Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19261D583 + (15:48:46, 3 January 2025)
- ML19261D582 + (15:48:49, 3 January 2025)
- ML19261D581 + (15:48:50, 3 January 2025)
- ML19261D580 + (15:48:52, 3 January 2025)
- ML19261D579 + (15:48:57, 3 January 2025)
- ML19261D577 + (15:48:59, 3 January 2025)
- ML19261D576 + (15:49:01, 3 January 2025)
- ML19261D575 + (15:49:02, 3 January 2025)
- ML19261D573 + (15:49:04, 3 January 2025)
- 05000133/LER-1979-003-03, /03L-0 on 790513:fire Water Sys Header Low Pressure Switch APS-18 Started Fire Pumps at 41 Psig Instead of 45 Psig.Caused by Drift & Close Differential Setting. Setpoint Adjusted Switch Will Be Replaced + (15:49:07, 3 January 2025)
- 05000133/LER-1979-003, Forwards LER 79-003/03L-0 + (15:49:11, 3 January 2025)
- 05000312/LER-1979-001-04, /04L-0 on 790529:plant Liquid Effluent Ph Exceeded 8.5 Limit.Probably Caused by Error Band Associated W/Ph Alarm Setpoint.Investigation Feasibility of Reducing Error Band + (15:49:14, 3 January 2025)
- 05000366/LER-1979-045-01, /01T-0 on 790603:following Reactor Scram, HPCI Sys Received Initiation Signal But Failed to Start When Turbine Stop Valve Did Not Open.Caused by Seal Water Line Leaking Water to Bracket Drain Cavity.Line Repaired + (15:49:43, 3 January 2025)
- 05000366/LER-1979-045, Forwards LER 79-045/01T-0 + (15:50:06, 3 January 2025)
- ML19261D563 + (15:50:09, 3 January 2025)
- 05000366/LER-1979-043-03, /03L-0 on 790527:while Performing Normal Surveillance Procedure HNP-2-3011 on Pressure Switches 2B21-N020A & B,Switches Tripped at 1,066 & 1,067 Psig. Caused by Setpoint Drift + (15:50:13, 3 January 2025)
- ML19261D561 + (15:50:16, 3 January 2025)
- ML19261D560 + (15:50:18, 3 January 2025)
- 05000366/LER-1979-043, Forwards LER 79-043/03L-0 + (15:50:21, 3 January 2025)
- ML19261D557 + (15:50:23, 3 January 2025)
- 05000366/LER-1979-029-03, /03L-1 on 790315:while Shut Down for Repairs,Main Steam Safety Relief Valve Discharge Line Vacuum Breaker Valves Found to Be Partially Opened, Hinge Pins Bent & Springs Distorted.Caused by Valves Being Slammed Open + (15:50:46, 3 January 2025)
- ML19261D555 + (15:50:50, 3 January 2025)
- ML19261D554 + (15:50:52, 3 January 2025)
- ML19261D553 + (15:50:55, 3 January 2025)
- 05000366/LER-1979-029, Forwards LER 79-029/03L-1 + (15:51:08, 3 January 2025)
- ML19261D550 + (15:51:12, 3 January 2025)
- ML19261D548 + (15:51:14, 3 January 2025)
- ML19261D547 + (15:51:16, 3 January 2025)
- ML19261D546 + (15:51:19, 3 January 2025)
- ML19261D545 + (15:51:21, 3 January 2025)
- ML19261D543 + (15:51:23, 3 January 2025)
- ML19261D541 + (15:51:24, 3 January 2025)
- ML19261D540 + (15:51:25, 3 January 2025)
- ML19261D537 + (15:51:31, 3 January 2025)
- ML19261D536 + (15:51:32, 3 January 2025)
- ML19261D535 + (15:51:33, 3 January 2025)
- ML19261D534 + (15:51:35, 3 January 2025)
- ML19261D533 + (15:51:37, 3 January 2025)
- ML19261D532 + (15:51:39, 3 January 2025)
- ML19261D531 + (15:51:43, 3 January 2025)
- ML19261D529 + (15:51:44, 3 January 2025)
- ML19261D528 + (15:51:46, 3 January 2025)
- ML19261D527 + (15:51:47, 3 January 2025)
- ML19261D526 + (15:51:49, 3 January 2025)
- ML19261D525 + (15:51:52, 3 January 2025)
- 05000333/LER-1979-031-03, /03L-0 on 790519:fire Door Between North & South Emergency Switch Gear Rooms Failed to Close on Automatic Signal.Door & Closing Mechanism Lubricated & Adjusted + (15:52:05, 3 January 2025)
- 05000333/LER-1979-031, Forwards LER 79-031/03L-0 + (15:52:43, 3 January 2025)
- ML19261D520 + (15:52:47, 3 January 2025)
- ML19261D519 + (15:52:48, 3 January 2025)
- ML19261D518 + (15:52:51, 3 January 2025)
- ML19261D517 + (15:52:52, 3 January 2025)