ML20217K700

From kanterella
Jump to navigation Jump to search
Amend 145 to License NPF-49,modifying TS Surveillance Requirements 4.4.1.3.3 to Be Consistent with Requirements of TS 3.4.1.3
ML20217K700
Person / Time
Site: Millstone Dominion icon.png
Issue date: 08/05/1997
From: Mckee P
NRC (Affiliation Not Assigned)
To:
Shared Package
ML20217K704 List:
References
NUDOCS 9708180065
Download: ML20217K700 (4)


Text

.-

. ~.

k UNITE 3 STATES y*

g

,j NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 30MH001 o%...../

NORTHEAST NUCLEAR ENERGY COMPANY. ET AL.

DOCKET NO. 50-411 HILLSTONE NUCLEAR POWER STATION. UNIT NO. 3 AMENDMENT TO FACILITY OPERAllNG LICENSE Amendment No.145 License No. NPF-49 1.

The Nuclear Regulatory Commission (the Comission) has found that:

A.

The application for amendment by Northeast Nuclear Energy Company, et al. (the licensee) dated June 13, 1997, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.

There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.

The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

(

~

9708100065 970005 PDR ADOCK 05000423 P

PDR

. 2.

Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2)llows:of facility Operating License No. NPF-49 is hereby amended to. read as fo (2)

Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No.145, and the Environmental Protection Plan contained in Appendix B, both of which are_ attached hereto are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.

3.

This license amendment is effective as of the date of its issuance, to be implemented within 60 days of issuance.

FOR THE NUCLEAR REGULATORY COMMISSION j'

9771L PhillipFfMcKee Deputy Director for Licensing Special Projects Office Office of Nuclear Reactor Regulation

Attachment:

Changes to the Technical Specifications Date of issuance:

August 5, 1997 1

I'

--n

-- - - -,. - = -, - --n- - - -,... ---

- _.. _ - - - -. _ - _ _ - -. =

r ATTACHMENT TO LICENSE AMENDMENT NO.145 FACILITY OPERATING LICENSE NO. NPF-49 DOCKET NO. 50-423 I

Replace the following page of the Appendix A, Technical Specifications, with l

the attached page.

The revised page is identified by amendment number and contains a vert < cal line indicating the area of change.

Remove Insert 3/4 4-4 3/4 4-4 t

9 i

e e

..-,...__,,,,__,__,,,,,-.,..~,..i..~,y.

r,-..

_.-,-,,_.,,_._,__,c_..,_.,__

REACTOR COOLANT SYSTEM H0T SHl1TDOWN SURVEILLANCE REQUIRENENTS 4.4.1.3.1 The required reactor coolant pump (s), if not in o)eration, shall be determined OPERABLE once per 7 days by verifying correct broa cer alignments and indicated power availability.

4.4.1.3.2 The required steam generator (s) shall be determined OPERABLE by verifying secondary side water level to be greater than or equsi to 17% at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

4.4.1.3.3 The required loops shall be verified in operation and circulating l reactor coolant at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />, i

gifL5 TONE-UNIT 3 3/44-4 Amendment No.145

-