Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19270G137 + (11:03:17, 3 January 2025)
- ML19270G135 + (11:03:18, 3 January 2025)
- ML19270G134 + (11:03:19, 3 January 2025)
- ML19270G132 + (11:03:20, 3 January 2025)
- ML19270G130 + (11:03:21, 3 January 2025)
- ML19270G129 + (11:03:22, 3 January 2025)
- ML19270G128 + (11:03:22, 3 January 2025)
- ML19270G127 + (11:03:23, 3 January 2025)
- ML19270G126 + (11:03:24, 3 January 2025)
- ML19270G125 + (11:03:25, 3 January 2025)
- ML19270G124 + (11:03:26, 3 January 2025)
- ML19270G123 + (11:03:27, 3 January 2025)
- ML19270G122 + (11:03:28, 3 January 2025)
- ML19270G121 + (11:03:29, 3 January 2025)
- ML19270G119 + (11:03:30, 3 January 2025)
- ML19270G120 + (11:03:30, 3 January 2025)
- ML19270G118 + (11:03:31, 3 January 2025)
- ML19270G116 + (11:03:32, 3 January 2025)
- 05000333/LER-1978-059-03, /03L-0 on 780805:primary Containment Pressure Suppression Pool Level Exceeded Tech Specs Limit by Two Inches.Caused by Operator Failure to Isolate RHR Sys from keep-full Subsys + (11:03:33, 3 January 2025)
- 05000272/LER-1978-022-01, /01T-0 on 780404:Fischer & Porter 10B2496 Transmitters for Coolant Low Flow Monitoring Had High Output Deviation During Seismic Test.Caused by Vibration of Mounting Plate.Design Change Initiated + (11:03:37, 3 January 2025)
- 05000333/LER-1978-059, Forwards LER 78-059/03L + (11:03:39, 3 January 2025)
- 05000272/LER-1978-022, Forwards LER 78-022/01T-0 + (11:03:44, 3 January 2025)
- ML19270G106 + (11:03:45, 3 January 2025)
- 05000271/LER-1978-009-03, /03L-0 on 780331:during Control Rod Testing, Rod Block Monitor a Was Bypassed Several Times.Caused by Supervisory Misunderstanding.Misunderstanding Clarified & Precautionary Procedures Added + (11:03:46, 3 January 2025)
- ML19270G104 + (11:03:47, 3 January 2025)
- 05000271/LER-1978-009, Forwards LER 78-009/03L-0 + (11:03:48, 3 January 2025)
- 05000219/LER-1978-021-01, /01T-0 on 781010:while Performing Inservice Insp, Discovered Through Wall Crack on Sparger Pipe.Caused by Methods Used to Install Sparger Pipe.Corrective Action Will Be Determined After Full Investigation + (11:03:50, 3 January 2025)
- 05000219/LER-1978-021, Forwards LER 78-021/01T-0 + (11:03:52, 3 January 2025)
- ML19270G095 + (11:03:54, 3 January 2025)
- ML19270G093 + (11:03:55, 3 January 2025)
- ML19270G092 + (11:03:56, 3 January 2025)
- ML19270G091 + (11:03:56, 3 January 2025)
- ML19270G088 + (11:03:58, 3 January 2025)
- ML19270G089 + (11:03:58, 3 January 2025)
- ML19270G086 + (11:03:59, 3 January 2025)
- ML19270G085 + (11:03:59, 3 January 2025)
- ML19270G083 + (11:04:00, 3 January 2025)
- ML19270G082 + (11:04:01, 3 January 2025)
- ML19270G081 + (11:04:01, 3 January 2025)
- ML19270G080 + (11:04:03, 3 January 2025)
- ML19270G079 + (11:04:03, 3 January 2025)
- ML19270G077 + (11:04:05, 3 January 2025)
- ML19270G078 + (11:04:05, 3 January 2025)
- ML19270G076 + (11:04:07, 3 January 2025)
- ML19270G075 + (11:04:07, 3 January 2025)
- IR 05000369/1979021 + (11:04:08, 3 January 2025)
- ML19270G073 + (11:04:10, 3 January 2025)
- ML19270G070 + (11:04:10, 3 January 2025)
- ML19270G069 + (11:04:11, 3 January 2025)
- NUREG-0263, Research Info Ltr 53:results of Initial Series of Three Incore Experiments on Coolability Limits of post-accident Particulate LMFBR Fuel Debris in Sodium Pool.Forwards NUREG/CR-0263 & NUREG/CR-0421 + (11:04:12, 3 January 2025)
- IR 05000440/1979002 + (11:04:16, 3 January 2025)