avr r
Pd cN ccx
. SiE t(
l a as uuoe mr D X X nnt h O E E E
n 3.o
,. 80oU R
N V.
I V,
aaut MMAO l :
O A
_ C V h
V d - - - -
h ol 234 t
e n S M o N A I I
l l i R C C O
I lo.
" >m t
a n
T i C
U m D # a E e t x R y s r E n"o e"e e l p )
R u A A A n s
)
E n W
O J i L
c"R /
N
/
N
/
N i
a n
e i
a P l p c l n 1, p D
li T x oI x N E i E
N ) ) ( t t & (
A O M $o $:c $oo rc t
rc t
ee s c i g r S
N T m$g$c.m eu eu rT r n o W R 4 wd 4 wd 2 u ti r)
O O Y 0.u e oe pr oe pt l r nner n D P (
i o eivEi T E
(
a R ai a U R F e rtll l c yT aap iS gEof o 1
1 1
1 A t ngr rnx m nanort oE T enit osi(
I mel at i t N 9gO:v 0 0 0
- pt el anar nl nuuri r e U EgEuO 3 ot i f gemeh i
s qaee pd pt aEMR ROAOO
- e - - - - - - - -
jSH i RAl CDF.FGl l S S F e 3 0 2 t 0 1 1 a - - ~
- D 7 7 /
d 0 0- O e
- e - l 0 0
/ 8 FS 9
1 1 1 o - - -
FS
- : 0 8
N 0 0 0 /
_ 8 8 8 7
) 4 l i l ; ,Iii; ;l ]1j j^ I ;l! :j . j
l' age 4 ot 4 t
t f
- UNIT SiluTDOWNS AND POWER REDUCTIONS DOCKET No 50-271 UNIT NAME Vermont Yankee DA 0-08-06 REPORT MONTil July COMPI.ETED BY F.J. Burger l TE!.EPIIONE _ 802-257-7711 X_137 l
1 .
! i t m No.
NO m 'o N' N N Cause & Corrective I Date j ;j Sj g ;4 aj ' license i14,
, gg g
- n. oo vi o as c: Event . . .o o .o
< h H
um ov es e
.r: oe Reporti vi o o, o I,revent Recurrence ,
j u.cn: hu et u . I
, A sx: e vi un o l 1
i __
e s 80-20 80-07-18 S O II 4 N/A RA Cod! ROD Control Rod pattern adjustment. !
j (power j- s' educt) ;
! 80-21 '80-07-30 S 0 11 4 N/A EB TRANSF Hain t ransformer cooling system failure (power caused by blown fuses. Fuses replaced, i
reduct) t ,
4 l
i i
l i
i i
s 1 2 3 4 F: Forced Reason: Method: Exhthit G- Instructions f S: Sched:aled A-Equipment Failure (Explain) l- Manual for Preparation of Data
] H-Haintenance or Test 2- Manual Scrate Ent ry Sheets for I,Icensee
! C-Refueling 3- Automatic Scram Event Report (I.ER) File i
} D-Regulatory Restrict.lon 4- Other (Explain) (NUREG 0161)
E-Operate r Training & l.lcen'se Examination 5
- F- Adnii ni s t ra t ive Exhibit I - Same Source ,
j ,
G-Operatlonal Error (Explain)
Il-Other (Explain) 1 i i
I
- . - _ - _ . - -. .~ -
1 , <
s t
r r g g n e e n t n e 7 N n n n 3 O i e e i o
1 I n n i i t v k t p e X T o o a a t l s t m e C i i r r i a a i o
k A t t t t F V C F C n
1 1
a a S S a ' 7 E r r d d d d d Y E 7 V b b d d e e e e e 6 ' I i i e e c k c c c t 0 " 7 T l l n n a c a a a 1 n 5 C a a a a l a l l c c l
- c c p p p p p 7 o 8 2 E e e e e e e 2 m 0 - R 1 1 e
- r -
2 R R R C C R R R R R 0 e 0
v v r r i i e e t t n n a a i i d y vr v a a i r r r u l pe
. T Y E T. e e t t l E. I st st S S F pl 0 I g L N U g nn
. I 2 M O S nn ub U g D l E oi oi d d e e e f S a r
T E Pi R Co C o e e g g g O r e E T E.
