Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- IR 05000445/1989076 + (07:49:15, 31 December 2024)
- ML19332C810 + (07:49:17, 31 December 2024)
- ML19332C809 + (07:49:18, 31 December 2024)
- ML19332C806 + (07:49:19, 31 December 2024)
- ML19332C805 + (07:49:20, 31 December 2024)
- ML19332C804 + (07:49:21, 31 December 2024)
- JPN-89-076, Forwards Criteria to Be Used to Interpret Term Verify Operable, Per Util 890531 Proposed Tech Spec Changes, Reflecting LPCI Mods During Reload 1/Cycle 2 Refueling Outage & Eliminating Need for Redundant Surveillance Tests + (07:49:22, 31 December 2024)
- ML19332C802 + (07:49:24, 31 December 2024)
- NLS8900423, Forwards Oct 1989 Addenda to Rev 3 to Inservice Insp Program for ASME Class 1,2 & 3 Components. Addenda Incorporates Supports Noted in Detailed Isometric Review Into Inservice Insp Program + (07:49:25, 31 December 2024)
- ML19332C801 + (07:49:25, 31 December 2024)
- ML19332C797 + (07:49:27, 31 December 2024)
- ML19332C794 + (07:49:29, 31 December 2024)
- 05000361/LER-1988-035, :on 881216,determined That Plant Operated at Estimated Actual Power in Excess of 102% from 831223-840104. Caused by Mfg Defect of Feedwater Flow Venturi Tap.Venturi Repaired & Subsequently Replaced + (07:49:30, 31 December 2024)
- ML19332C791 + (07:49:31, 31 December 2024)
- ML19332C790 + (07:49:32, 31 December 2024)
- RBG-31771, Monthly Operating Rept for Oct 1989 for River Bend Station, Unit 1 + (07:49:33, 31 December 2024)
- ML19332C788 + (07:49:35, 31 December 2024)
- ML19332C787 + (07:49:36, 31 December 2024)
- ML19332C785 + (07:49:39, 31 December 2024)
- ML19332C786 + (07:49:39, 31 December 2024)
- ML19332C783 + (07:49:41, 31 December 2024)
- ML19332C780 + (07:49:42, 31 December 2024)
- ML19332C779 + (07:49:43, 31 December 2024)
- ML19332C778 + (07:49:44, 31 December 2024)
- ML19332C777 + (07:49:45, 31 December 2024)
- ML19332C776 + (07:49:47, 31 December 2024)
- ML19332C775 + (07:49:48, 31 December 2024)
- ML19332C774 + (07:49:49, 31 December 2024)
- ML19332C773 + (07:49:50, 31 December 2024)
- ML19332C772 + (07:49:51, 31 December 2024)
- ML19332C771 + (07:49:51, 31 December 2024)
- ML19332C770 + (07:49:53, 31 December 2024)
- ML19332C769 + (07:49:54, 31 December 2024)
- ML19332C767 + (07:49:55, 31 December 2024)
- 05000259/LER-1989-013-02, :on 890601,seismic Reanalysis of Reactor Pressure Vessel Calculated That CRD Housings Will Exceed Stress Limits Specified in Fsar.Cause Not Determined.Lateral Restraints Added to CRD Housings + (07:49:56, 31 December 2024)
- ML19332C765 + (07:49:58, 31 December 2024)
- U-601559, Notifies of RW Dillman Resignation as Licensed Operator, Effective 891113 + (07:50:00, 31 December 2024)
- ML19332C764 + (07:50:00, 31 December 2024)
- ML19332C762 + (07:50:03, 31 December 2024)
- TAC:49436 + (07:50:04, 31 December 2024)
- ML19332C761 + (07:50:05, 31 December 2024)
- ML19332C760 + (07:50:06, 31 December 2024)
- IR 05000327/1989026 + (07:50:08, 31 December 2024)
- 05000254/LER-1989-017-03, :on 891022,discovered That 6-month Functional Test Procedure Qos 500-3 Re Functional Test for Reactor Protection Sys Electrical Assemblies Not Completed in Required Time.Caused by Mgt Deficiency + (07:50:10, 31 December 2024)
- ML19332C757 + (07:50:12, 31 December 2024)
- IR 05000219/1989025 + (07:50:14, 31 December 2024)
- ML19332C754 + (07:50:15, 31 December 2024)
- ML19332C752 + (07:50:17, 31 December 2024)
- ML19332C751 + (07:50:18, 31 December 2024)
- 05000341/LER-1989-029, :on 891023,half Scram Signal Received When Power Was Lost on Reactor Protection Sys Bus B,Resulting in Several ESFs Actuation.Caused by Location of Breaker Operating Switch in High Traffic Area + (07:50:20, 31 December 2024)
- IR 05000334/1989018 + (07:50:29, 31 December 2024)