Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19259C720 + (20:17:00, 3 January 2025)
- ML19259C719 + (20:17:01, 3 January 2025)
- 05000265/LER-1979-015-01, /01T-0 on 790724:pressure Switches PS2-1622A & PS2-1622B Were Found to Actuate Less Conservatively than Tech Specs Required.Caused by Instrument Setpoint Drift. Instruments Recalibr + (20:17:37, 3 January 2025)
- ML19259C717 + (20:17:40, 3 January 2025)
- 05000250/LER-1979-023-03, /03L-0 on 790701:during Power operation,3B Charging Pump Experienced Package Failure & Excessive Seal Leakage.Caused by Failure of Primary & Secondary Packing. Packing Was Replaced & Pump Tested + (20:18:02, 3 January 2025)
- ML19259C715 + (20:18:07, 3 January 2025)
- 05000265/LER-1979-015, Forwards LER 79-015/01T-0 + (20:18:10, 3 January 2025)
- ML19259C712 + (20:18:12, 3 January 2025)
- ML19259C711 + (20:18:14, 3 January 2025)
- 05000250/LER-1979-023, Forwards LER 79-023/03L-0 + (20:18:17, 3 January 2025)
- 05000265/LER-1979-014-03, /031-0 on 790723:steam Inlet Valve Mo 2-1301-16 Failed to Close During Reactor Core Isolation Cooling Monthly Valve Operability Test.Caused by Component Failure of Torque Switch on Valve Mo 2-1301-16.Switch Replaced + (20:18:20, 3 January 2025)
- ML19259C706 + (20:18:22, 3 January 2025)
- ML19259C705 + (20:18:23, 3 January 2025)
- ML19259C704 + (20:18:24, 3 January 2025)
- ML19259C703 + (20:18:26, 3 January 2025)
- 05000265/LER-1979-014, Forwards LER 79-014/03L-0 + (20:18:28, 3 January 2025)
- ML19259C700 + (20:18:29, 3 January 2025)
- ML19259C699 + (20:18:31, 3 January 2025)
- ML19259C697 + (20:18:35, 3 January 2025)
- ML19259C696 + (20:18:39, 3 January 2025)
- ML19259C695 + (20:18:41, 3 January 2025)
- ML19259C694 + (20:18:44, 3 January 2025)
- ML19259C693 + (20:18:45, 3 January 2025)
- 05000265/LER-1979-013-03, /031-0 on 790712:while Performing Motor Operated Valve Operability Test,Thermal Overload Relay for Pump Suction Valve 1C RHR Tripped & Could Not Be Reopened.Caused by Loose Electrical Connections at Breaker + (20:18:47, 3 January 2025)
- ML19259C691 + (20:18:49, 3 January 2025)
- 05000265/LER-1979-013, Forwards LER 79-013/03L-0 + (20:18:52, 3 January 2025)
- ML19259C683 + (20:18:53, 3 January 2025)
- ML19259C682 + (20:18:57, 3 January 2025)
- ML19259C681 + (20:18:59, 3 January 2025)
- ML19259C680 + (20:19:01, 3 January 2025)
- ML19259C679 + (20:19:03, 3 January 2025)
- ML19259C678 + (20:19:05, 3 January 2025)
- ML19259C677 + (20:19:07, 3 January 2025)
- ML19259C676 + (20:19:09, 3 January 2025)
- ML19259C675 + (20:19:11, 3 January 2025)
- ML19259C674 + (20:19:13, 3 January 2025)
- ML19259C673 + (20:19:15, 3 January 2025)
- ML19259C672 + (20:19:17, 3 January 2025)
- ML19259C671 + (20:19:18, 3 January 2025)
- ML19259C670 + (20:19:20, 3 January 2025)
- ML19259C644 + (20:19:27, 3 January 2025)
- ML19259C641 + (20:19:29, 3 January 2025)
- ML19259C640 + (20:19:31, 3 January 2025)
- ML19259C639 + (20:19:32, 3 January 2025)
- ML19259C637 + (20:19:34, 3 January 2025)
- IR 05000364/1979004 + (20:19:36, 3 January 2025)
- ML19259C635 + (20:19:38, 3 January 2025)
- ML19259C634 + (20:19:39, 3 January 2025)
- ML19259C633 + (20:19:40, 3 January 2025)
- ML19259C631 + (20:19:41, 3 January 2025)
- IR 05000358/1979012 + (20:19:45, 3 January 2025)