Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19260D184 + (17:50:17, 3 January 2025)
- ML19260D183 + (17:50:18, 3 January 2025)
- ML19260D181 + (17:50:20, 3 January 2025)
- ML19260D180 + (17:50:21, 3 January 2025)
- ML19260D179 + (17:50:22, 3 January 2025)
- ML19260D178 + (17:50:23, 3 January 2025)
- ML19260D176 + (17:50:23, 3 January 2025)
- ML19260D174 + (17:50:25, 3 January 2025)
- ML19260D173 + (17:50:26, 3 January 2025)
- ML19260D172 + (17:50:33, 3 January 2025)
- ML19260D171 + (17:50:34, 3 January 2025)
- ML19260D170 + (17:50:36, 3 January 2025)
- ML19260D169 + (17:50:38, 3 January 2025)
- ML19260D168 + (17:50:40, 3 January 2025)
- ML19260D167 + (17:50:42, 3 January 2025)
- ML19260D166 + (17:50:44, 3 January 2025)
- ML19260D164 + (17:50:47, 3 January 2025)
- ML19260D163 + (17:50:51, 3 January 2025)
- ML19260D161 + (17:50:53, 3 January 2025)
- PNO-II-79-037, on 791203,while Preparing Workable Climate for Const Personnel in Fuel Bldg Area,Gasoline Overflowed from Heater Drip Pan to Floor & Three Workers Treated for Fume Exposure.Heaters Removed,Gasoline Mopped Up + (17:50:59, 3 January 2025)
- PNO-II-79-036, on 791202,leak from Condensate Storage Tank Spilled Water Onto Ground Surrounding Transfer Pump.Probably Less than 10 Uci,Excluding Tritium,Released.Pump Isolated. Design Changes Will Be Implemented to Contain Such Leaks + (17:51:04, 3 January 2025)
- PNO-II-79-035, on 791202,reactor Tripped on High Flux Level. Caused by Failure in electro-hydraulic Control Sys Resulting in Turbine Control Valve Closure & Pressure Spike.Regulator Repaired & Reactor Repaired + (17:51:08, 3 January 2025)
- PNO-I-79-030, on 791205,while Disconnecting Dewatering Vacuum Hose,Two Workers Sprayed W/Contaminated Resin Beads.Measured 3,000-3,500 Dpm on One Worker.Worker Decontaminated & Eyes Examined.Dewatering Procedure Will Be Reviewed + (17:51:13, 3 January 2025)
- ML19260D156 + (17:51:14, 3 January 2025)
- ML19260D155 + (17:51:15, 3 January 2025)
- ML19260D154 + (17:51:18, 3 January 2025)
- IR 05000301/1979020 + (17:51:21, 3 January 2025)
- ML19260D150 + (17:51:24, 3 January 2025)
- ML19260D149 + (17:51:26, 3 January 2025)
- ML19260D148 + (17:51:27, 3 January 2025)
- ML19260D147 + (17:51:36, 3 January 2025)
- ML19260D146 + (17:51:38, 3 January 2025)
- ML19260D145 + (17:51:40, 3 January 2025)
- PNO-III-79-060A, following Shutdown on 791211,two Leaking Plugs Detected During Static Head Test of Steam Generator B & Leaking Tube Detected During Hydrostatic Tests.Inspector Dispatched to Follow Testing,Repair & re-hydro of Leaks + (17:51:45, 3 January 2025)
- ML19260D142 + (17:51:46, 3 January 2025)
- PNO-II-79-044, on 791219,w/reactor in Cold shutdown,13,500 Gallons of Reactor Coolant Spilled Onto Containment Floor Through Disassemblied Feedwater Check Valve.Caused by Error on Written Work Request.No Radioactivity Released + (17:51:50, 3 January 2025)
- ML19260D140 + (17:51:51, 3 January 2025)
- ML19260D139 + (17:51:53, 3 January 2025)
- ML19260D138 + (17:51:55, 3 January 2025)
- ML19260D136 + (17:51:57, 3 January 2025)
- ML19260D135 + (17:51:58, 3 January 2025)
- ML19260D133 + (17:51:59, 3 January 2025)
- ML19260D132 + (17:52:02, 3 January 2025)
- ML19260D131 + (17:52:04, 3 January 2025)
- ML19260D130 + (17:52:06, 3 January 2025)
- ML19260D129 + (17:52:08, 3 January 2025)
- ML19260D127 + (17:52:09, 3 January 2025)
- ML19260D126 + (17:52:10, 3 January 2025)
- ML19260D125 + (17:52:18, 3 January 2025)
- ML19260D124 + (17:52:19, 3 January 2025)
- ML19260D123 + (17:52:21, 3 January 2025)