ML19275A008
| ML19275A008 | |
| Person / Time | |
|---|---|
| Site: | Cherokee |
| Issue date: | 07/19/1979 |
| From: | Murphy C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Dail L DUKE POWER CO. |
| Shared Package | |
| ML19275A005 | List: |
| References | |
| NUDOCS 7908300480 | |
| Download: ML19275A008 (2) | |
See also: IR 05000491/1979011
Text
.
.
"
- pa af og'o,
UNITED STATES
j
NUCLEAR REGULATORY COMMISSION
'
E j ;?"
m
REGION 11
- J'
s
8
101 MARIETT A sT., N.W., SUITE 3100
0,
8
ATLANTA, GEORGI A 30303
g 's a j
JUL 191979
In Reply Refer To:
LII:JRH
50-491/79-11
50-492/79-11
50-493/79-11
Duke Power Company
ATTN:
L. C. Dail, Vice President
Design Engineering
P. O. Box 33189
Charlotte, N C 28242
Gentlemen:
This refere to the insoection conducted by J. R. Harris of this office on
July 5-6,1979, of act2vities authorized by NRC Construction Permit Nos. CPPR-167,
CPPR-168 and CPPR-169 for the Cherokee Nuclear Station Unit 1, 2 and 3 facilities,
and to the discussion of our findings held with C. B. Aycock at the conclusion
of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report. Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews
with personnel, and observations by the inspector.
Within the scope of this inspection, no items of noncompliance were disclosed.
We have examined actions you have taken with regard to previously identified
enforcement matters. These are discussed in the enclosed inspe-etion report.
It accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and the enclosed
inspection report will be placed in the NRC's Public Document Room.
If this
report contains any information that you (or your contractor) believe to be
proprietary, it is necessary that you make a written application within
20 days to this office to withhold such information from public disclosure.
Any such application must include a full statement of the reasons on the basis
of which it is claimed that the information is proprietary, and should be
prepared so that proprietary inforr ation identified in the application is
contained in a separate part of the document.
If we do not hear from you in
this regard within the specified period, the report will be placed in the
Public Document Room.
2032
100
7908300gro
.
.
.
.
Duke Power Company
-2-
Should you have any questions concerning this letter, we will be glad to
discuss them with you.
Sincerely,
d
C. E. Plurphy', Criief
Reactor Construction and Engineering
Support Branch
Enclosure:
..ispection Report Nos. 50-491/79-11,
50-492/79-11 and Sn-493/79-11
cc w/ enc 1:
J. T. Moore, Project Manager
P. O. Box 422
Gaffney, S C 29340
2032
101