Forwards IE Insp Repts 50-491/79-11,50-492/79-11 & 50-493/79-11 on 790705-06.No Noncompliance Noted
ML19275A008
Person / Time
Site: Cherokee  Duke Energy icon.png
Issue date: 07/19/1979
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Dail L
DUKE POWER CO.
Shared Package
ML19275A005 List:
References
NUDOCS 7908300480
Download: ML19275A008 (2)


See also: IR 05000491/1979011

Text

.

.

"

  1. pa af og'o,

UNITED STATES

j

NUCLEAR REGULATORY COMMISSION

'

E j ;?"

m

REGION 11

J'

s

8

101 MARIETT A sT., N.W., SUITE 3100

0,

8

ATLANTA, GEORGI A 30303

g 's a j

JUL 191979

In Reply Refer To:

LII:JRH

50-491/79-11

50-492/79-11

50-493/79-11

Duke Power Company

ATTN:

L. C. Dail, Vice President

Design Engineering

P. O. Box 33189

Charlotte, N C 28242

Gentlemen:

This refere to the insoection conducted by J. R. Harris of this office on

July 5-6,1979, of act2vities authorized by NRC Construction Permit Nos. CPPR-167,

CPPR-168 and CPPR-169 for the Cherokee Nuclear Station Unit 1, 2 and 3 facilities,

and to the discussion of our findings held with C. B. Aycock at the conclusion

of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report. Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews

with personnel, and observations by the inspector.

Within the scope of this inspection, no items of noncompliance were disclosed.

We have examined actions you have taken with regard to previously identified

enforcement matters. These are discussed in the enclosed inspe-etion report.

It accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document Room.

If this

report contains any information that you (or your contractor) believe to be

proprietary, it is necessary that you make a written application within

20 days to this office to withhold such information from public disclosure.

Any such application must include a full statement of the reasons on the basis

of which it is claimed that the information is proprietary, and should be

prepared so that proprietary inforr ation identified in the application is

contained in a separate part of the document.

If we do not hear from you in

this regard within the specified period, the report will be placed in the

Public Document Room.

2032

100

7908300gro

.

.

.

.

Duke Power Company

-2-

Should you have any questions concerning this letter, we will be glad to

discuss them with you.

Sincerely,

d

C. E. Plurphy', Criief

Reactor Construction and Engineering

Support Branch

Enclosure:

..ispection Report Nos. 50-491/79-11,

50-492/79-11 and Sn-493/79-11