ML19270G073

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-369/79-21 & 50-370/79-10 on 790328-30.No Noncompliance Noted
ML19270G073
Person / Time
Site: McGuire, Mcguire  Duke Energy icon.png
Issue date: 04/18/1979
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parker W
DUKE POWER CO.
Shared Package
ML19270G071 List:
References
NUDOCS 7906010348
Download: ML19270G073 (2)


See also: IR 05000369/1979021

Text

.

.

,

UNITED STATES

  1. ga 880ug

,

NUCLEAR REGULATORY COMMISSION

o,,

REGloN il

o

101 MARIETTA STREET. N.W.

O

a E

ATLANT A. GEORGI A 3o303

\\*****/

APR 181979

In Reply Refer To:

RII:DKW

50-369/79-21

50-370/79-10

Duke Power Company

Atta:

W. O. Parker, Jr.

Vice President, Steam Production

Post Office Box 33189

Charlotte, North Carolina 28242

Gentlemen:

This refers to the inspection conducted by D. K. Walters of this office

on March 28-30, 1979 of activities authorized by hTC License Nos. CPPR-83

and CPPR-84 for the McGuire facility, Units 1 and 2, and to the discussion

of our findings held with J. C. Rogers at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in

the enclosed inspection report. Within these areas, the inspection

consisted of selective examinations of procedures and representative

records, interviews with personnel, and observations by the inspector.

Within the scope of this inspection, no items of noncompliance were

disclosed.

We have examined actions you have taken with regard to previously identi-

fied enforcement matters and unresolved items. The status of these

items is discussed in the enclosed report.

In accordance with Section 2.790 of the NRC's " Rules of Practice",

Part 2, Title 10, code of Federal Regulations, a copy of this letter and

the enclosed inspection report will be placed in the h3C's Public

Document Room.

If this report contains any information that you (or

your contractor) believe to be proprietary, it is necessary that you

make a written application within 20 days to this office to withhold

such information from public disclosure. Any such application must

include a full statement of the reasons on the basis of which it is

claimed that the information is proprietary, and should be prepared so

that proprietary information identified in the application is contained

in a separate part of the document.

If we do not hear from you in this

regard within the specified period, the report will be placed in the

Public Document Room.

79060103T8

2237

186

.

.

.

A

APR 181979

.

Duke Power Company

-2-

Should you have any questions concerning this letter, we will be glad to

discuss them with you.

Sincerely,

)[. k

[N I

,

7 Charles E. Murphy, Chief

Reactor Construction and

Engineering Support Branch

Enclosures:

Inspection Report Nos. 50-369/79-21

and 50-370/79-10

'

cc w/ enclosures:

M. D. McIntosh, Plant Manager

McGuire Nuclear Station

Post Office Box 488

Cornelius, North Carolina 28031

J. C. Rogers, Project Manager

Duke Power Company

Post Office Box 33189

Charlotte, North Carolina 28242

2237

187