- ML19332E659 + (07:01:56, 31 December 2024)
- 05000374/LER-1989-015-05, :on 891030,shift Control Room Engineer Noted That Quarterly Standby Liquid Control Operating Surveillance LOS-SC-Q1 Was Past Critical Date.Caused by Clerical Data Entry Error.Missed Surveillance Performed + (07:01:57, 31 December 2024)
- ML19332E656 + (07:01:59, 31 December 2024)
- ML19332E657 + (07:01:59, 31 December 2024)
- ML19332E651 + (07:02:00, 31 December 2024)
- ML19332E648 + (07:02:01, 31 December 2024)
- IR 05000424/1989032 + (07:02:04, 31 December 2024)
- ML19332E646 + (07:02:05, 31 December 2024)
- ML19332E644 + (07:02:07, 31 December 2024)
- ML19332E642 + (07:02:12, 31 December 2024)
- 05000456/LER-1989-002-01, :on 890416,main Steamline Low Pressure Reactor Trip,Safety Injection & Main Steamline Isolation Occurred. Caused by Mgt & Procedural Deficiencies.Formal Policy on Use of Extra Operator During Startup Developed + (07:02:13, 31 December 2024)
- ML19332E636 + (07:02:15, 31 December 2024)
- 05000278/LER-1989-007-04, :on 891026,reactor Vessel Temp & Reactor Coolant Pressure Not Logged Every 15 Minutes as Required by Tech Spec 4.6.A.2 During Performance Integrated Leak Rate Testing.Caused by Procedure Deficiency + (07:02:16, 31 December 2024)
- ML19332E632 + (07:02:19, 31 December 2024)
- ML19332E631 + (07:02:20, 31 December 2024)
- 05000304/LER-1989-010-05, :on 891030,steam Generator Blowdown Sample Missed Surveillance.Caused by Personnel Error in That Shift Engineer Failed to Recognize That Out of Svc Would Isolate Monitor R-19.Caution Plaques Added to Valves + (07:02:22, 31 December 2024)
- ML19332E628 + (07:02:24, 31 December 2024)
- 05000456/LER-1989-015-04, :on 891020,sample Canisters for Auxiliary Bldg Vent Stack Radiation Monitor Removed & Not Analyzed within 48 H.Caused by Programmatic Deficiencies & Personnel Error. Procedures & Training Programs Revised + (07:02:25, 31 December 2024)
- IR 05000313/1989034 + (07:03:00, 31 December 2024)
- 05000333/LER-1989-019, :on 891031 & 891103,HPCI Sys Declared Inoperable Due to Electrical Ground in Speed Control Circuit.Caused by Buildup of Conductive Corrosion Products. Connector Cleaned & Sys Returned to Svc + (07:03:02, 31 December 2024)
- ML19332E622 + (07:03:07, 31 December 2024)
- W3P89-2320, Informs NRC of Results of Actions Committed by Util in Response to Violation Noted in Insp Rept 50-382/89-05. Transmitters Will Be Relocated Above Containment Bldg Flood Level During Refuel 4 Consistent W/Util Prior Schedule + (07:03:08, 31 December 2024)
- ML19332E620 + (07:03:10, 31 December 2024)
- ML19332E618 + (07:03:11, 31 December 2024)
- IR 05000424/1989027 + (07:03:59, 31 December 2024)
- ML19332E615 + (07:04:01, 31 December 2024)
- 05000321/LER-1989-016-02, :on 891103,discovered That Procedures 57SV-C51-001-1/2S Did Not Fully Test Rod Block Monitor Function.Caused by Procedural Deficiency.Limiting Condition for Operation Initiated & Procedure Revised + (07:04:02, 31 December 2024)
- U-601557, Responds to Violations Noted in Insp Rept 50-461/89-27. Corrective Actions:Procedure 4005.01 Revised to Require Initiation of Manual Scram When Feedwater Temp Drops by Greater than 100 Degrees F + (07:04:03, 31 December 2024)
- U-601562, Special Rept:On 891030,test Failure of Div II Diesel Generator Occurred.Caused by Cam/Spring Holding Fallen Screw in Console Section of Panel.Holding Screw Reinstalled in Switch.Control Switch Will Be Inspected in Upcoming Outage + (07:04:05, 31 December 2024)
- 0CAN128901, Responds to Violations Noted in Insp Repts 50-313/89-42 & 50-368/89-42.Corrective Actions:On 891020,21 & 22,training Conducted to Emphasize Requirements of Weld Procedure Spec Must Be Followed + (07:04:11, 31 December 2024)
- ML19332E609 + (07:04:11, 31 December 2024)
- ML19332E606 + (07:04:20, 31 December 2024)
- BSEP-89-1060, Special Rept 2-SR-89-005:on 891106 & 08,specified 7-day Time Frame for Fire Barrier Limiting Condition for Operation Exceeded for Fire Doors 112 & 004,respectively.Caused by Doors Not Being Repaired in Required Time + (07:04:22, 31 December 2024)
- IR 05000206/1989029 + (07:04:29, 31 December 2024)
- ML19332E599 + (07:04:31, 31 December 2024)
- ML19332E598 + (07:04:32, 31 December 2024)
- 1CAN118903, Responds to NRC Bulletins 79-02, Anchor Bolts & Baseplates & 79-14, Piping Analysis Consistency W/Plant Configuration & Insp Rept 50-313/89-200.Util Actively Pursuing Issues Raised During Insp.Initial 79-14 Response Already Adequate + (07:04:33, 31 December 2024)
- IR 05000271/1989020 + (07:04:50, 31 December 2024)
- ML19332E589 + (07:04:51, 31 December 2024)
- IR 05000344/1989026 + (07:04:58, 31 December 2024)
- IR 05000423/1989017 + (07:05:02, 31 December 2024)
- ML19332E586 + (07:05:03, 31 December 2024)
- ML19332E584 + (07:05:05, 31 December 2024)
- 0CAN118910, Submits Followup Response to Weaknesses Noted in Insp Repts 50-313/89-12 & 50-368/89-12 Re 1989 Radiological Emergency Preparedness Exercise.Corrective Actions:New Command & Control Methodology Developed by State of Ak + (07:05:06, 31 December 2024)
- ML19332E582 + (07:05:06, 31 December 2024)
- ML19332E580 + (07:05:08, 31 December 2024)
- ML19332E576 + (07:05:14, 31 December 2024)
- ML19332E573 + (07:05:18, 31 December 2024)
- PNO-I-89-094, on 891128,licensee Made Containment Entry to Investigate Sources of Unidentified RCS Leakage Which Was at About 0.5 Gpm.Licensee Insp Identified Leakage from Lower Setpoint Adjustment Screw on Pressurizer Code Safety Valve + (07:05:21, 31 December 2024)
- ML19332E570 + (07:05:23, 31 December 2024)
- ML19332E568 + (07:05:24, 31 December 2024)