Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20217G354 + (13:44:35, 3 December 2024)
- CY-98-053, Forwards Rev 2 to Calculation RAB98-01620-RY, Scatter Dose Rates Due to Cy Spent Fuel Pool Draindown. Loss of All Spent Fuel Pool Water Regarded as non-mechanistic,beyond Design Basis Event + (13:44:36, 3 December 2024)
- ML20217G346 + (13:44:37, 3 December 2024)
- ML20217G349 + (13:44:37, 3 December 2024)
- NRC-99-0095, Monthly Operating Rept for Sept 1999 for Fermi 2.With + (13:44:38, 3 December 2024)
- ML20217G342 + (13:44:39, 3 December 2024)
- ML20217G340 + (13:44:39, 3 December 2024)
- ML20217G338 + (13:44:40, 3 December 2024)
- ML20217G337 + (13:44:41, 3 December 2024)
- ML20217G336 + (13:44:41, 3 December 2024)
- ML20217G334 + (13:44:42, 3 December 2024)
- ML20217G329 + (13:44:43, 3 December 2024)
- 05000304/LER-1996-004-02, :on 970423,radiation Protection Technicians Had Difficulty Operating Inner Containment Air Lock While Entering to Take Daily Samples.Caused by Mgt Deficiency. Existing Preventive Maint Program Revised + (13:44:47, 3 December 2024)
- ML20217G325 + (13:44:48, 3 December 2024)
- ML20217G324 + (13:44:48, 3 December 2024)
- ML20217G322 + (13:44:49, 3 December 2024)
- ML20217G320 + (13:44:50, 3 December 2024)
- 05000304/LER-1996-004-01, Forwards LER 96-004-01 Re Results of Investigation Into Failure of Unit Containment Inner Air Lock Door.Addl Corrective Action Listed in Attachment a + (13:44:52, 3 December 2024)
- ML20217G316 + (13:44:52, 3 December 2024)
- 05000289/LER-1998-004, :on 980218,loss of CS Capability Was Noted. Caused by Improper Assembly of RBS Pump Discharge Valve Control Switch Pushbutton.Pushbutton Switch Was Replaced W/New Properly Assembled Pushbutton Switch + (13:44:54, 3 December 2024)
- ML20217G311 + (13:44:55, 3 December 2024)
- ML20217G313 + (13:44:55, 3 December 2024)
- ML20217G310 + (13:44:56, 3 December 2024)
- ML20217G309 + (13:44:57, 3 December 2024)
- ML20217G308 + (13:44:57, 3 December 2024)
- ML20217G307 + (13:44:58, 3 December 2024)
- ML20217G303 + (13:44:59, 3 December 2024)
- ML20217G304 + (13:44:59, 3 December 2024)
- ML20217G299 + (13:45:01, 3 December 2024)
- ML20217G298 + (13:45:02, 3 December 2024)
- ML20217G294 + (13:45:03, 3 December 2024)
- ML20217G296 + (13:45:03, 3 December 2024)
- JPN-97-032, Forwards Application for Amend to License DPR-59,reflecting Change in LCO + (13:45:04, 3 December 2024)
- ML20217G292 + (13:45:04, 3 December 2024)
- JPN-99-035, Forwards Comments on Version 2 of Reactor Vessel Integrity Database for Plant.Table Listing Recommended Changes to Info in Rvid,Encl as Attachment 1 + (13:45:05, 3 December 2024)
- RBG-44110, Forwards Response to 970616 RAI Re Request for Deviation from 10CFR50,App R,Section III.G.2,involving Use of Partial Area Automatic Suppression Sys in Lieu of Full Area Suppression Sys in Fire Area C-16 + (13:45:06, 3 December 2024)
- ML20217G285 + (13:45:07, 3 December 2024)
- ML20217G283 + (13:45:08, 3 December 2024)
- ML20217G282 + (13:45:08, 3 December 2024)
- ML20217G281 + (13:45:09, 3 December 2024)
- ML20217G280 + (13:45:09, 3 December 2024)
- ML20217G279 + (13:45:10, 3 December 2024)
- ML20217G278 + (13:45:11, 3 December 2024)
- ML20217G277 + (13:45:11, 3 December 2024)
- ML20217G275 + (13:45:12, 3 December 2024)
- ML20217G273 + (13:45:12, 3 December 2024)
- ML20217G269 + (13:45:13, 3 December 2024)
- ML20217G270 + (13:45:13, 3 December 2024)
- ML20217G268 + (13:45:14, 3 December 2024)
- ML20217G266 + (13:45:15, 3 December 2024)
- ML20217G267 + (13:45:15, 3 December 2024)
- ML20217G265 + (13:45:16, 3 December 2024)