Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000324/LER-1979-065-03, /03L-0 on 790803:during Normal Surveillance of Control panel,2-CO-CR24 Points 1-4 Printed Erratically. Caused by Air Leakage Around Cell.Duct Seal Applied Around Cell Penetrations.Cells to Be Replaced in Sept 1979 + (08:49:30, 3 January 2025)
- ML19275A068 + (08:49:35, 3 January 2025)
- 05000324/LER-1979-065, Forwards LER 79-065/03L-0 + (08:49:41, 3 January 2025)
- ML19275A064 + (08:49:44, 3 January 2025)
- ML19275A062 + (08:49:45, 3 January 2025)
- ML19275A059 + (08:49:46, 3 January 2025)
- ML19275A058 + (08:49:47, 3 January 2025)
- ML19275A057 + (08:49:49, 3 January 2025)
- ML19275A056 + (08:49:50, 3 January 2025)
- ML19275A055 + (08:49:53, 3 January 2025)
- ML19275A053 + (08:49:55, 3 January 2025)
- ML19275A052 + (08:49:57, 3 January 2025)
- ML19275A051 + (08:49:59, 3 January 2025)
- 05000272/LER-1979-052-01, /01T-0 on 790809:review of OL Amend 4 Indicates That 12 Inch Per Minute Rise Rate Restriction May Reduce Margin for Loss of Normal Feedwater & Main Feedline Rupture Accident.Nrc Should Issue OL Mod + (08:50:02, 3 January 2025)
- ML19275A049 + (08:50:05, 3 January 2025)
- 05000272/LER-1979-052, Forwards LER 79-052/01T-0 + (08:50:08, 3 January 2025)
- ML19275A043 + (08:50:28, 3 January 2025)
- ML19275A042 + (08:50:29, 3 January 2025)
- ML19275A040 + (08:50:30, 3 January 2025)
- ML19275A039 + (08:50:32, 3 January 2025)
- ML19275A038 + (08:50:34, 3 January 2025)
- ML19275A037 + (08:50:35, 3 January 2025)
- ML19275A036 + (08:50:37, 3 January 2025)
- ML19275A035 + (08:50:39, 3 January 2025)
- ML19275A034 + (08:50:41, 3 January 2025)
- ML19275A033 + (08:50:44, 3 January 2025)
- 05000313/LER-1979-011-01, /01T-0 on 790809:during NRC Performance Appraisal Team Interview,Discovered That Pressurizer Safety Relief Valve PSV-1002 Was Not Properly Tested in Mar 1978.Valve Retested 790812 W/No Adjustments Required + (08:51:17, 3 January 2025)
- 05000313/LER-1979-011, Forwards LER 79-011/01T-O + (08:52:01, 3 January 2025)
- 05000272/LER-1979-053-01, /01T-0 on 790810:upon Review of All Pipe Supports within Sample of Stress Calculations for safety-related Piping,Rejection Rate Found to Be Outside Normal Limits of Statistical Sampling Techniques.Evaluation Underway + (08:52:30, 3 January 2025)
- 05000272/LER-1979-053, Forwards LER 79-053/01T-0 + (08:53:20, 3 January 2025)
- ML19275A022 + (08:53:25, 3 January 2025)
- 05000267/LER-1979-023-03, /03L-0 on 790727:while Performing Normal Surveillance,Fixed Feedwater Low Flow Switch Found Inoperable. Caused by Component Failure from Normal Wear. Module Was Repaired,Reinstalled & Retested Satisfactorily + (08:53:31, 3 January 2025)
- ML19275A018 + (08:53:34, 3 January 2025)
- ML19275A017 + (08:53:36, 3 January 2025)
- ML19275A016 + (08:53:38, 3 January 2025)
- ML19275A015 + (08:53:39, 3 January 2025)
- ML19275A014 + (08:53:42, 3 January 2025)
- ML19275A013 + (08:53:43, 3 January 2025)
- IR 05000491/1979011 + (08:53:45, 3 January 2025)
- ML19275A008 + (08:53:49, 3 January 2025)
- ML19275A007 + (08:53:51, 3 January 2025)
- ML19275A006 + (08:53:52, 3 January 2025)
- ML19275A004 + (08:53:53, 3 January 2025)
- ML19275A003 + (08:53:56, 3 January 2025)
- ML19275A002 + (08:53:57, 3 January 2025)
- ML19275A001 + (08:54:04, 3 January 2025)
- ML19275A000 + (08:54:07, 3 January 2025)
- ML19274G224 + (08:54:09, 3 January 2025)
- ML19274G223 + (08:54:12, 3 January 2025)
- ML19274G222 + (08:54:14, 3 January 2025)
- ML19274G220 + (08:54:16, 3 January 2025)