Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20217K774 + (13:14:07, 3 December 2024)
- ML20217K773 + (13:14:07, 3 December 2024)
- ML20217K772 + (13:14:08, 3 December 2024)
- ML20217K771 + (13:14:08, 3 December 2024)
- ML20217K770 + (13:14:09, 3 December 2024)
- 05000245/LER-1997-036-01, :on 970929,fire Pump Room Flooded Through Floor Drain During Hurricane.Caused by Weakness in Design Change Process.Nneco Will Inspect Fire Pump House to Identify Addl Leakage Paths Into Structure + (13:14:11, 3 December 2024)
- ML20217K764 + (13:14:12, 3 December 2024)
- ML20217K765 + (13:14:12, 3 December 2024)
- ML20217K762 + (13:14:13, 3 December 2024)
- ML20217K763 + (13:14:13, 3 December 2024)
- 05000245/LER-1997-036, Forwards LER 97-036-00,which Documents Event That Occurred at Mnps,Unit 1 on 970929.Commitment Made within Ltr,Listed + (13:14:14, 3 December 2024)
- ML20217K757 + (13:14:15, 3 December 2024)
- ML20217K758 + (13:14:15, 3 December 2024)
- ML20217K756 + (13:14:16, 3 December 2024)
- ML20217K753 + (13:14:18, 3 December 2024)
- ML20217K754 + (13:14:18, 3 December 2024)
- ML20217K752 + (13:14:19, 3 December 2024)
- ML20217K751 + (13:14:20, 3 December 2024)
- ML20217K749 + (13:14:20, 3 December 2024)
- ML20217K747 + (13:14:21, 3 December 2024)
- ML20217K748 + (13:14:21, 3 December 2024)
- ML20217K746 + (13:14:23, 3 December 2024)
- ML20217K744 + (13:14:23, 3 December 2024)
- ML20217K743 + (13:14:24, 3 December 2024)
- ML20217K742 + (13:14:25, 3 December 2024)
- ML20217K741 + (13:14:25, 3 December 2024)
- ML20217K736 + (13:14:26, 3 December 2024)
- ML20217K738 + (13:14:26, 3 December 2024)
- 05000336/LER-1999-012, :on 990917,unrecoverable CEA Misalignment Entry Into TS 3.0.3 Was Noted.Caused by Grounded Coil Wire for Lower Gripper Assembly.Leads Leading to Lower Gripper Coil Were Insulated + (13:14:28, 3 December 2024)
- SVP-97-242, Forwards Updated FSAR to Quad Cities Nuclear Power Station,Units 1 & 2 & Detailed Change Log Which Identifies & Explains All Changes + (13:14:29, 3 December 2024)
- ML20217K732 + (13:14:30, 3 December 2024)
- 05000266/LER-1996-016, :on 961030,discovered as-found Lift Pressure for Unit 2 Pressurizer Safety Valve 2RC-434 Exceeded Max Lift Pressure Allowed by ASME Code.Caused by Use of Ambient Temp in Test Lab.Set Valve at More Appropriate Ambient Temp + (13:14:33, 3 December 2024)
- ML20217K725 + (13:14:34, 3 December 2024)
- ML20217K724 + (13:14:35, 3 December 2024)
- ML20217K719 + (13:14:38, 3 December 2024)
- ML20217K718 + (13:14:39, 3 December 2024)
- ML20217K717 + (13:14:40, 3 December 2024)
- 05000440/LER-1997-012, :on 970923,reactor Protection Sys Actuation Occurred.Caused by Insufficient Procedural Guidance.Rps Sys Operating Instruction Revised to Include Table/Checklist of Reactor Mode Switch Positions & Effects on RPS Signals + (13:14:41, 3 December 2024)
- ML20217K712 + (13:14:42, 3 December 2024)
- ML20217K709 + (13:14:44, 3 December 2024)
- ML20217K711 + (13:14:44, 3 December 2024)
- 05000277/LER-1997-006-02, :on 970923,DG Auto Start During 4-kV Relay Testing Occurred.Caused by Personnel Error.Need for Exercising Caution When Removing or Installing Relay Cover Was Discussed W/I&C Technicians + (13:14:46, 3 December 2024)
- ML20217K706 + (13:14:47, 3 December 2024)
- ML20217K702 + (13:14:48, 3 December 2024)
- ML20217K701 + (13:14:49, 3 December 2024)
- ML20217K700 + (13:14:50, 3 December 2024)
- ML20217K699 + (13:14:51, 3 December 2024)
- ML20217K696 + (13:14:52, 3 December 2024)
- ML20217K688 + (13:14:54, 3 December 2024)
- ML20217K695 + (13:14:54, 3 December 2024)
- ML20217K687 + (13:14:55, 3 December 2024)
- ML20217K685 + (13:14:56, 3 December 2024)