Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000293/LER-1980-039-01, /01T-0:on 800820,calibr Techniques for Limiting Safety Sys Setting & for Average Power Range Monitor Found to Be Nonconservative.Cause Unstated.Interim Administrative Limits Established Pending Final Guidelines + (08:39:16, 31 December 2024)
- 05000296/LER-1980-028, Forwards LER 80-028/03L-0 + (08:39:19, 31 December 2024)
- 05000293/LER-1980-039, Forwards LER 80-039/01T-0 + (08:39:21, 31 December 2024)
- 05000339/LER-1980-046, Forwards LER 80-046/03L-0 + (08:39:22, 31 December 2024)
- ML19331D799 + (08:39:24, 31 December 2024)
- ML19331D796 + (08:39:24, 31 December 2024)
- 05000339/LER-1980-044-03, /03L-0:on 800730,during Mode 2 Generation at 3% Power Bypass Feedwater Regulator Valve Failed Open,Causing High Water Level in Steam Generator A.Caused by Valve Operator Failure,Possibly Caused by Water in Air Line + (08:39:26, 31 December 2024)
- ML19331D794 + (08:39:28, 31 December 2024)
- ML19331D793 + (08:39:30, 31 December 2024)
- ML19331D792 + (08:39:31, 31 December 2024)
- 05000339/LER-1980-044, Forwards LER 80-044/03L-0 + (08:39:33, 31 December 2024)
- ML19331D788 + (08:39:34, 31 December 2024)
- ML19331D787 + (08:39:35, 31 December 2024)
- 05000339/LER-1980-043-03, /03L-0:on 800814,during Mode 5 Operation, Pressurizer Power Relief Valve Declared Inoperable When Nitrogen Gas Supply Required for Overpressure Protection Dropped Below 1,775 Psig.Caused by Low Nitrogen Pressure + (08:39:36, 31 December 2024)
- ML19331D785 + (08:39:38, 31 December 2024)
- ML19331D783 + (08:39:38, 31 December 2024)
- 05000339/LER-1980-043, Forwards LER 80-043/03L-0 + (08:39:40, 31 December 2024)
- 05000259/LER-1980-057-03, /03L-0:on 800730,during Past Two Refueling Outages,Required Tech Spec 4.6.G.6 Testing Was Not Performed.Caused by Testing Not Being Identified as Outage Work Item.Insp Will Be Completed at Next Refueling Outage + (08:39:41, 31 December 2024)
- ML19331D778 + (08:39:43, 31 December 2024)
- 05000338/LER-1980-068-03, /03L-0:on 800801,during Full Power,Electrical Load Discovered as Having Been Added to 1H Emergency Bus W/O Approved Jumper.Caused by Improper Administrative Controls. Load Isolated from Emergency Bus & Personnel Reinstructed + (08:39:44, 31 December 2024)
- ML19331D776 + (08:39:45, 31 December 2024)
- 05000259/LER-1980-057, Forwards LER 80-057/03L-0 + (08:39:46, 31 December 2024)
- ML19331D773 + (08:39:48, 31 December 2024)
- 05000338/LER-1980-068, Forwards LER 80-068/03L-0 + (08:39:49, 31 December 2024)
- ML19331D770 + (08:39:50, 31 December 2024)
- ML19331D769 + (08:39:51, 31 December 2024)
- A800040, Forwards Security Plan Re Guard Training & Qualification. Plan Withheld (Ref 10CFR2.790) + (08:39:52, 31 December 2024)
- ML19331D768 + (08:39:52, 31 December 2024)
- ML19331D766 + (08:39:55, 31 December 2024)
- 05000318/LER-1980-036-03, /03L-0:on 800729,engineered Safety Features Actuating Sys Channel Ze de-energized in Three Instances. Channel Ze de-energized While Troubleshooting. Meter Pointers to Defective Bistables Oscillated + (08:39:57, 31 December 2024)
- ML19331D764 + (08:39:59, 31 December 2024)
- 05000368/LER-1980-061-03, /03L-0:on 800728,leakage Discovered on C Charging Pump at Elbow Weld During Mode 1 Operation.Caused by Vibration.Defective Pipe Spool Piece Replaced & Hanger Installed to Reduce Vibration.Pump Operable After Repairs + (08:40:00, 31 December 2024)
- ML19331D761 + (08:40:02, 31 December 2024)
- 05000318/LER-1980-036, Forwards LER 80-036/03L-0 + (08:40:06, 31 December 2024)
- ML19331D758 + (08:40:07, 31 December 2024)
- ML19331D757 + (08:40:08, 31 December 2024)
- ML19331D756 + (08:40:09, 31 December 2024)
- 05000368/LER-1980-061, Forwards LER 80-061/03L-0 + (08:40:10, 31 December 2024)
- ML19331D753 + (08:40:11, 31 December 2024)
- A01153, Advises That NRC 800728 Request for SEP Licensees to Specifically Address Issue of Seismic Support Criteria for Internally Attached Components of safety-related Electrical Equipment Not Feasible Approach + (08:40:12, 31 December 2024)
- ML19331D751 + (08:40:14, 31 December 2024)
- ML19331D749 + (08:40:15, 31 December 2024)
- ML19331D747 + (08:40:15, 31 December 2024)
- 05000327/LER-1980-094-03, /03L-0:on 800620,w/unit in Modes 3,4 or 5,May 1980 Evaluation for Tritium Was Not Performed.Caused by Inadequate Description in Procedure SI-415 for Taking Monthly Samples While Unit Is in Different Modes + (08:40:17, 31 December 2024)
- 05000317/LER-1980-038, Forwards LER 80-038/03L-0 + (08:40:21, 31 December 2024)
- ML19331D742 + (08:40:22, 31 December 2024)
- 05000327/LER-1980-094, Forwards LER 80-094/03L-0 + (08:40:24, 31 December 2024)
- ML19331D737 + (08:40:25, 31 December 2024)
- ML19331D739 + (08:40:25, 31 December 2024)
- ML19331D736 + (08:40:26, 31 December 2024)
- 05000302/LER-1980-032-03, /03L-0:on 800805,while Performing Special Load Test,Emergency Diesel Generator 1A Tripped When Loaded. Caused by Actuation of Field over-current Relay Below Design Setpoint.Relay Adjusted to Proper Value + (08:40:29, 31 December 2024)