ML19275A003

From kanterella
Jump to navigation Jump to search
Forwards Request for Addl Info Based on Review of FSAR
ML19275A003
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 07/02/1979
From: Baer R
Office of Nuclear Reactor Regulation
To: Gary R
TEXAS UTILITIES CO.
References
NUDOCS 7908300465
Download: ML19275A003 (5)


Text

b { ff l

,{ y... mjo.

UNITED STATES y ) ) s.,(

{

NUCLEAR REGULATORY COMMISSION

,/\\

E WASWNGTON, D. C. 20555 s,**

f,$,

k gg g Docket Nos. 50-445 and 50-446 Mr. R. J. Gary Executive ' lice President and General fianager Texas Utilities Generating Company 2001 Byran Towers Dallas, Texas 75201

Dear Mr. Gary:

SUBJECT:

REOUEST FOR ADDITIONAL INFORMATION FOR CCMANCHE PEAK STEAM ELECTRIC STATION, UNITS 1 AND 2 Enclosed is a request for additional infonnation which we require to complete our evaluation of your application for operating licenses for Comanche Peak Steam Electric Station, Units 1 and 2.

This request for additional infor.ation is the result of our review by the Effluent Treatment Systems Branch and tne Quality Assurance Branch of the information in your FSAR.

Please amend your FSAR to include the information requested in the Enclosures.

Your schedule for responding to the enclosed requests for additional infonnation should be submitted within four weeks.

Sincerely,

& f f. ht:"7 i

R'obert L. Baer, Chief Light Water Reactors Branch No. 2 Division of Project Management

Enclosures:

1.

Request for Additional Information -

Effluent Treatment Systems Branch 2.

Request for Additional Information -

Quality Assurance 2(J }gj ces w/ enclosure: See next page 790830>/65

Mr. R. J. Gary JUL 2 1979 M r. R. J. G a ry Executive Vice President and General Manager Texas Utilities Generating Ccapany 2001 Bryan Towers Dallas, Texas 75201 Nicholas S. Reynolds Esq. Debevoise & Liberman 1200 Seventeenth Street Washington, D.C. 20036 Spencer C. Relyea, Esq. Worsham, Forsythe & Sampels 2001 Bryan Tower Dallas, Texas 75201 Mr. Homer C. Schmidt Project Manager - Nuclear Plants Texas Utilities Generating Company 2001 Bryan Tower Dallas, Texas 75201 Mr. H. R. Rock Gibbs and Hill, Inc. 393 Seventh Avenue New York, New York 10001 Mr. A. T. Parker Westinghouse Electric Corporation P. O. Box 355 Pittsburgh, Pennsyltania 15230 Richard W. Lowerre, Esq. Assistant Attorney Gener al Environmental Protection Division P. O. Box 12548, Capitol Station Austin, Texas 78711 Mrs. Juanita Ellis, President } } } } '.) 9 $ Citizens Associotion for Sound Energy 1426 South Polk Dallas, Texas 75224 Geoffrey M. Gay, Esq. West Texas Legal Services 406 W.T. Waggoner Building 810 Houston Street Fort Worth, Texas 76102

2 tg Mr. R. J. Gary Ms. Nancy Holdam Jacobson Citizens for Fair Utility Regulation 1400 Hemphill Fort Worth, Texas 76104 Mr. Richard Fouke 1668-B Carter Drive Arlington, Texas 76010 2032 096

ENCLOSURE 1 3". 2 EU9 REQUEST FOR ADDITIONAL INFORMATION _ COMANCHE PEAK STEAM ELECTRIC STATION, UNITS 1 AND 2 TEXAS UTILITIES GENERATING CCMPANY DOCKET N05. 50-445/50-446 320.0 EFFLUENT TREATMENT SYS E?tS 320.12 In the JSAR, you have elected to be evaluated according to the Annex to Appendix I of 10CFRSO. In accordance with Appendix I, Section V, additional information is necessary to evaluate the means employed for keeping levels of radioactivity in effluents to unrestricted areas, ALARA. Therefore, provide the folicwing information: a) Give the elevation above grade and dimensions at the exit of each unit vent. b) Give the number of roof exhausters on the turbine building ventilation system. Clarify if diffusers s are used as shown on Figure 9.4-3 of the FSAR. c) Estimate the air temperature, normal and periodic release velocity for each gaseous release point. d) Provide a plan view of the building complex shcuing the location of normal and potentially radioactive gaseous release points, within the site bouncary. e) Provide a plan view showing the location of normal and potentially radioactive liquid release points, within the site boundary. 2032 097

JUL 2 syg ENCLOSURE 2 REQUEST FOR A00!!ICNAL INFORM ** ION CCMANCHE" PEAK STEAM ELECTRIC STATION, UN!!S 1 ANO 2 TEXAS UTILITIES GENERATING CCMPANY 00CKET NOS. 50-445/50-446 421.0 QUALITY ASSURANCE 421.77 Page 17-iv, " List of Tables," Table 17.1-1, " Interface Centrol and QA Responsibility," is listed in the actual text as "QA Program Ccapliance Ma tri x." Also, Table 17.1-2 on page 17-iv, "0A Program Compliance Ma trix" is titled in the actual text as "QA Plan Compliance Matrix." P! case modify your description and correct the above discrepancies. 421.78 Page 17-v, " List of Figures," contains Figures 17.1-Sa,17.;-5b. anc 17.1-5c and the actual text only contains Figure 17.1-5. Please revise your description and correct the above discrepancy. 421.79 Revised paragraph 17.1.3.2 on page 17.1-18 deleted the description addressing the prncedural control for standard "of f the shelf" commercial c oreviously approvcd materials, parts, and equipment essential to the safety-reia;2d functions of structures, systems, and comoonents. Please modify your program . accordingly to include procedural controls which address the above design cri teria. 421.80 Revised paragraphs 17.1.3.2,17.1.3.3, and 17.1.3. A on page IS do no t iden ti fy the individual (s) or group (s) responsible for the particular ecviews and whether the results of these revisions are documented. Modify your description to address the above concerns. 2032 098}}