Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- IR 05000295/1997003 + (14:45:09, 3 December 2024)
- ML20217A304 + (14:45:09, 3 December 2024)
- ML20217A303 + (14:45:10, 3 December 2024)
- ML20217A302 + (14:45:10, 3 December 2024)
- ML20217A300 + (14:45:11, 3 December 2024)
- 05000295/LER-1997-004-01, :on 970221,reactor Was Shutdown,Per LCO 3.6.1 Due to One Inoperable Containment Spray pump.1C CS Pump Day Tank Was Drained,Flushed,Refilled w/biocide-added Fuel from Different Source + (14:45:13, 3 December 2024)
- 3F1190-01, Forwards Rev 5-4 to Security Training & Qualification Plan. Rev Withheld (Ref 10CFR73.21) + (14:45:14, 3 December 2024)
- ML20217A295 + (14:45:14, 3 December 2024)
- ML20217A292 + (14:45:15, 3 December 2024)
- ML20217A290 + (14:45:15, 3 December 2024)
- ML20217A289 + (14:45:16, 3 December 2024)
- 05000255/LER-1997-013, :on 971110,determined Check Valves in Min Flow Recirculation Piping from Discharge of Each HPSI Pump Were Not Periodically Tested to Confirm Closure Capability.Caused by Inadequate Understanding.Database Revised + (14:45:18, 3 December 2024)
- ML20217A283 + (14:45:19, 3 December 2024)
- ML20217A284 + (14:45:19, 3 December 2024)
- LIC-97-0150, Forwards Response to NRC Re Violations Noted in Insp Rept 50-285/97-15 on 970615-0802.Corrective Actions: Individuals Involved Have Been Counseled Re Responsibilities for Control of Work Request Stickers + (14:45:22, 3 December 2024)
- ML20217A280 + (14:45:23, 3 December 2024)
- ML20217A276 + (14:45:24, 3 December 2024)
- ML20217A279 + (14:45:24, 3 December 2024)
- 05000364/LER-1998-001-05, :on 980328,manual Reactor Trip Due to Dropped Control Rod K-2,was Determined.Caused by Overcurrent Condition.Crdm Cable & Connectors Associated W/Rod K-2 Will Be Replaced & Rod Will Be Tested During Startup Testing + (14:45:26, 3 December 2024)
- 05000364/LER-1990-003-01, :on 901013,Tech Spec 3.0.3 Entered Due to Intermediate Range Nuclear Detectors Being Declared Inoperable + (14:45:42, 3 December 2024)
- ML20217A271 + (14:45:43, 3 December 2024)
- 05000454/LER-1998-010-01, :on 980318,failure to Perform in Service Testing After Maintenance Was Noted.Caused by Poor Communication.Problem Identification Form B1998-01335 Was Initiated on 980320,to Investigate Event + (14:45:45, 3 December 2024)
- ML20217A267 + (14:45:46, 3 December 2024)
- ML20217A266 + (14:45:47, 3 December 2024)
- ML20217A265 + (14:45:48, 3 December 2024)
- ML20217A264 + (14:45:48, 3 December 2024)
- ML20217A262 + (14:45:49, 3 December 2024)
- ML20217A261 + (14:45:49, 3 December 2024)
- ML20217A257 + (14:45:50, 3 December 2024)
- 05000334/LER-1999-010, :on 990906,reactor Manually Tripped Due to Main Unit Generator Voltage Regulator Malfunction.Logic Drawer of Voltage Regulator for Main Unit Generator Was Replaced with Spare.With + (14:45:52, 3 December 2024)
- ML20217A253 + (14:45:53, 3 December 2024)
- ML20217A254 + (14:45:53, 3 December 2024)
- 05000454/LER-1998-009-01, :on 980318,TS Test Was Missed Due to Failure to Follow Procedure.Caused by Personnel Error.Operations Department Head Will Discuss Rept W/All Mgt & Operators + (14:45:56, 3 December 2024)
- ML20217A251 + (14:45:56, 3 December 2024)
- ML20217A249 + (14:45:57, 3 December 2024)
- 05000364/LER-1998-001, Forwards LER 98-001-00 Re Manual Reactor Trip Due to Dropped Control Rod K-2.Two NRC Commitments Contained in Corrective Action Section of LER + (14:45:58, 3 December 2024)
- IR 05000331/1997013 + (14:46:00, 3 December 2024)
- ML20217A243 + (14:46:01, 3 December 2024)
- ML20217A242 + (14:46:01, 3 December 2024)
- ML20217A237 + (14:46:02, 3 December 2024)
- ML20217A236 + (14:46:02, 3 December 2024)
- NOC-AE-000651, Suppl to 980507 Application for Amends to Licenses NPF-76 & NPF-80,to Remove Parameters No Longer Applicable & Adding Tdf Value for Model 94 SGs in Place of Reactor Coolant Sys Flow. Ts,With Changes,To Demonstrate Intended Affect,Encl + (14:46:03, 3 December 2024)
- ML20217A233 + (14:46:04, 3 December 2024)
- PNO-I-98-003A, on 980316,licensee Informed Region I That Missing Gauge Arrived.Smith & Region I Investigating Circumstances of Gauge Return.Region I Will Continue Review of Incident in Cooperation W/State of AL + (14:46:05, 3 December 2024)
- ML20217A225 + (14:46:06, 3 December 2024)
- ML20217A224 + (14:46:07, 3 December 2024)
- ML20217A222 + (14:46:07, 3 December 2024)
- ULNRC-03771, Provides Addl Info in Support of Amend Request Re MSSV Setpoint Tolerance Revision,Based on Discussions W/Nrc Project Manager on 980312 + (14:46:08, 3 December 2024)
- ML20217A220 + (14:46:08, 3 December 2024)
- ML20217A215 + (14:46:09, 3 December 2024)
- IR 05000213/1990083 + (14:46:21, 3 December 2024)
- ML20217A209 + (14:46:22, 3 December 2024)