ML19275A034
| ML19275A034 | |
| Person / Time | |
|---|---|
| Site: | Brunswick |
| Issue date: | 08/02/1979 |
| From: | Furr B CAROLINA POWER & LIGHT CO. |
| To: | James O'Reilly NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| References | |
| GD-79-1974, NUDOCS 7908300588 | |
| Download: ML19275A034 (1) | |
Text
'
Cp&L Carolina Power & Light Company August 2, 1979
~~
FILE: NG-3513 (B)
SERIAL: GD-79-1974
,j fC Mr. James P. O'Reilly, Director 7
U. S. Nuclear Regulatory Commission Region II 101 Marietta Street, Suite 3100 m
Atlanta, GA 30303 tv BRUNSWICK STEAM ELECTRIC PLANT, UNIT NOS.1 AND 2 DOCKET NOS. 50-325 AND 50-324 LICENSE NOS. DPR-71 AND DPR-62 RESPONSE TO IE BULLETIN 79-14
Dear Mr. O'Reilly:
Bulletin 79-14, July 2, 1979, and Revision 1 to the bulletin, July 18, 1979, requested that all licensees verify that plant sesmic analyses had used as-built piping and support configuration. This letter documents our compliance with the requirements of Bulletin 79-14.
The Brunswick Plant was nearing the completion of an extensive seismic reanalysis and as-built configuration verification when Bulletin 79-14 was issued. This entire program has been the subject of several meetings and many letters between CP&L and the NRC staff.
CP&L letter GD-79-1844 from Mr. E. E. Utley to Mr. T. A. Ippolito with a copy to you summarized our actions in this matter. This letter, along with the data previously supplied to the NRC staff re.rerenced in the letter, satisfies the requirements of Bulletin 79-14.
We trust that this information is suitable for your use. If you have any further questions, please do not hesitate to call my staff.
Yours very truly, Ad/
J. Furr Manager Generation Department CSB/jga*
cc: Director, Office of Inspection & Enforcement 207i
- ) 11 Director, Division of Operating Reactors 411 Fayettevifie Street
- P. O Box 1551
- Raleigh. N C. 27602 vo n8300589