r p g g a a a e p K et et g g k k k s C E. I E N r e re o o a a a s wo O
I P T O oS oS l l
- c. e. c. o.
on D M M C C PI M I 1 1 1 I O T C C N
U F. t t g I f f e e g n A i i e c n t i H r r l i i e t d D D v v k k t e r r c s i t .
t t e e a a F as E n n S S P C rt S i i n g on U o o l l o d d n i e A P P a a i e e i r n C n m s l l k eo t t n r o i i a t p E e e o o r a a c. em C S S N N E F F l D o N
A I
N
. E E T G N A 1 1
I T 3 3 A U / /
H O R 3 4 E 2 2 D R l A A A A A A A - -
E O iM / / / / / / / 0 0 T U N N N N N N N 8 8
. A. R N I
E E.
l R R R E. E.
I I
. Y
. T E
F A
S
_ E F C O N A e e e e e e e e e E N v1 v3 v6 v4 v6 v0 v2 v3 v1 lt E i 5 i 7 i9 i 0 i0 i2 i 2 i2 i2 U T t6 t6 t6 t 7 t7 t 7 t7 t7 c- c - c - c - c - c - c - c - t8 T N e0 e0 e0 e0 c -
A I e0 e0 e0 e0 e0 N A r8 r8 r8 r8 r8 r8 r8 r8 r8
- H r r r r r r r r r oR oR oR oR oR oR oR oR oR
- CH CH CM CN CM CH CH CH CM
. 3 g n4
- n ps i1 i a -
r r p ms rt i p
p
. e e i ua D S. y t t P P p J T m m a a y e l
. N E
eD eC W W rh es n1 5 e
n ,
r p
p
_ Ti -
T1 I h M e e e o u
_ 2 2 t a i e l P e1 e1 c c aw t v mL s s
S I
n - n - i r i r Wk al al U
Q i2 i 2 ve ve c l a ew e r E
l
- l - r n r n ea uV t S r p
e
_ mS mS ei ei cl l c S w aT aT S a S a i r e l u o e , e r r vr i g ne S P t t , Rt k t r e cr t I iv
_. Sh c
Sh c
l l
R S iS l
R Si en ea4 Rh5 MI a e. k8 15 1
_ nt nt p p a c - c7 i i ii "t m " m " r "! s2 r o S aw law u C u i t i
- "A o hR P f S MS "i P " P "l S "! DV " l' SR U
' , ,i<
- i ,i" )i j' ;i!j:)j i .
DOCKET NO.
50-171 t.377 Vermon: Yankee DATE 80-03-06 COXpLITED 3Y F.J. Burger TEL7? HONE 802-257-7711 X137 Pl?CRT MONTH v. . $ ..
J SL*M'O.RY OF OPERATING EX?ERIENCES 1
l Highlights Vernon: Yankee opera:ed a: 90.3% of rated :her=al power for the nonth.
Gross elec:rical genera: ion was 348,966 MWH e or 86.8% of design elec:rical capaci:y.
Ooerating Sun =ar-The following is a chronological descriptien of plant operations including other partinen items of interest for the sench:
2 7/1/30- At the beginning of the reporting period the plant was operating at 99% of rated therr.a1 power.
7/4/80- At 0000 hrs. a power reduction was initiated for a control rod pa::ern adjustment.
7/10/80- At 1516 hrs. a power reduction was initiated in preparation for a drywell entry to inv.astigate leakage.
7/10/80- At 1551 hrs. a power increase was initiated.
7/12/30- At 0800 hrs. a plant shutdown was initiated to repair valve leakage and perform testing to verify the operation of the Control Rod Drive System. The turbine generatar was off the grid a: 1125 hrs.
7/13/30- At 1321 hrs. a start.up was initiated. The turbine generator was phased onto the grid a: 1736 hrs.
7/18/80- At 2212 hrs. a power redue:1on was initiated for a control rod pat:ern adjustment.
7/30/80- At 0320 hrs, a power reduction was initisted due to the loss of the main transformer cooling system. At 0440 hrs. a power increase was initia:ed.
7/31/80- Ac the end of the repor:ing period the plant was operating at 96% of rated ther=al power.